My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-03-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
FULL AGENDA PACKET_2021-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 11:27:07 AM
Creation date
7/8/2021 4:07:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/16/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Check exhaust fan belts for wear, replace aorequired. <br />8. Check belt tension and sheave alignment and adjust oarequired <br />Q. Inspect exhaust fan unit assembly earequired. <br />10. Check all mounting hardware and tighten oorequired. <br />Pneumatic Air Compressor: <br />1. Inspect unit, check for rust spots, oil leaks & general condition nfunit aarequired. <br />2. Drain tank, check auto drain aarequired. <br />3. Check belt, adjust tension & sheave alignments, and replace belt as required. <br />4. Meg -ohm and record, aarequired. <br />5. Check starter wiring & contacts as required. <br />6. Check motor amperage & voltage aarequired. <br />7. Check intake air filter, replace aarequired. <br />Air Handlers: <br />1. Provide four (4) quarterly inspections and maintenance for (21)Air Handlers <br />2. Preventive maintenance aerequired. <br />3. Lock -out and Tag -out equipment onrequired. <br />4. Check starter contacts for excessive wear aaneeded. <br />5. Tighten all starter wire connections aorequired. <br />S. Check belts, adjust orreplace aaneeded. <br />7. Check pulley sheave alignment, adjust aurequired. <br />8. Meg -Ohm motor and record annually. <br />A� Check fan motor(s) amps. <br />Q. Clean and lubricate unit motor bearings and fan bearings. <br />10. Check operation nfeconomy dampers. <br />11. Lubricate all dampers and linkages amnecessary. <br />12. Check operation ofstatic vane (if app|ioab|e) <br />13. Visually check all coils for leaks (AnnueUy) <br />14. Check and record all coil delta T(Amnuu||y) <br />15. Inspect all mounting hardware, tighten aaneeded. <br />Multi -zone Air Handlers: 011 Dispatch Area <br />1. Provide annual Preventive Maintenance Inspection ontwo (2) York Air Handlers, <br />2. Preventive maintenance anrequired. <br />3. Lock -out and Tag -out equipment aarequired. <br />4. Check fan motor amps oorequired. <br />5. Clean and lubricate components aarequired. <br />S. Check operation ofeconomy dampers osrequired. <br />7. Check operation nfstatic vane ordampers oarequired. <br />D. Check operation ofzone dampers earequired. <br />Q. Check and adjust operating and safety controls aerequired. <br />Package Chiller: <br />1. Lock -out and Tag -out equipment amrequired. <br />2. Check condenser / Barrel tubes onrequired. <br />3. Check Chiller barrel tube amrequired. <br />4. Check and record unit amp draw oarequired. <br />5. Check unit Voltage and Record aorequired. <br />City Council <br />;&m6mpj28 <br />3/16/2021 <br />&oouy; <br />
The URL can be used to link to this page
Your browser does not support the video tag.