Laserfiche WebLink
EDUCATION <br />Bachelor of Science, Civil Engineering, <br />San Diego State University, San Diego, <br />CA, 2018 <br />PROFESSIONAL AFFILIATIONS <br />Engineer - In -Training (IET) No. 165274, <br />California Board of Professional <br />Engineers and Land Surveyors <br />Women's Transportation Seminar - San <br />Diego 2018-Present <br />Brianne Poole <br />EIT <br />Traffic Engineering <br />Engineering Support IBI Group <br />Ms. Poole is a Transportation Engineer at IBI Group and has <br />experience in a range of transportation engineering projects <br />including permanent and temporary traffic signal design, bikeway <br />design, light rail transit, design and implementation of bus rapid <br />transit and transit signal priority. She has drafted AutoCAD and <br />MicroStation plans for numerous projects, used Vissim to model <br />alignments and analyze operations, and has created and optimized <br />timing plans using Transync and Synchro. <br />Relevant Experience <br />American Association of Civil Engineers - Transit Signal Priority (TSP) Monitoring, San Diego, CA <br />San Diego 2018-Present <br />IBI Group is providing traffic signal operations and transit priority expertise as well <br />as management of the San Diego regional Transit Signal Priority (TSP) Monitoring <br />project for the San Diego Association of Governments (SANDAG). The project <br />provides route monitoring of the operation of TSP systems throughout San Diego <br />County, as well as troubleshooting and resolution of issues found during monitoring, <br />reported by the transit agencies, or cities involved. The monitored TSP systems use <br />a variety of systems to detect and provide priority to the transit vehicles including <br />both passive (signal coordination) and active (detection of the transit vehicle) <br />priority. Some of the systems use advanced traffic control technology, and IBI has <br />participated with the traffic control software vendors to implement and test proposed <br />TSP system improvements for the control software. Ms. Poole coordinates with the <br />City agencies, SANDAG and MTS for the TSP Monitoring work and participates in <br />field data collection and analysis. Ms. Poole has provided support and analysis for <br />the eight Bus Rapid routes including more than 130 TSP-equipped intersections and <br />90 TSP-equipped buses. Ms. Poole coordinates and takes part in the collection and <br />analysis of corridor data to examine the effectiveness of TSP on individual routes, <br />and adjustment of intersection configurations and IR thresholds to increase TSP <br />effectiveness. Ms. Poole has tested and programmed timing with multiple vendors' <br />controllers and firmware, including McCain and Q-Free Intelight. <br />South Bay Rapid TSP & One-way Transitway (OWT) System Design, <br />Chula Vista, CA <br />SANDAG has implemented a Bus Rapid Transit route along East Palomar St that <br />connects downtown San Diego and the Otay Mesa Border Crossing. Ms. Poole <br />contributed to the design of the transitway traffic signal system including test plans, <br />traffic controller and software bench testing, and implementation support. Ms. Poole <br />also developed, tested, and implemented traffic controller peer -to -peer logic and <br />signal timing for the twenty-seven intersections along the bus -only guideway on East <br />Palomar St and the one -lane bidirectional transit bridge, as well as provided onsite <br />traffic signal turn on support. Ms. Poole contributed to the extensive test plan of the <br />OWT and co -lead numerous days of field testing. <br />City Council <br />17-242 <br />2/15/2022 <br />IBI GROUP ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 <br />