My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO-: 22-135 <br />ON-CAI-L ENGINEERING UES16N 3 ERVIOES FOR PFA:S TRrEATMENT YSTEAAS <br />f. Final section vie vs <br />0. Final plans of mechanical moms <br />h. Final conl rol diagrams Including control point list and final sequence of <br />operation <br />L Final building Components -U" as lue caicc lations <br />j- Fins i I rnechan ice I deta ils <br />k. Finailenergywde calculations <br />V1. Eiectrical System <br />im. Iwightiirg and receptacles circuited <br />b. Special electrical equipmeail Circuited <br />C. Final panel sched-ules — showing MIanced loads <br />d. Final arc flash analysis <br />e. Finial elecUical fixlure sched-,la <br />f. Oomplele one -line diagrams which are directly appliicablE! to the panel <br />schedule <br />g. Rnal electrical details <br />h. Final eilectdcal load calculations imluding ernergeney generator syslem <br />Vill. Ire-stfurnenta#ion and Conftel Systern <br />a. Finoi corxtrcJ schematics <br />b. Final security and acoe:ss control plans <br />c. Final location of alarm devices determir.d <br />d. Final PLCfDCS wiring diagram <br />.e. AUDO pow�if distribution wiring diagrarns <br />1 BD PHASE <br />Urn Cornprelion and awroval of the 100% design phase, the City shal l requo:st lhe Gonsuftant <br />to -assist with the bidding phase_ <br />A. PROJECT MANAGEMENT <br />The Consultant shall ccordinale aM expecrit,e the p4-eparation, assembly and deliuery of bid <br />docurne nt3 for the City to administer via PlanetBid s Portal- The Consultant "l l take the <br />necessary proms lures to administer any prequatlifica.tion of potential Consilruction <br />Cantmctors as directed by the City to ensure that all Go ntracts are compelitively bid- <br />B. TECHNICAL SUPPORT <br />The Consultant shall provide technical support to the City on questions reganding thf3 <br />meaning and Intent of the d ravutngs and specifications- and shall atssiist in achieving the <br />resolution i n cla riFying any comments potential Consinxbon Qonlra c ors may have during <br />the biddmg phase. <br />--City df Santa Aria RFP 22-13a <br />On -Call Engineering Design Seryii:es for PFAS Treatment Syri ems <br />Page 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.