ANISSAVOYIATZES I ARDURRA I Page2 <br />constructing and operating a 48-foot-diameter waterwheel, modeled <br />after the historic wheel that existed near the site. The purpose of the <br />project is to divert water from the LA Riverand create an aesthetic/ <br />educational statement, showing that the LA River can be used as a <br />source of water, enhancing the connections with the community, and <br />provide a viable long-term water source for neighboring parks. <br />1-210 Soundwalls, Supplemental Environmental Report <br />(NBSSR) and Plans, Specifications and Estimates Phase III, City <br />of La Canada Flintridge, CA. Engineering Services Group Leader for <br />the design of three separate soundwalls along the 1-210 freeway. The <br />project has included soundwall design along a hillside slope, several <br />edge of travel ways, and over bridges. As part of this design, the <br />project has involved significant coordination with the City of La Cafiada <br />Flintridge, Caltrans, and the design team. <br />ADA Ramp Program, City of Long Beach, CA. Senior Program <br />Manager for the overall management and design of the curb ramps for <br />the City's ramp program. To date, her team has designed approximately <br />185 ramps throughout the city of Long Beach. <br />Pacific Coast Highway Traffic Congestion Relief Project, Dana <br />Point, CA.* Senior Project Managerforthe pedestrian bridge and <br />widening of Pacific Coast Highway from the San Juan Creek Bridge to <br />Crystal Lantern. This multi -award -winning project for the widening <br />that turned a 4-lane facility into a 6-lane facility. The project consists of <br />preparing environmental documentation; widening the roadway to six <br />lanes; coordinating with (altrans and obtaining an encroachment permit; <br />designing offsite improvements, including a pedestrian bridge over PCH, <br />bus stop relocations, and new bus stop turnouts, and improvements to <br />the maintenance yard for Doheny Park State Beach; designing drainage <br />structures; and preparing a Storm Water Management Plan. <br />Staff Augmentation, City of Long Beach, CA. Provided plan <br />check services as needed for a variety of projects ranging from <br />roadway rehabilitation, parking lot replacement, site demolition, alley <br />improvements, and beach stairway replacement projects. <br />Staff Augmentation for Design Support and Construction <br />Engineering Services (TOS No 111), City of Los Angeles, <br />CA.* Senior Project Manager and Program Managerfor the overall <br />management of the TOS 111 Staff Augmentation Program. Anissa <br />provided design support in the form of both onsite and offsite design <br />staff for approximately 10 ATP grant -funded projects. <br />Rosecrans Avenue Arterial Improvement Project, City of <br />Gardena, CA.* Project Manager for this $4-million, Measure R funded <br />project. The project consisted of work across the entire width of the <br />right-of-way along the 2-mile length of this major arterial crossing the <br />city of Gardena. Project work included removal of the center turn lane <br />pavement, installation of raised medians, stamped colored concrete, <br />landscaping, irrigation, driveways, sidewalks, curb ramps, traffic <br />signal improvements, mill and overlay asphalt concrete pavement, <br />and signage and striping. The work required close coordination <br />with the owners of multiple fuel pipelines and other underground <br />facilities within the project boundaries and with adjacent business and <br />residential property owners and tenants. <br />North Gaffey Beautification Project, Phase II, The Port of Los <br />Angeles, CA.* Senior Project Manager for the multidiscipline team for <br />planning, outreach, and PS&E services for the multi -modal pathway <br />linking North Gaffey Street to the Port of Los Angeles Waterfront <br />path. The project included the design of a 1,500-LF pathway along <br />the existing railway corridor and under the 1-110 overpass and <br />included landscaping, lighting, security cameras, and water quality <br />improvements. <br />Complete Streets Program, (TOS 38), City of Los Angeles, CA.* <br />Senior Project Manager in support for PS&E of the City's Complete Street <br />Program that intended to implement Vision Zero, green infrastructure <br />elements, and the rehabilitation of 22 miles of roadway. This is the first <br />phase of a multi -phase program to be designed and constructed within <br />the next two years. Meticulous planning and coordination were needed <br />to manage the multiple design teams, disciplines, and City departments <br />to achieve the City's goals, objectives and aggressive schedule. <br />Glendale -Hyperion Complex of Bridges Improvement Project, <br />City of Los Angeles, CA.* Program and Senior Project Manager for <br />the PR and PS&E of this challenging multi -million dollar project for <br />the rehabilitation and widening of the complex of seven bridges by <br />improving the existing local roadways and freeway ramp alignment, <br />increasing the seismic strength, addressing water quality and <br />incorporating elements for all modes of travel including a new <br />pedestrian bridge crossing the Los Angeles River. Improvements <br />include widening the Glendale Boulevard bridges, realigning the 1-5 <br />northbound off -and on -ramp, adding a pedestrian bridge over the <br />Los Angeles River, retaining walls, traffic signals, drainage system <br />improvements, infiltration basins and improving pedestrian facilities. <br />Design: $4.1 million <br />*Work performed prior to joining Amurra <br />ARDURRA B-28 City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />