My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING COMPANY
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:04:38 PM
Creation date
6/26/2023 3:52:19 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING COMPANY
Contract #
A-2023-088-04
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
1/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Example Scope of Work <br />Traffic Control Plans will be designed in accordance with California MUTCD and the City's guidelines. <br />Prior to beginning work on these plans, Rick Engineering will meet with the City to discuss and determine <br />construction staging, minimum lane requirements, and driveway access, and plan notes and legends. <br />Deliverables: <br />Project plans in Microstation V8 format and .pdf format (60% and 100%) <br />7. Specifications and Cost Estimates <br />As with the project plans, RICK will prepare project specifications and cost estimate at the 65%, 95%, <br />and 100% completion level. Upon receiving plan check comments from the City, we will review the <br />comments and make necessary revisions to the PS&E package and submit a final set of construction <br />documents to the City for bidding. <br />The project specification will be prepared using the City's standard "boiler plate" specifications and we <br />will prepare the Special Provisions portion of the Construction Specifications and Contract Documents <br />suitable for bidding and awarding of the Contract. These special provisions will be incorporated into the <br />City's standard construction document package. This work includes the preparation of the Bid schedule. <br />RICK will perform comprehensive quantity take -offs for construction items. We maintain a <br />comprehensive list of construction unit prices from a wide array of past projects. The unit prices used <br />for this estimate of probable cost will be derived from recent projects of similar scope and/or provided <br />information from the City. <br />Deliverables: <br />• Specifications in Word format w/ edits shown (60% and 100%) <br />• Construction Cost Estimate in excel format (60% and 100%) <br />8. Water Quality Compliance <br />Along with the project's PS&E package, RICK will prepare a Water WQMP to a 100% completion <br />level prior to the 60% submittal. Upon receiving plan check comments from the City, we will review the <br />comments and make necessary revisions to the WQMP and submit a final copy with the rest of the <br />construction documents to the City for bidding. <br />RICK is at the forefront when it comes to matters related to storm water. Our water resources staff <br />includes many registered QSD/QSP's and, in fact, provide the industry with training on a regular basis <br />through our in-house registered Trainers -of -Record. We will provide calculations and take -offs as well <br />as prepare a Risk Assessment prior to bidding. It is assumed that the City will provide Rick Engineering <br />with the desired construction start date and anticipated duration at the time the Risk Assessment is <br />needed. If it is later determined that the City requires a review of the contractor's SWPPP, RICK has the <br />experience and ability to perform the task. <br />Deliverable: <br />• WQMP (.pdf and hardcopy) <br />9. Right -of -Way Legal Description and Plat <br />We will prepare right-of-way legal description and plat for the single property right of take required for <br />the addition of the designated right -turn lane. <br />Deliverables: <br />• Plat and Legal Description (.pdf format) 60% and 100% <br />• Back up calculations (traverses) 60% and 100% <br />RICK City of SantaAna On -Call Engineering Services, RFP No.: 23-030 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.