My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-06-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/15/2021 Regular
>
FULL AGENDA PACKET 2021-06-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:12:11 AM
Creation date
7/12/2021 8:43:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/15/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Open ARs unit~ and storrtrdrain manhole covers to facilitate faster drainage of flooded <br />aieati. <br />d. Remove all trash/debris, sediment, and vegetation from ARS units and stornulrain <br />riciIiIies to laciIitaIe taoIer drainage of Hooded areas. <br />c. Provide asset TD number and photos of tooded stormdrain facilities that were <br />responded to within 7-days of the City's request. <br />f Any other wori< required to safely, effectively, and lawfully perform flood control <br />assistance Sel-Ylceti. <br />B. OTHER REQUIREMENTS <br />Contractors must download and use the City's new asset mananCment program (Citvvvorks) <br />to CcnnplCte work orders and service requests pertaining to this Scope of Work. City staff will <br />provide basic Cit-yworks training to contractors and contractors shall have tablets and/or mobile <br />phones to use Cityworks in the field when completing all service requests and work orders, <br />unless otherwise stated by the City. <br />Contractors shall adhere to all requirements of the City's MS4 NPDLS Permit "hilt, <br />performing services undo' this contract. Contractors shallv innedintely notify the City should <br />they become aware of any activities or events that may be deemed non -compliant. <br />C. CITY RESPONSIBILITIES <br />The City will provide information in its possession relevant to the completion of the tasks <br />outlined in this kFP. Iu general, this includes, but is not limited to: <br />• Furnish scope of work and provide general direction as -needed to complete tasks <br />• Furnish documents, data, maps, or other information rcicvant to the Scope of <br />Services <br />• Provide access to stormdrain facilities <br />• Facilitate meeting space and coordination at City facilities <br />D. PREVAILING WAGES <br />These Agreements are subject to compliance, monitoring and enforcement by the State of <br />California Department of hrdustrial Relations. Contractors are required to inform themselves <br />lolly ofIll e conditions relating to I abor under which the wori< will bepetibrnrecl. In accordance <br />with the Calilbmia State Labor Codc, prevailing wage rates apply per the following link: <br />littn://www.dir.c,i.gov/public-works/publicworks.litiiil <br />Coniractors shall provide certified payroll to flit, 01.1, upon invoicing. The 01, ntay not <br />City Council <br />26 — 70 6/15/2021 <br />City of Santa Ana RF1' 21-004 Pagc Al-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.