My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-05-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
FULL AGENDA PACKET_2021-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 3:30:11 PM
Creation date
7/8/2021 4:52:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/18/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nli [ Itl I''IVn 'li-1�9 <br />.;;rl Or r, [' ash M �izi o Tl f,l f.nlian<<, f <br />checking. Unit prices will be based on recent City projects <br />adjusted for inflation using applicable price index data. An <br />appropriate contingency will be included to reflect the level <br />of design at the time of the estimate. An updated estimate <br />will be included with each plan submittal (90% and Final). <br />At this stage, the opinion of probable cost will be a key item <br />since with the added design evolution it will be more <br />accurate and any variance from the available funding can <br />be addressed by scope adjustment (increase or decrease <br />as needed). In the Understanding of Need section above, <br />the H&A Team has identified several cost reduction <br />measures to be considered. <br />Prior to the submittal to the City for review, the documents <br />will go through the H&A QA/QC process described <br />elsewhere in this proposal. <br />AS 'N.3 ...r.„ —.', rrI"Z5 <br />The H&A Team will first address all City staff review <br />comments made on the 506A submittal and make the <br />necessary revisions. Next the documents will be <br />developed into a complete set of bid documents for the <br />90% submittal. H&A intends there will be few, if any, City <br />review comments on the 90% submittal. The package will <br />include all of the items listed in the RFP on page A1-3 and <br />be ready for building permit submittal with all required <br />supporting calculations and documentation. <br />Specifications <br />The specifications will include the City's boiler -plate <br />specifications and technical specifications complete and in <br />full conformance with City requirements. All technical <br />specifications will be based on Greenbook standards or <br />City provided sections. <br />Permitting <br />As with the earlier packages, prior to the submittal to the <br />City for review, the documents will go through the H&A <br />QA/QC process described elsewhere in this proposal. <br />Our goal is to have a single building permit review and then <br />approval upon resubmittal; however, we have included a <br />second cycle in our schedule to be conservative. <br />The final set of bid documents will incorporate all the City <br />review <br />BreakdownWork <br />G : QC Review <br />H&A Team <br />50% City review - prepare <br />agenda, hold meetinq, <br />CITY and H&A <br />prepare minutes, revise <br />Team <br />plans <br />NlliiiPl <br />A Develop 90% design plans - <br />H&A Team <br />Civil Engineering <br />Develop 90% design plans <br />— Structural (fvf, fo)wic <br />B1'r .ffr"^v� B'Bd gn NB'; s?q:f <br />8sparv.<..;rad.^;arrtq <br />H&A Team <br />d;.ltl@D�Bfd?WdTP"'a"d/WM6omlarua;f <br />rfr3d"b'6"„I �apbv:,'d pCrd 4fF"+»frd rdpY <br />farga'hio 01m9gBB al0q..1) <br />Develop 90% design plans - <br />H&A Team <br />Landscape <br />0 Develop 90% design plans - <br />H&A Team <br />Electrical <br />3 E Update cost estimate to <br />H&A Team <br />90% level <br />F Prepare draft technical <br />H&A Team <br />specifications <br />G QC Review <br />H&A Team <br />90% City review - prepare <br />i agenda, hold meeting, <br />CITY and H&A <br />prepare minutes, revise <br />Team <br />plans <br />Develop 100% design plans <br />H&A Team <br />Civil Engineering <br />16-29 <br />5/1 S/2021 <br />nUNNAM R h h1NO( W I N MVIN E. 1 NC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.