My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rcportin2 Test Results <br />♦ When aggregate sample is taken in the material source, the testing turn shall submit to the <br />Resident Iinginecr results of sand equivalent, cleanness value and sieve analysis within 24 <br />hours. When soils and aggn-egate sannples are taken ai the job site, results of these test. should <br />be submitted within 72 hours. <br />♦ Results of compaction and density tests taken at the joh site should be submitted within 24 <br />houn-s. <br />♦ Whcn samples of soils and asphalt concrete are taken at the Job site, R-value and result of <br />asphalt extraction test should be submitted within 96 hours. <br />Independent Assurance Ramplim, and Testing <br />The selected firm shall establish and maintain an Independent Sampling and Testing ([SAT) program_ <br />♦ To verify that the project sampling and testing are performed correctly by the testers ;nod <br />satnplers- <br />♦ To cnsurcc the equipment is properly calibrated. <br />♦ To provide the City with a copy of the program to ensure that the program is carried out. <br />♦ To provide the iesident Engineer with a report indicating actions to he taken by the <br />selected testing tine when discrepancies are found between ISAT and acceptance teas <br />(AT)- <br />C. CITY RESPONSIBILITIES <br />♦ Furnish construction plans and specifications to the consultant. <br />♦ Coordinate with the contractor regarding work schedule and noti Iy the consultant 24 hours <br />in advance for the required inspections and tests- <br />D. SPECIAL REQUIREMENTS (ATTACHMENT 4) <br />♦ This prujcct may utilizc Cal iforniaDcpartmcnt of Transportation (Caltrans) funds and shall <br />therefore <br />comply with all state and federal requirements. The below referenced ti» ins <br />included in Attachment 4 (Additional Provisions) of the Appendix must be completed in <br />their entirety and submitted with your proposal: <br />LAPM Exhibit I O-H: Sample Cost Proposal <br />City Council City of Santa Ana RgR 201151 7/6/2021 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.