E <br />ANDERS EGENSE I ARDURRA I Page 2 <br />Preliminary Design for Bypass Tank —Preliminary design for 2.5 MG <br />prestressed concrete tank and 1,000 feet of 36" bypass line with <br />valve vaults, site improvements, drainage facilities. <br />Final Design for Temporary Bypass System —Technical memorandum <br />to develop temporary bypass system comprised of permanent bypass <br />pipeline (1,140 feet of 36"), temporary bypass pump station (3,900 <br />gpm) and temporary storage tanks (2.2 MG in twin bolted steel tanks <br />with 1,100 feet of24"HDPE pipe). Prepared PS&E for system and <br />assisted with support services during bidding and construction phases. <br />Design for Clearwell Replacement — Provided technical support for <br />design of twin 4-MG prestressed concrete tanks to replace existing <br />floating cover Clearwell. <br />As -Needed Civil Engineering Services, City of San Diego, CA. Program <br />Managerfor5-year, $5M as -needed contract. Work tasks have encompassed: <br />• Group Job 1020Pressure Reducing Station —PS&Efor buried PRSand <br />radio link SCADA. <br />• Nimitz8ridgePedestrian Improvements —ADAramps, lighting, <br />structural modifications on existing concrete bridge. <br />• Golf Course Dr. Bike Lane— Feasibility study of addition of bike and <br />pedestrian lanes along constrained roadway through golf course and <br />sensitive habitat area. <br />• Group lob 8355ewerManhole Design —Structural design for 25 feet <br />deep manhole. <br />• San Carlos Storm Drain Project— 6,500feet ofl8"-54"storm drains <br />to replace deteriorated facilities. Includes hydrology and hydraulic <br />analysis, design of30feet deep manhole, and extensive private <br />property owner coordination for restoration of landscape/hardscape <br />along easements. <br />• Rolling Hills Park Improvements—Sitegradinganddrainage <br />improvements; hardscaping for new playground facilities with close <br />community interaction. <br />Village Park Recycled Water Facilities, Olivenhain Municipal <br />Water District, CA. Project Manager for alternatives evaluation, <br />PDR, and PS&E for design of 35,500 feet of 4"-12" PVC and fusible PVC <br />pipe, an 1,200-gpm pump station (using prefabricated station), flow <br />metering facilities, and modifications for conversion of existing 1.0-MG <br />water tank to recycled water operation including addition of potable <br />makeup water system with flow control and air -gap. The pipelines are <br />located in busy thoroughfares, residential streets, and fronting schools <br />and businesses. Services included extensive utility agency and City of <br />Encinitas coordination and hydraulic analysis of operational interface <br />between Olivenhain Municipal Water District and San Elijo Joint Powers <br />Authority recycled water systems, support for Coastal Development <br />Permit from City of Encinitas, and bid and construction phase support. <br />Miramar Water Treatment Plant 58 MG Clearwell, City of San <br />Diego, CA. Task Manager for civil design of water storage facility <br />comprised of two 29-MG partially buried basins to replace existing <br />outdated structures. The project includes 2,200 feet of 54"- 84"welded <br />steel inlet and outlet pipes, inlet and outlet structures, flow meters in <br />buried vaults, 200feet of42"RCP overflow piping, basin drain system <br />with 16"piping, underdrain piping, and a barrier drain system to <br />address local groundwater. Also providing bid and construction phase <br />support services. <br />La Jolla View Reservoir and Pipeline, City of San Diego, CA. <br />Project Manager responsible for PDR and PS&E for 3.1-MG reservoir, <br />3,000 feet of 30"welded steel pipe, and demolition of two outdated <br />reservoirs. Reservoir is comprised of prestressed concrete tank that is <br />fully buried with limited surface features. Project includes extensive <br />habitat restoration and public outreach support due to the tank location <br />in a scenic, hilltop park in the coastal La Jolla area. <br />Rock Springs Sewer, Vallecitos Water District, CA. Project Manager <br />for the design of 2,700 feet of 12"-15"gravity sewer (with trenchless <br />construction section) through environmentally sensitive corridor. <br />Project included slip -lining to rehabilitate one segment of 8" pipe, <br />environmental compliance (IS/MND preparation), and coordination with <br />homeowners to select alignment that minimized impacts to HOA park. <br />Flagler Wells, Elsinore Valley Municipal Water District, CA. <br />Project Manager for design of pumps and associated appurtenances <br />to equip two groundwater wells for delivery of raw water to Ag Line <br />system. Project includes 800-gpm vertical turbine pumps, motor control <br />centers, discharge pipelines to connect wells to distribution system, and <br />pump -to -waste pipelines that outlet to the adjacent Temescal Canyon <br />Wash. Services include engineering support during construction. <br />Miramar Pump Station Rehabilitation/Replacement Study, <br />San Diego County Water Authority, CA. Project Manager for an <br />evaluation of various alternatives to either rehabilitate, upgrade, or <br />replace the aging 100-cfs pump station that delivers treated water from <br />the City of San Diego Miramar WTP into the SDCWA Aqueduct system. <br />Project includes hydraulic analyses, selection of new pumps, and <br />detailed project description of the preferred project alternative. <br />& 1 Mitigation Project —Value Engineering, City of La Mesa, CA. <br />Project Manager for the performance of a VE study of the construction <br />documents for 14.8 miles of 6- and 8-inch concrete lined sewer mains <br />and manholes that needed to be replaced. The pipelines are being <br />replaced using both conventional in -place trench replacement and <br />alternative methods such as microtunneling, directional drilling or pipe <br />bursting. The final report made several recommendations on options for <br />reducing costs and minimizing impacts to residents and private property. <br />ARDURRA [ B_16 ] City of Santa Ana Water Resources Division <br />RFP 22-002 1 May 24, 2022 <br />