My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING COMPANY
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:04:38 PM
Creation date
6/26/2023 3:52:19 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING COMPANY
Contract #
A-2023-088-04
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our team has designed extensive Capital Improvement Projects for public agencies as both <br />stand-alone projects and as components of on-calflas-needed contracts. The best way to show <br />our relevant experience is to profile projects sharing similarities with the types of projects we <br />anticipate with this on -call contract. We have selected projects that demonstrate the ability to <br />provide the technical expertise the City seeks. <br />Street and Traffic Design Services for the 2021 - 2023 CIP <br />LAKE FOREST, CA <br />fCK is currently providing preliminary studies <br />for three intersection improvement projects. <br />Improvements include the addition of a defacto <br />right turn at Jeronimo/Lake Forest Drive, roadway <br />widening to accommodate dual left turn lanes <br />at eastbound Bake Parkway to northbound <br />Toledo, dual left turn lanes at northbound Toledo <br />to westbound Bake Parkway, and roadway <br />widening to accommodate a right turn only <br />lane on westbound Los Alisos to northbound Rockfield. Currently, utility <br />correspondence and traffic counts are complete, and analysis to verify <br />traffic volumes and ultimate improvement needs is underway. Preliminary <br />intersection geometric alternative studies will soon be underway for the <br />three intersections. <br />Key Components: Preliminary Engineering Alternative Analysis, Field <br />Topographic & R/W Surveys, ROW Mapping, Landscape/Irrigation, <br />WQMP, and Temporary Construction Estimate Mapping. <br />El Toro Road at Portola/Santa Margarita Parkway <br />COMPLETION DATE <br />December 2021 - Present <br />CLIENT I CONTACT <br />City of Lake Forest <br />Doug Erdman, PE <br />Assistant City Engineer <br />(949)282-5233 <br />derdman@lakeforestca.gov <br />LAKE FOREST, CA COMPLETION DATE <br />Through our current Street and Traffic On -Call contract with the City of Lake On -Going (95% complete) <br />Forest, RICK provided preliminary engineering services for the preparation CLIENT / CONTACT <br />and approval of an alternative study for the improvements required to provide City of Lake Forest <br />an additional El Toro Road eastbound left turn lane to northbound Portola, Doug Erdman, PE <br />which requires right-of-way from the County of Orange. Assistant City Engineer <br />(949)282-5233 <br />For westbound El Toro, the project provides another designated right turn derdman@lakeforestca.gov <br />only lane to northbound Portola. An additional project component includes <br />a connection to the westbound El Toro sidewalk to the existing Class 1 <br />Los Alisos Creek Bikeway. <br />City of • -16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.