My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
FULL AGENDA PACKET_2021-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 3:30:11 PM
Creation date
7/8/2021 4:52:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/18/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pkua Check & Permits <br />C,orl Str7rCtlon drawings shall be in accordance with the 2019 California Building Code and the <br />Americans with Disabilities Act and will nquirc review/approval by the City Plarrnin., and Building <br />Agency. <br />As a condition of plan clleck approval_ plans, specifications and StrnCltual CalCulanons 111rr5t be signed <br />by a California licensed arclikeet / landscape atchltect / civil engiocclas appt'opi iate. <br />Construction drawings shall be submitted at QW/o completion tirr constrttctability review by Public <br />Works Design Constivetion linLincering Divisions, and revised as directed. The 100% complete <br />construction drawing package will then be subirilled for final City review to the rollowing Cily <br />Agencies: <br />• Parks, Rcereation and Community Services Agency <br />• Planning and Building Agency (Building, Electrical, Plumbing, SAPD) <br />• Public Works Agency <br />Drawings should be inclexed and oreanized so they can he separated cleanly for individual reviews <br />by the Planning and Building Agency. The Public Works Agency Project Manager will coordinate <br />the submittal and review process- Once wmplete, the a>nsuhant will revise the Contract Documents <br />Technical ,Specijication.s <br />Technical specifications for all components listed above shall be provided by Consultant, or their <br />Sub -consultants, to the City in CST (Construction Specifications Tnstiuuc) lirrntat- City Staff will <br />combinee these specifications with the City Boiler Plate Specifications which together, will become <br />the Project Manual. <br />Final Opinion of'Prohuble Cost <br />Con chant shall ptovide updated opinion ol'pr-obable construction cost which ;hall reflect finalized <br />plans, materials, systems, details of constnlction, and known or anticipated chauges in the bidding <br />market relative to the project. Should project scope exceed available budget, project <br />plans/speci f ications will be phased as appropriate. <br />Task 4: Bid Advertisement, Construction Administration, Record Drmvings: <br />Bid_Adr rtiscincrrt <br />Consultant shall provide support to the City during the Bidding phase by assisting with <br />questions, requests for information/clarification, or conflicts arising out of the bidding <br />process. Consultant shall also attend pre -bid meeting, if scheduled. <br />Constriection Adrniretstratiou <br />Consultant shall provide support to the City during the Construction Administration phase by <br />assisting with questions, requests for intormation/clarification, and reviewing submittals. <br />City Council City of Santa Ana IIrW2"54 5/18/2021 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.