Laserfiche WebLink
6. Terminal Strip Detail <br /> 7. Control Panel Labels <br /> 8. AC Power Distribution <br /> 9. DC Power Supply <br /> 10.Time Relays <br /> 11.Panel Temperature Monitor <br /> 12.Switch Details <br /> 13.AC Discrete Output Relays <br /> 14. Discrete Input Module <br /> 15.Analog Input Module <br /> 16.Analog Output Module <br /> 17.Network Components <br /> 18.Interior Panel Dimensions <br /> 19.Exterior Panel Dimensions <br /> The Contractor shall also provide calculations regarding the temperature, load power, and <br /> uninterruptable power source (UPS) runtime when applicable as described below: <br /> 1. Enclosure temperature calculations shall be based on operating duty cycle for <br /> equipment in the enclosure. Size enclosures to use passive or active cooling <br /> techniques as required to maintain the recommended operating temperature for any <br /> component inside the enclosure given project environmental conditions as specified <br /> by the City. <br /> 2. Full load power calculations for all sources of power shall be provided. <br /> 3. UPS runtime calculations for the calculated full load supplied by the UPS and the <br /> selected batteries shall be provided to the City. <br /> All panel designs and calculations shall be completed in compliance with all functional <br /> specifications and applicable standards, codes and regulations. <br /> 5. ADDITIONAL PANEL EQUIPMENT <br /> The Contractor shall procure and provide miscellaneous equipment required to complete <br /> tasks related to industrial control panels for water pump stations, pressure control stations, <br /> sewer lift stations, water well sites, and any additional sites upon request by the City. <br /> Miscellaneous equipment may include but is not limited to replacement parts, retrofits, <br /> upgrades, any additional supplementary parts required for repair, etc. <br /> 6. TRAINING SERVICES <br /> Upon request by the City, the Contractor shall provide in-person training services in <br /> accordance with National Electrical Code (NEC) and Underwriters Laboratories Inc (UL) <br /> regulations. The Contractor shall provide customizable training classes regarding specific- <br /> use industrial control panels, panel components, wiring, switching devices, etc. The <br /> Contractor shall also review the operation and maintenance for each component of the <br /> control panels. All manufacturer's manuals for equipment shall be included as well as <br /> r J c <br /> City of Santa Ana - RFP 21-100 <br /> Water Resources Panel Building Services <br /> Page 20 of 39 <br />