Laserfiche WebLink
Education <br />BS/1992/Civil Engineering/Virginia <br />Polytechnic Institute and State Univ. <br />Registrations <br />1999/PE/CA # C59082 <br />20210 (MCI Certified Construction <br />Manager (Al 762) <br />Certifications <br />California Stormwater Quality <br />Association(CASQA) Qualified SWPPP <br />Developer (QSD) & Qualified SWPPP <br />Practitioner (QSP) Certification <br />#24758 (recertification pending) <br />Legally Responsible Party (LRP) - <br />City of Oceanside <br />Software <br />Primavera P6, Project Management <br />Presentations <br />Instructor CCM Course — Contract <br />Administration, CMAA, 2016 <br />Professional Affiliations <br />Construction Management <br />Association of America <br />American Water Works Association <br />San Diego County Water Works Group <br />American Council of Engineering <br />Companies of California <br />American Society of Civil Engineers, <br />Pipeline and Environmental Group, <br />President, 2002-2003 <br />Years of Experience:29 <br />Av <br />Amy Czajkowski, PE, CCM, QSD/P <br />QA/QC &Technical Review, Condition Assessment <br />In her 29 years of serving water districts, municipalities, and purveyors, Amy Czajkowski, PE, CCM, QSD/P, <br />has gained recognition for system planning, design engineering, and construction management of public <br />water and wastewater infrastructure projects. She is recognized for her project management, thorough <br />design review and plan checking, and ability to work with a variety of contractors and permit applicants. <br />An additional specialty of hers is stormwater management, which includes design services, assisting with <br />permitting compliance, and performing inspection for effectiveness of BMP systems during construction. <br />She has conducted master plans forwater and sewer services, assessed impact fees, and developed capital <br />improvement programs to ensure adequate service. She has managed onsite capital improvement projects <br />and served as extension of staff acting on behalf of the client. <br />Amy's engineering design experience includes pump and lift stations, conveyance systems, reservoir <br />storage, and treatment facilities. Her onsite construction experience, combined with her extensive <br />research of material and equipment performance allows her to avoid constructability problems and reduce <br />costs. In addition to being a Certified Construction Manager, Amy is both a certified QSD and QSP giving <br />her the experience and flexibility to make changes in the field and ensure the project -specific or overall <br />plans, such as SUSUMPs, HMPs, etc., are effectively implemented. Regardless of the size or complexity <br />of the project, she focuses on complete and accurate engineering, as well as understanding her clients' <br />needs. <br />RELEVANT EXPERIENCE <br />Near -Term Water Supply and CIP, Elsinore Valley Municipal Water District, Lake Elsinore, <br />CA. Program Manager for more than 40 CIP construction management and design projects ranging in <br />construction value from $300,000 to $10 million. The CIP execution rate was over 90%and all projects <br />were completed on time and with an overall 2%change order rate. Responsibilities included project <br />budgeting; preparation of requests for proposals; preparation of reports for internal District committees, <br />and the District council; oral presentations at committee, commission, and Council meetings; and <br />management of emergency situations. <br />Flagler Wells Pipeline Conversion, Elsinore Valley Municipal Water District, Lake Elsinore, CA. <br />Rehabilitation of 2 groundwater wells (combined yield 1,200 gpm), construction of new pump station, <br />20-inch steel pipeline, and connection into a 42-inch CMLC. <br />Engineering Services for the Program/Project Management of Capital Improvement Plan, <br />Long Beach Water Department (LBWD), Long Beach, CA. Program Manager responsible for <br />delivering engineering services for the program and project management of the CIP for LEWD. LEWD is <br />undertaking an aggressive CIP program that ranges from new well water supply projects to sewer pipeline <br />and lateral replacements. LEWD anticipates a CIP budget for Fiscal Year2022 of $40 million. This is a large <br />influx of projects over short period of time. Ardurra will execute the individual CIP projects and assist in <br />the overall CIP Program goals. <br />CIP Management (Construction Management and Design), City of Oceanside, CA. CIP Manager <br />responsible for the preparation of 15+ in-house designs, RFP preparation, managing consultant contracts, <br />preparation of Staff Reports and other Council documents, and other functions to complete projects lists <br />on the FY 1SA 6 CIP. <br />City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 [ B-3 ] /�j ARDURRA <br />