Laserfiche WebLink
Education <br />MS/2003/Civil Engineering —Water <br />Resources/San Jose State University <br />BS/1998/Environmental Engineering/ <br />Michigan Technological University <br />Registrations <br />2008/PE/Civil/CA #72074 <br />Certifications <br />AWWA Utility Risk and Resilience <br />Certification Program <br />Professional Affiliations <br />American Water Works Association <br />—Water Resources Sustainability- <br />Division Committee (2013 — present), <br />and Innovations Committee <br />WateReuse Association <br />Presentations <br />"Data Governance & Quality <br />Management: a Hydraulic Modelers <br />Perspective"AWWA (Utility Mgmt <br />Conference), Nashville, TN, March 2019 <br />"Fast & Furious Hydraulic Modeling <br />with SCADA" ACE Workshop & <br />Presentation, Chicago, IL, June 2016 <br />"It's Not Just Pressure, It's a Vital <br />Sign"AWWA (Water Infrastructure <br />Conference) Poster, Bethesda, MD, <br />October2015 <br />"Engineers Without Borders Honduras <br />Site Investigation Trip"ASCE Chapter, <br />San Jose, CA, March 2009 <br />Years of Experience:20 <br />AV <br />ARDURRA <br />Shyamala Raveendran, PE <br />Planning & Feasibility Studies/Hydraulic Modeling <br />Shyamala Raveendran, PE, has 20 years of experience with hydraulic modeling, water and wastewater <br />master planning related projects in roles as technical reviewer, senior engineer, or project manager. <br />RELEVANT EXPERIENCE <br />Water Master Plan, Phelan Pinon Hills Community Service District, CA. Project Manager and <br />Technical Reviewer responsible for delivery of the District's Water Distribution Master Plan to help the City <br />develop its capital improvement budget. Tasks included data collection, data analysis, update of water <br />distribution system design criteria, update and calibration of water hydraulic model with the most recent <br />operational control information, demand information, and field tests, evaluation of the system under <br />Average Day Demand (ADD), Maximum Day Demand (MDD), Peak Hour Demand (PHD), and MDD plus Fire <br />Flow (FF) conditions, identification of system deficiencies based on model results, and recommendation of <br />Capital Improvement Projects. An additional task included a study to help the District identify operational <br />solutions to optimize the use of Reservoir 6A. <br />Water System Operations Analysis & Master Plan, City of Vernon, CA. Project Manager and <br />Technical Reviewer responsible for delivery of the City's Water Master Plan to help the City with aspects of <br />demand management goals, hydraulic model update, asset management goals, developing scenarios to <br />help optimize current operational methods, and helping the City develop its near -and long-term capital <br />improvement budget. Coordinated remotely with four subconsultants ranging from rate fee experts, <br />hydrogeologists, and water industry specialists to help the City navigate project challenges amidst <br />COVID-19 restrictions in order to help the City meet its capital improvement planning goals. <br />Recycled Water Storage & Conveyance System Evaluation, San Elijo Joint Powers Authority, <br />CA. Senior Engineer in charge of building and calibrating the District's recycled water transmission system, <br />which includes a reclamation facility, three pumping stations, and three main storage facilities. Used the <br />updated hydraulic model to evaluate feasibility of converting a potable tank to recycled water storage <br />to meet current and future needs of SEJPA's northern distribution system for service to its retail agency <br />customers, evaluated whether an existing tank would need to increase wall height, determine and rank <br />storage and operational benefits of two main tanks to the SEJPA recycled water system. <br />2020 Water Master Plan & Water Capacity Fee Study, San Dieguito Water District, CA. Managed <br />a team of consultants to complete the following tasks for the District's Master Plan update: hydraulic <br />model update and validation, demand forecasting, asset valuation and condition assessment, water <br />capacity fee study, fire hazard analysis, and capital improvement project development and prioritization. <br />Coordinated all meetings, technical memoranda reviews, and maintained communications with the <br />District and subconsultants in order to maintain scope, schedule, and budget expectations of the project. <br />Urban Water Management Plan, Phelan Pifion Hills Community Service District, CA. Project <br />Manager and Technical Reviewer responsible for delivery of the District's 2020 UWMP to meet state <br />regulatory requirements. Significant updates to the 2015 plan were made including an update to the <br />existing water shortage contingency plan. <br />Water Distribution Model Update and Calibration, Fallbrook Public Utility District, CA. Project <br />Manager and Technical Reviewer responsible for model update and calibration activities for the District's <br />water distribution system model consisting of 9,215 services, 9 pressure zones, 8 storage tanks, about 30 <br />pressure reducing valves, and several booster stations. Two separate models were merged in InfoWater <br />to produce one model of the system. The merged model was calibrated in steady-state with latest <br />City of Santa Ana Water Resources Division <br />RFP 22-0021 May 24, 2022 <br />[ Ba ] /�/ ARDURRA <br />