My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STUDIO ONE ELEVEN
Clerk
>
Contracts / Agreements
>
S
>
STUDIO ONE ELEVEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:27:12 PM
Creation date
6/13/2023 8:31:54 AM
Metadata
Fields
Template:
Contracts
Company Name
STUDIO ONE ELEVEN
Contract #
A-2023-089-09
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/18/2025
Destruction Year
2031
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
leadership of licensed landscape architects, our team <br />brings considerable experience in the execution of a <br />variety of public projects and proven ability to prepare <br />complete plans and specifications for project bid <br />advertisement. Design of project improvements will <br />be prepared in accordance with established design <br />criteria and conform to requirements of the City of <br />Santa Ana (CSA) and other governmental agencies <br />including, but not limited to the California Building <br />Code, ADA, CSA Standard Plans, and State Water <br />Ordinance Requirements in order to achieve project <br />objectives. The PS&E will be submitted to the City <br />at established contract documents milestones with <br />accompanying cost estimate and specifications. <br />Documents will include bid items and definitions, any <br />modifications to General and Special Provisions, and <br />incorporate technical architectural specifications. All <br />plans, the title sheet of the specifications, calculations <br />and reports will be signed and stamped by the <br />licensed professional landscape architect, architect or <br />engineer. <br />Task VIII - Sample Deliverables <br />• Project delivery schedule <br />• CAD drawings — demolition, hardscape, irrigation, <br />planting, site furnishings, sections/elevations, details, <br />material schedules. <br />• Supporting calculations and reports <br />-Sub-consultant drawings (e.g. civil, structural) <br />• Bi-Weekly project coordination meetings with City <br />during plan preparation phases per Task IV <br />• Provide milestone submittals for City review and <br />consultant coordination (i.e. 50%, 90%, 100%) <br />• ROM (Rough Order of Magnitude) Costs per Task IX <br />• Project manual/specifications book and bid schedule <br />Task IX - Cost Estimating <br />S111 can provide opinion of probable costs and <br />ROM pricing for design studies and conceptual <br />development phases, based on our experience <br />of costs with similar and recent projects. This is <br />necessary to establish a design that meets both <br />the anticipated budget and project criteria. For <br />projects of certain scale or complexity, and during <br />documentation we recommend a cost estimating <br />sub -consultant to provide detailed cost estimates <br />that associate with milestone submittals prior to <br />bidding. If Value Engineering of design is required to <br />reduce anticipated construction costs it is expected <br />to occur via 'redlines' to the concept package and <br />Cost Estimator will revise the ROM accordingly. <br />City is to provide written approval of project budget, <br />project scope, and design elements to be included in <br />Documentation. <br />The establishment of budget and design alignment <br />is expected to occur prior to development of contract <br />documents to establish if 'value engineering' of design <br />and revisions of documents to reduce construction <br />costs or if additional budget is required to meet <br />established project criteria. Value Engineering <br />of design and revisions to documents to reduce <br />construction costs after completion of Schematic <br />Design would be an additional service. City is <br />expected to provide soft and hard cost budget at the <br />onset of a project to assist in designing to budget. <br />Task IX - Sample Deliverables <br />• Attend meeting via teleconference with City to review <br />ROM costs and determine if project budget aligns with <br />proposed design. <br />• Opinion of ROM costs and analysis (e.g. cost of <br />tactical improvements vs. complete transformation) <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.