Laserfiche WebLink
Anders Egense, PE <br />Design Services, Pipeline Design <br />Anders Egense, PE, is experienced in water resources planning and engineering. Specialized experience <br />includes the planning and design of potable water and recycled water supply and distribution systems. <br />RELEVANT EXPERIENCE <br />Orange Tank Siting Study, Eastern Municipal Water District, CA. Project Manager for siting study <br />for a 1 MG steel reservoir and 1,800 feet of 12" PVC pipeline to connect the new tank to the distribution <br />system. <br />Education <br />Water Master Plan, Olivenhain Municipal Water District, CA. Project Manager for comprehensive <br />M.Eng./1983/Civil Engineering/ <br />master plan encompassing District's50-square-mile service area. Study involved the development of a <br />University of California, Berkeley <br />new GIS-based hydraulic model (using H20NETI), planning of future potable water and recycled water <br />BS/1981/Civil Engineering/University <br />capital facilities, and the development of operational guidelinesfor District's potablewater storage in <br />of California, Irvine <br />concert with the newtreatment plant and waterstorage project. <br />Registrations <br />Harris Reservoir and Pump Station Replacement, Cal Water Service Company, CA. Developed <br />1986/PE/Civil/CA#C40654 <br />alternatives and performed hydraulic analyses to evaluate replacement of a buried 4-MG concrete tank <br />Professional Affiliations <br />that had experienced severe structural distress due to landslide -induced settlement, along with the <br />American Societyof Civil Engineers <br />reconstruction of an onsite pump station and major upgrades to two other pump stations. <br />American PublicYlorks Association <br />Engineering Consulting Services, Olivenhain Municipal Water District, CA. Principal -in -Charge <br />WateReuse Association <br />providing oversight and quality control for ongoing support services tasks. Tasks include hydraulic <br />Awards <br />analyses and plan checking of potable water and recycled water facilities for land development projects, <br />Mountain Top Reservoir Retrofit <br />maintaining and updating water system network models, and engineering support for operations <br />Padre Dam Municipal Water <br />department, right-of-way engineering, and engineering support during construction projects. <br />2010 APWA Project of the Year 2010 <br />ASCE Award of Merit <br />Engineering Consulting Services, City of Escondido, CA. Project Manager responsible for ongoing <br />Infrastructure Project <br />tasks including maintaining and updating water system network models, assisting the City with <br />Palomar College <br />implementation of its capital water projects, and development and evaluation of planning criteria for <br />2000 ASCE Honor Award <br />future water system improvements. <br />Years of Experience: 39 <br />Eastlake Greens and Rancho Del Rey Groundwater Well Feasibility Study, Otay Water District, <br />CA. Project Manager for study of wellhead treatment alternatives and discharge options for two small <br />groundwater wells. <br />Lester J. Berglund Water Treatment Plant Clearwell Upgrades, City of Poway, CA. Project <br />Manager for multifaceted project involving existing 10 MG Clearwell: <br />• Condition Assessmentof (learwell— Material testing of Hypalon floating cover and liner, evaluation of <br />replacement installation options, coordination with CA Department of Drinking Water, and preliminary <br />design for replacement cover and liner. <br />• Evaluation ofC/earwellReplacementAlternatives— Reviewed future water system demands, clearwell <br />volume requirements, and compared rehabilitating the existing clearwell floating coverwith alternative <br />structures: circular steel and circular prestressed concrete tanks. <br />• Preliminary Design for Clearwell Bypass Pipeline— Hydraulic analysis of system operations to determine <br />minimum storage requirements for bypass system (2.0 MG); evaluation of options for configuring and <br />�� locating bypass storage; and preliminary alignment analysis for bypass pipeline. <br />• Bypass Tank Configuration Evaluation — Concept -level evaluation of three concrete tank shapes: <br />ARDURRA circular and two rectangular footprints with comparison of general life cycle costs and advantages/ <br />disadvantages. <br />City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 [ B-15 ] /\/ARDURRA <br />