Laserfiche WebLink
VTTM No. 2022-03 and DBA No. 2022-03 — Warmington Residential <br />September 26, 2022 <br />Page 7 <br />includes two covered parking spaces for each townhouse unit and three open/guest parking <br />stalls. <br />To proactively address any neighborhood parking impacts that could result from the project, <br />the conditions of approval for the VTTM and terms of the DBA include provisions requiring <br />the following parking management practices, to be incorporated into the final, recorded <br />CC&Rs, and applicable throughout the life of the project: <br />• Requiring onsite parking permits (such as stickers or hang -tags) for any parking in <br />the surface guest parking spaces; <br />• Policies for maximum time vehicles may be parked in the surface guest spaces; <br />• Policies for towing unauthorized vehicles; vehicles parked in unauthorized locations, <br />such as fire lanes; vehicles parking in surface guest parking without a sticker, hang - <br />tag, or other identifiers; and vehicles parked longer than any maximum guest parking <br />timeframes allowed; and <br />• Routine garage inspections to ensure garages are available for vehicle parking. <br />Analysis of the Issues <br />Pursuant to Section 41-1607 of the SAMC, an application for a density bonus agreement is <br />required to be approved by the Planning Commission for any project containing "deviations" <br />(incentives/concessions and/or waivers). The Planning Commission's review of the density <br />bonus agreement is based on the following findings: <br />The proposed development will materially assist in accomplishing the goal of <br />providing affordable housing opportunities in economically balanced communities <br />throughout the city. <br />2. The development will not be inconsistent with the purpose of the underlying zone <br />or applicable designation in the general plan land use element. <br />3. The deviation is necessary to make it economically feasible for the applicant to <br />utilize a density bonus authorized for the development pursuant to section 41- <br />1603. <br />The project does not require a Site Plan Review Application pursuant to Table 3-2 (Permitted <br />Uses) as part of the Harbor Mixed Use Transit Corridor Plan (SP-2). Accordingly, the <br />Planning Commission's review and determination for this request are limited to the <br />provisions of the Density Bonus Agreement application only. <br />