My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARDURRA GROUP, INC.
Clerk
>
Contracts / Agreements
>
A
>
ARDURRA GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:02 AM
Creation date
9/27/2022 4:34:45 PM
Metadata
Fields
Template:
Contracts
Company Name
ARDURRA GROUP, INC.
Contract #
A-2022-158-02
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
1/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />County of Orange, Human Resources Consolidation, Orange, CA: As Project Manager, Shelley worked with the <br />Agency to consolidate various divisions from separate buildings onto two floors of a single building. Scope of <br />work consists of space planning, interior design, FF&E with cost estimates, design of custom built-in work areas, <br />and construction administration. <br />County of Orange, New Healthcare Agency Facility, 1711 Street, Santa Ana, CA: Project Architect. IDS Group <br />developed an overall master plan, which included the new Clinic building, the existing Bio Safety, Lab, the <br />Peripheral buildings, and surface parking areas. IDS developed block diagrams of the new buildings to reflect <br />the programming needs and efficient site utilization, and construction requirements. One of the most critical <br />requirements for this project was to maintain operation of both the Clinic building and the Bio Lab during new <br />construction. <br />County of Orange Yale Navigation Center, Santa Ana, CA: As Project Architect, Shelley is leading IDS' team <br />providing architectural and interior design and coordination with furniture vendors for the Furniture, Fixtures <br />and Equipment package. Part of the deliverables for this job includes the writing of a Basis of Design document <br />for FF&E as well as a cost estimate. <br />County of Orange Capital Improvement Division, El Toro Library Modernization, El Toro, CA: As Project <br />Manager/Architect, Shelley directed the IDS team through the architectural and planning and interiors of the <br />renovations and upgrades for the project. The scope -of -work included addressing age related building and site <br />repair and aesthetic issues, interior design, and coordination with team of designers and engineers to create a <br />full set of comprehensive construction documents. <br />AA IDS GROUP <br />Page 4 <br />/\/ A R D UR R A f City of Santa Ana water Resources Division <br />B-54 � RFP 22-002 1 May 24, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.