Laserfiche WebLink
Staff Title <br />President <br />Years with Firm <br />22 <br />Registrations <br />• Structural Engineer, CA #54233, <br />Exp.6/30/2023 <br />• Civil Engineer, CA #C53540, <br />Exp.6/30/2023 <br />Education <br />• MS, Structural Engineering, <br />University of California, Berkeley <br />• BE, Civil Engineering, <br />University of Baroda, India <br />Affiliations <br />• Structural Engineers <br />Association <br />• American Society of <br />BEYAZ & PATEL <br />Celebrating 40 Years of Structural Engineering Excellence <br />Subhash Patel, PE, SE <br />Principal Structural Engineer <br />Introduction <br />Beyaz & Patel's principal engineer, Subhash Patel, PE, SE, brings subject matter exper- <br />tise in structural engineering, coupled by 38 years of water facility and building expe- <br />rience. Subhash works seamlessly with clients, subconsultants, and stakeholders while <br />managing small and large water supply projects for stormwater, groundwater, and <br />recycled, and advanced water systems. He is counted on by engineering firms to lead <br />structural services for complex contracts with the San Francisco Public Utility Commis- <br />sion, Metropolitan Water District of Southern California, County of Los Angeles, and <br />City of Los Angeles, because of his excellent structural engineering capabilities. Subhash <br />is lauded for his ability to evaluate discreet alternatives, innovative design recommen- <br />dations, and knowledge of local, state, and federal code requirements and regulations. <br />Experience <br />Groundwater Replenishment System (GWRS), Orange County Sanitation and <br />Water Districts, Fountain Valley, CA. Principal structural engineer for design and <br />construction of the microfiltration process facility and control room, microfiltration <br />break tank/reverse osmosis transfer pump station, microfiltration backwash waste <br />equalization tank, and generator building. GWRS provides purified recycled water <br />for aquifer recharge to replenish supplies and to prevent seawater intrusion. <br />Civil Engineers Anaheim Lake Valve Vault, Orange County Water District, Anaheim, CA. Principal <br />structural engineer providing design services for a valve vault that will enable Dis- <br />trict staff to gain access to several pipeline connections should emergency repairs <br />be necessary. The project replaced two valves and included the construction of <br />a vault that will house a total of five valves. The five valves include two 48-inch <br />butterfly valves requiring replacement from the Warner Pipeline to the Anaheim <br />Pipeline, two additional existing 48-inch valves that connect Warner Pipeline to the <br />Atwood Channel, and one 72-inch valve that allows the District to distribute water <br />received from Metropolitan Water District deliveries via OC-28 to the Anaheim <br />Pipeline. <br />East Portal Force Main Isolation Structure, City of San Diego, CA. Principal struc- <br />tural engineer for modifying two corroded below -grade sewer force main struc- <br />tures. The project involved the construction of a new 46-foot-long by 24-foot-wide <br />by 45-foot-deep below -grade concrete structure adjacent to the existing east portal <br />structure to isolate the two existing force mains. The new structure included two <br />slide gates, an intermediate floor level, and a roof slab cover. The roof slabs are <br />precast concrete planks, giving access to the structure's interior. <br />City <br />22-0021May24,2 Ana Resources Division 1 B-43 ] / � ARDURRA <br />RFP 22-002 May 24, 2022 <br />