My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN TA AN A <br />RFP NO,; 22-133 <br />ON -CALL ENO I N E E RING DE S I ON S RV ICES FOR PFAS TREATM E NT S ` STEMS <br />b. Final amhiteclure] details— coordinated with structural system details <br />c. Special construction details cormpleted <br />d_ CompMe ceiling plan <br />e. Interior equipment <br />f. Room finished schedule including <br />L Color selection <br />ji. Fimr Seleclao n <br />lii. WalI finish <br />iv. Coiling finish <br />g. Dbor schedu]e— including hardware; Master key plan working w4h Ilse Crty's <br />access control specialist <br />h. Window schedule including hardware <br />i. Archittufal accessories schedule <br />j. Extenor finish and color schedule <br />ill_ Svucturai Systern <br />a- Complete set of structura I drawing s. <br />h_ Finat strumrad details coo rdrnated wrth architoctu ral system details (if <br />applica ble ) <br />c. Permit set of stamped structural calculations <br />d. Final foundateon and Bating details <br />e. Final �tructura I details including co nsi ructio n dotail s. <br />f. Final structural ca Iculatons <br />g. Performance requirement for shoring system identified <br />IV. Civil 5i[a Plan System <br />a. Final estimate of fill and excavation quantities <br />b, Location of new utilities finalized <br />C. U61ity connections finalized <br />d. Find] derign of water treatment faoililies <br />e. Final channellization plans <br />f. Final sagning plans <br />g. Final landscaping plans (if applicable i nctud i ng plant sch-adu le) <br />h. Final irrigation system plans, <br />i. Final erosion and sediment ccnlrol plans <br />j. Final design of traffic rtiftigation <br />k. Permit set of stamped storm water ma nagemeni tcu lations <br />I. Surface W2ter Pollution Prevention Plans (S PPS) when ioppl ica ble <br />V_ Mechanical System <br />@. CQrnplete Nuipment schedule <br />h. Final piping plans <br />c. Final heating, aenlilafion and air canditioninq (HVAO) plans <br />d. Final plumbing plans <br />e. Final fire protection plans and performance specifications <br />CO Of Santa Ana RFP 22-133 <br />On C@11 Erigirbiering design SanAce5 for PFAS Treatment Syrst-ems <br />page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.