My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ submit a final report to the City within live working days upon completion of each project. <br />S. SPECIAL REQUIREMENTS <br />Since some of the city projects will be funded by Rxleral or Sour Fnants, the sc tcctul consulting thin nntst <br />comply with requirements of Caltram' ahnsu•uction manual and the lollowing_ <br />Certilicale of Personnel <br />♦ The personnel who will conduct the sampling and testing must be certified. They can be <br />certified by Callran ' District Materials Fngineer, by the National histAttle C'ertilicalion of <br />Engineering Technologies, or by other authority acceptable by the C.olhstrttCUn❑ Engineer <br />of the City to be proficient in accepting sampling and testing. <br />♦ A copy of each person's certificate nntst be on file in the office of the Construction <br />Fngineer. The certificate shall list the type of work which the individurd is authorized to <br />perform. <br />♦ The testing laboratory must be under the supervision of a registered engineer with <br />experience in inspection aard testing of construction materials. This engineer shall ccrtity <br />the results ofall tests performed bythe lab personnel under his/her supervision. <br />♦ The selecled fine nutst maintain the laboratory testing equipnherht in accordance with <br />recognized national <br />standards - <br />The selected firm must have an independent assurance testing and sampling program. This <br />program can be perforated either by their own personnel not involved in the acceptance <br />testing and sampling, or by another quality assurance organizatinn- <br />♦ Con-clation Testing Program- The Materials Laboratory shall be a participant in one or <br />morn of the following testing programs: <br />♦ AASI I FO Materials Reference I.aboratory(ARMI.) <br />♦ Cement and Concrete Reference Laboratory (CC.'Rl.) <br />♦ Caltrans' Reference Samples Program (RSP) <br />Acceptance FesthW and SiunplinL, <br />♦ The selected testing laboratory shall conduct acceptance testing of materials on the first day <br />when work is performed, and continues daily until the work is completed. <br />City Council City of Santa Ana RgR 20-M 1 71612021 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.