<br />replacement. The project required a Caltrans encroachment permit for
<br />traffic control and paving within the state right-of-way at PCH.
<br />Commercial Sewage System Replacement, Rainbow Harbor,
<br />City of Long Beach, CA. Project Manager developing an engineer's
<br />opinion of probable construction time (critical path method schedule)
<br />to be listed in bid documents. The $690,000 project is replacing a
<br />20-year-old sewage pump -out system serving vessel operators at
<br />Rainbow Harbor in downtown Long Beach. Plans call for replacing a
<br />centralized underground twin -tank sewage pump -out system with
<br />seven smaller dockside peristaltic pumps. These improvements would
<br />convert the system to a pressurized sewage disposal system. The project
<br />will also replace the hoses under gangways, install new stainless -steel
<br />valves and repair compromised PVC piping.
<br />Los Amigos Park Storm Water Harvesting and Direct Use
<br />Demonstration Project, City of Santa Monica, CA. Principal -
<br />in -Charge for Ardurra's construction management services for this
<br />$2-million project that could serve as model for municipal water
<br />conservation programs throughout the region. The system intercepts
<br />an existing Los Angeles. County storm drain line and diverts the flow
<br />of urban runoff to a treatment unit and storage tank for use in park
<br />irrigation and restroom sanitation, conserving potable water. Los
<br />Amigos was named 2017 Outstanding Small Project of the Year by
<br />the Metropolitan Los Angeles Branch of the American Society of Civil
<br />Engineers.
<br />Greenbelt Low -Flow Infiltration Project, City of Manhattan
<br />Beach, CA. Construction Manager for this $550,000 project to install
<br />a low -flow infiltration system in a municipal greenbelt to comply
<br />with increasingly stringent state water quality standards. The project
<br />accomplished this goal by intercepting the City's existing stormwater
<br />system at nearby catch basin and diverting the flow into the new
<br />infiltration system. Current surface drainage now infiltrates into the
<br />system instead of carrying pollutants to downstream storm drains.
<br />Roundhouse Marine Studies Lab and Aquarium, City of
<br />Manhattan Beach, CA. Principal -in -Charge and Project Manager
<br />for the $4.1M expansion and renewal of the City's registered historic
<br />landmark, the Roundhouse Aquarium on the Manhattan Beach Pier.
<br />Directed all aspects of the work, including relocating the aquarium's
<br />ocean creatures to temporary shelter during construction, then back
<br />to the completed facility. Guided a PM team made up of marine
<br />biologist, an environmental services specialist, an architectural
<br />historian and support staff. Served as a liaison to the project's
<br />primary stakeholders. Managed the project throughout bidding
<br />and award, construction and commissioning phases. Procured the
<br />design, environmental, CM and QA consulting team. Facilitated a
<br />consensus -driven design process. Administered professional services
<br />agreements. Coordinated and expedited the process of obtaining
<br />entitlements and permits. Assisted the City in coordinating the
<br />concurrent $3M replacement of all major utilities along both sides of
<br />the pier as well as under the structure. The project also renovated the
<br />Roundhouse building's exterior shell. The project received a 2019 Merit
<br />Award from the California Chapter of the ACEC.
<br />Underground Utility Assessment District 09-1(Coast Royal), City
<br />of Laguna Beach, CA. Principal -in -Charge overseeing construction
<br />management and inspection services for this $240,000 project to move
<br />overhead utilities underground in several upscale residential locations.
<br />Belmont Plaza Pool Rebuild/Revitalization Project, City of
<br />Long Beach, CA. Project Managerfor the $103.1M aquatics center
<br />replacing the now -demolished Belmont Olympic Pool. The new facility
<br />will host swimming, water polo, and platform diving events at the local,
<br />regional, and national levels. Represents the City and its interests in all
<br />negotiations, meetings, community outreach, entitlements, permitting,
<br />design management, and related activities. The project required
<br />extensive public outreach and implementation of stakeholder advisory
<br />committee during the programmatic and conceptual design phases.
<br />Conducted bidability and constructability reviews assessing temporary
<br />facilities, demolition and the new facilities' project documents.
<br />Implemented the demolition of the prior, condemned facility and
<br />construction of necessary temporary facilities to continue operation of
<br />the aquatics department and required restroom and shower facilities
<br />while the permanent facility was planned, designed, and entitled.
<br />Equipping of Well 12 in Mile Square Park, City of Fountain
<br />Valley, CA.* Project controls manager implementing contract
<br />administration system, construction management procedures manual
<br />and documents control system. The project involved a new pump
<br />station building and supporting pump and control systems equipment.
<br />Consulted on change order negotiations, claims avoidance and
<br />resolution.
<br />Hollywood Reservoir Complex, Water Quality Improvements,
<br />Los Angeles Department of Water and Power (LADWP), Los
<br />Angeles, CA �* Assistant Project Managerfor improvements involving
<br />preliminary engineering and alternative studies for a potable water
<br />filtration plant and 60-MGD covered finished water storage. Services
<br />included facility and site selection, facility and site layout, hydraulic
<br />studies, analysis of system improvements, cost estimates and
<br />coordinating presentations for community meetings. Served on total
<br />quality management committee to improve the project scoping process
<br />for the division.