Laserfiche WebLink
OMARALAMEDDINE I ARDURRA I Paget <br />Underground District No.65 Reliability Improvement, <br />Phase 1— Royal Oak; Crescent and Cerro Vista <br />Reliability Improvement; and Direct Buried Cable <br />Replacement. Over approximately 11 months, project <br />activities included undergrounding 12kV distribution systems, <br />streetlight installation, service conversions, and removal of <br />overhead facilities. <br />Underground District No.65 Reliability Improvement, <br />Phase 2 — Santa Ana Canyon Road — Lakeview to <br />Imperial. Over approximately 11 months, project activities <br />included undergrounding 12kV distribution systems, <br />streetlight installation, service conversions, and removal of <br />overhead facilities. <br />Underground District No. 68 Reliability Improvement — <br />Eucalyptus Drive from Santa Ana Canyon Road to <br />2,000' South Project. Over approximately eight months, <br />project activities included undergrounding of 12kV and <br />6.9kV distribution systems, direct buried cable replacement, <br />streetlight installation, service conversions, and removal of <br />overhead facilities. <br />Olive Street 16-inch Water Main Replacement and Roadway <br />Restoration Project. Contract administrator/construction <br />manager forthe improvement of water system reliability by <br />replacing old 10- and 6-inch cast iron pipe with new 16-inch <br />ductile iron pipe. The project also included the replacement of fire <br />hydrants, valves, water services, and appurtenant structures. <br />Rehabilitation of Pressure Regulating Stations (PRS) 30 <br />and 31 and Relocation of PRS-32 and -43 and Construction <br />of New PRS-73. Contract administrator/construction managerfor <br />contract administration and construction management services <br />for completion of various on -call water utilities projects for the <br />Water Utilities Engineering group. The work consists of contract <br />administration and construction management services for the <br />Pressure Regulating Stations 30, 31, 32, 43, and 73 project, and <br />construction management services overseeing the closeout of the <br />PR-58, M-2 and M-8 projects. <br />Atlantic Avenue Water Main Replacement Project (Liberty <br />Court Phase 2), Long Beach Water, Long Beach, CA. Assistant <br />construction manager and documents control specialist for a $1-million <br />project to install a 1,200-foot long water main under a busy arterial, <br />Atlantic Avenue, and connect it to private service lines and other <br />water mains. Duties included monitoring work progress, updating the <br />schedule, filing daily reports and ensuring compliance with plans and <br />specifications. The project was in the Liberty Court area of Long Beach. <br />13th Street Sewer Rehabilitation, City of Manhattan Beach, <br />CA. Inspectorfora $250,000 project initiated as a follow-up to a major <br />sewer rehabilitation. Inspections addressed installation of a sewer <br />main, house laterals and manholes. Inspected concrete work, including <br />construction of two ADA-compliant ramps. <br />Rainbow Harbor Commercial Sewage EVAC System <br />Replacement, City of Long Beach, CA. Construction manager for <br />this $700,000 project to replace a 20-year-old sewage EVAC pump -out <br />used by Rainbow Harbor boat operators. Oversaw work to abandon the <br />old pumping system, valve installation and hose replacement. <br />Beach Maintenance Clarifier Project, City of Long Beach, <br />CA. Project manager/construction manager for the installation of <br />$250,000 clarifier system in the City's beach maintenance yard. The <br />system will treat wastewaterfor reuse in cleaning beach maintenance <br />equipment. Responsibilities included assisting with design <br />coordination, Coastal Development Permit processing, bidding, public <br />relations, inter -departmental coordination, and onsite fast track design. <br />APWA Awarding Winning - Firestone Boulevard Regional <br />Corridor Capacity Enhancements, Project No.476-TRF, City of <br />South Gate, CA. Assistant construction manager/lead inspector for a <br />$20-million project to improve three segments of Firestone Boulevard. <br />The improvements will both increase traffic capacity and improve the <br />road's appearance. Construction also included the installation of an <br />8-inch DIP, Class 52 water main along with hot taps for service laterals, <br />including but not limited to excavation, fittings, restraints, backfill, <br />compaction testing, pipe identification, caps, and other appurtenances <br />to complete works. Ensures project compliance with plans and specs. <br />Provides fast track design efforts for newly proposed bus pullouts, <br />median construction, and drainage facilities. Observes utility potholing, <br />traffic control and stormwater practices. Maintains personnel and <br />equipment logs. Negotiated and reviewed potential change orders, <br />orchestrated utility coordination and collaborated with City staff. <br />Provided public relations and progress reports. Participated and led <br />progress meetings. Preconstruction duties included documenting <br />existing conditions, such as tree wells to be removed. <br />Termino Avenue Drain Project, LACDPW, Long Beach, CA.* <br />Inspector for the federally funded $22-million construction of storm <br />drain system and water main to improve drainage in several Long <br />Beach neighborhoods. Inspected excavation, shoring and trenching, <br />installation of reinforced -concrete drainage pipes and boxes, utility <br />relocations, backfilling, compacting and asphalt -concrete paving. <br />*Work performed prior tojoiningArdurra <br />City ofSanta Ana -Division <br />A/ARDURRA B-40 ] RFP22-0021May24222 <br />