My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shelley Sivak, RA, LEED AP, Lead Architect <br />Shelley Sivak is a forward -thinking architect who brings form to buildings and interior <br />spaces and new life to both urban and suburban settings, to create a strong sense of <br />place. She takes a holistic approach and considers key capacity to recognize the specific <br />demands of a particular location and tailors the design process to be efficient and <br />productive. <br />Years with IDS Group, Inc. <br />• 3 <br />Education <br />• Master of Architecture, California Polytechnic University, Pomona <br />• Bachelor of Science, Design, Arizona State University <br />Professional Credential <br />• Professional Architect: CA (#C-33767) <br />• LEED Accredited Professional <br />Project Experience with the City of Anaheim: <br />• Melrose Space Planning <br />Relevant Project Experience: <br />City of Anaheim Melrose Space Planning: Project Architect providing office space planning and architectural <br />services to the city's Facilities Services Division. Scope of work includes documenting field condition, preparing <br />two (2) space planning options, client meetings to discuss preferred design option, and providing a final space <br />plan. <br />Los Angeles County Metropolitan Transportation Authority (Metro), Los Angeles, CA: Metro requires a Tier 1, <br />Tier 2 and Conditions Assessment at nine (9) Metro parking garages to be completed within a 10-week time <br />frame. As Project Manager, Shelly worked with the Agency and in-house IDS team to ensure project objectives <br />and goals were met. Scope included site visits, pre -assessment, data collection, review of as-builts, identification <br />of short- and long-term needs, cost analysis, and facility evaluation reports. <br />Los Angeles World Airports (LAWA), Recycling -Repair Yard Relocation, Los Angeles, CA: To make way for the <br />Taxiway D Extension project at LAX, an existing Airport Maintenance Yard required relocation from the north <br />side of World Way West to the south side. This yard included an existing but un-permitted steel roof canopy <br />structure to be relocated. IDS developed a material testing program (based on ASCE 41 procedures) necessary <br />to obtain a building permit for the relocated canopy structure for the recycling sorting area. Expedited project <br />design and construction was required. Shelley worked with the in-house structural, electrical, and civil <br />engineering teams to redesign the masonry wall/bunkers for storage of sand and gravel, canopy, storage racks <br />and container. <br />Municipal Water District of Orange County Facility Upgrade, Fountain Valley, CA: Shelley was the Project <br />Manager and Interior Designer. Project scope -of -work included space planning, structural upgrades, interior <br />fixtures, and finishes. She was responsiblefor coordinating with stakeholders to ensure the goals and objectives <br />of the project were achieved. <br />AA IDS GROUP Page <br />City of-0021May24,2022 Ana Water Resources Division f B-53 1 / � ARDURRA <br />RFP22-002 May24,2022 L J <br />
The URL can be used to link to this page
Your browser does not support the video tag.