My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC. (4)
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:53:51 AM
Creation date
5/3/2023 3:20:57 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC.
Contract #
A-2023-053-02
Agency
Public Works
Council Approval Date
4/4/2023
Expiration Date
4/3/2026
Insurance Exp Date
10/1/2024
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Phase <br />Engineering services during construction (ESDC) for this project will <br />serve a multi -purposed role including verification of conformance to <br />the design intent, facilitation of discussion and conflict resolution, <br />protection of the City's interests, and record keeping. Construction <br />activities can move very quickly, complicating these roles. To avoid this <br />and meet the requirements of the above -mentioned role, we will take <br />the following steps: <br />+ Organization: With a flurry of communications occurring during the <br />construction process, it is easy to lose track of outstanding or <br />pending items. A highly organized system of documenting and <br />tracking construction submittals, requests for information (RFI), <br />change orders, transmittals, and the like is one of the most important <br />ways of ensuring a that "everything stays within our radar." We <br />propose using construction management software, such as Procore, <br />to provide all parties access to real time information in one <br />convenient location. This would provide ease of mind and <br />transparency for the City as well as help keep the project on <br />schedule. <br />+ Proactive Communication: Frequent communication among all <br />parties helps builds the trust and confidence to keep a project on <br />schedule. As we have demonstrated during the construction of Well <br />40, Stantec will engage the City, contractor, and any construction <br />management personnel via emails, phone calls, and/or conference <br />calls as necessary to verify all parties are on the same page to lead <br />the project toward successful completion. For example, during Well <br />40 construction, Stantec submittal and RFI response time was <br />usually significantly less than allowed by the specifications. <br />+ Prioritization: Construction projects move quickly. We respond <br />thoroughly to communications, submittals, RFI, and change orders, <br />as we understand these have the potential to cost the contractor <br />and/or the City either time, money, or both. For Well 40 construction <br />and all of our projects under construction, our team prioritizes <br />construction related work. Furthermore, we will communicate with <br />the contractor to prioritize select equipment submittals, RFI, and <br />change orders over other items for this project to facilitate time - <br />sensitive items. <br />After the contractor has determined they have substantially <br />completed project construction, we will inspect the work to confirm its <br />conformance to the design intent. We will use our experience from the <br />ongoing OCWD on -call contract to guide the successful commissioning <br />of the facility. <br />Fast -track PFAS <br />Project Success.. <br />Our team has experience with <br />activated carbon and ion exchange <br />PFAS removal, as well as <br />accelerated project schedules for <br />these processes. <br />Eielson Air Force Base <br />PFAS Treatment <br />Alaska <br />• PFOS and PFOA Treatment <br />• GAC Treatment <br />• Uninterrupted Service to the Base <br />• Fast -tracked design -build contract <br />• Capable of treating 1,500 GPM of <br />water and reducing PFAS to below <br />detection levels <br />PFAS in Groundwater <br />Cottage Grove, Minnesota <br />• Analyzed PFAS contamination <br />trends <br />• Expedited design and installation <br />of a granular activated carbon <br />groundwater treatment system for <br />the potable water system <br />City of Santa Ana On -Call Engineering Design Services for HAS Treatment Systems RFP NO. 22-133 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.