Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verfication <br />Initial <br />Date <br />Comments <br />Mitigation Measure <br />Action Required <br />Monilodng Phase <br />Agency/Party <br />MM4.2-9 Project applicants shall require by contract specifications that <br />In Include in project -specific <br />In Prior to issuance of <br />In Project <br />alternative fuel construction equipment (i.e., compressed natural gas, liquid <br />contractspecifications <br />gradingPermits <br />Applicant <br />petroleum gas, and unleaded gasoline) be utilized to the extent that the <br />In Review project -specific <br />In During project <br />In City of Santa <br />equipment is readily available and cost effective in the South Coast Air Basin. <br />construction documents <br />construction <br />Ana Planning <br />Contract specifications shall be included in project construction documents, <br />■ Monitor construction <br />and Building <br />which shall be reviewed by the City of Santa Ana prior to issuance of a grading <br />activities <br />Agency <br />permit. <br />MM4.2-10 Project applicants shall require by contract specifications that <br />In Include in project -specific <br />In Prior to issuance of <br />In Project <br />construction equipment engines be maintained in good condition and in proper <br />contract specifications <br />grading permits <br />Applicant <br />tune per manufacturer's specification for the duration of construction. Contract <br />In Review project -specific <br />In During project <br />In City of Santa <br />specifications shall be included in project construction documents, which shall <br />construction documents <br />construction <br />Ana Planning <br />be reviewed by the City of Santa Ana prior to issuance of a grading permit. <br />In Monitor construction <br />and Building <br />activities <br />Agency <br />MM4.2-11 Project applicants shall require by contract specifications that <br />In Include in project -specific <br />In Prior to issuance of <br />In Project <br />construction operations rely on the electricity infrastructure surrounding the <br />contract specifications <br />grading permits <br />Applicant <br />construction site rather than electrical generators powered by internal <br />In Review project -specific <br />In Construction <br />combustion engines to the extent feasible. Contract specifications shall be <br />construction documents <br />Contractor <br />included in project construction documents, which shall be reviewed by the <br />In Monitor construction <br />InCity of Santa <br />City of Santa Ana prior to issuance of a grading permit. <br />activities <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-12 As required by South Coast Air Quality Management District Rule <br />In Incorporate dust control <br />In Prior to issuance of <br />In Project <br />403—Fugitive Dust, all construction activities that are capable of generating <br />measures into project- <br />grading permits <br />Applicant <br />fugitive dust are required to implement dust control measures during each <br />specific contract <br />In During project <br />In Construction <br />phase of project development to reduce the amount of particulate matter <br />specifications <br />construction <br />Contractor <br />entrained in the ambient air. These measures include the following: <br />■ Review construction <br />In City of Santa <br />In Application of soil stabilizers to inactive construction areas <br />documents <br />Ana Planning <br />In Quick replacement of ground cover in disturbed areas <br />In Monitor construction <br />and Building <br />In Watering of exposed surfaces three times daily <br />activities <br />Agency <br />In Watering of all unpaved haul roads three times daily <br />■ Covering all stock piles with tarp <br />■ Reduction of vehicle speed on unpaved roads <br />■ Post signs on -site limiting traffic to 15 miles per hour or less <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-5 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />In Sweep streets adjacent to the project site at the end of the day if visible <br />soil material is carried over to adjacent roads <br />In Cover or have water applied to the exposed surface of all trucks hauling <br />dirt, sand, soil, or other loose materials prior to leaving the site to prevent <br />dust from impacting the surrounding areas <br />In Install wheel washers where vehicles enter and exit unpaved roads onto <br />paved roads to wash off trucks and any equipment leaving the site each <br />trip <br />MM4.2-13 The developer shall require by contract specifications that <br />In Include in project -specific <br />In Prior to issuance of <br />In Project <br />construction -related equipment, including heavy-duty equipment, motor <br />contract specifications <br />grading permits <br />Applicant <br />vehicles, and portable equipment, shall be turned off when not in use for more <br />In Review and approve <br />In During project <br />In Construction <br />than 30 minutes. Diesel -fueled commercial motor vehicles with gross vehicular <br />project -specific <br />construction <br />Contractor <br />weight ratings of greater than 10,000 pounds shall be turned off when not in <br />construction documents <br />In City of Santa <br />use for more than 5 minutes. Contract specifications shall be included in the <br />■ Monitor construction <br />Ana Planning <br />proposed project construction documents, which shall be approved by the City <br />activities <br />and Building <br />of Santa Ana. <br />Agency <br />MM4.2-14 The developer shall require by contract specifications that <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Project <br />construction parking be configured to minimize traffic interference during the <br />contract specifications <br />grading permits <br />Applicant <br />construction period and, therefore, reduce idling of traffic. Contract <br />In Review and approve <br />In Construction <br />specifications shall be included in the proposed project construction <br />project -specific <br />Contractor <br />documents, which shall be approved by the City of Santa Ana. <br />construction documents <br />In City of Santa <br />In Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.2-15 The developer shall require by contract specifications that <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Project <br />temporary traffic controls are provided, such as a flag person, during all <br />contract specifications <br />grading permits <br />Applicant <br />phases of construction to maintain smooth traffic flow. Contract specifications <br />In Review and approve of <br />In During project <br />In Construction <br />shall be included in the proposed project construction documents, which shall <br />project -specific <br />construction <br />Contractor <br />be approved by the City of Santa Ana. <br />construction documents <br />In City of Santa <br />In Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />11-6 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting Program <br />Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required Monitoring Phase <br />Agency/Party <br />MM4.2-16 The developer shall require by contract specifications that <br />In Include in project -specific <br />■ Prior to issuance of <br />In Project <br />construction activities that affect traffic flow on the arterial system by <br />contract specifications <br />grading permits <br />Applicant <br />scheduled to off-peak hours (9:00 A.M. to 3:00 P.M.). Contract specifications <br />In Review and approve of <br />In During project <br />In Construction <br />shall be included in the proposed project construction documents, which shall <br />project -specific <br />construction <br />Contractor <br />be approved by the City of Santa Ana. <br />construction documents <br />In City of Santa <br />In Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.2-17 Upon issuance of building or grading permits, whichever is issued <br />In Notify owners and <br />In Prior to issuance of <br />In Project <br />earliest, notification shall be mailed to owners and occupants of all developed <br />occupants of construction <br />grading permits <br />Applicant <br />land uses within % mile of any project within the Transit Zoning Code (SD 84A <br />activities occurring through <br />■ During project <br />■ City of Santa <br />and SD 84B) boundaries greater than four stories in height or 25,000 sf in area <br />the duration of the <br />construction <br />Ana Planning <br />providing a schedule for major construction activities that will occur through <br />construction period. <br />and Building <br />the duration of the construction period. In addition, the notification will include <br />In Assign a designated <br />Agency <br />the identification and contact number for a community liaison and designated <br />construction manager <br />construction manager that would be available on site to monitor construction <br />■ Identify designated <br />activities. The construction manager shall be responsible for complying with all <br />community liaison <br />project requirements related to PM,o generation. The construction manager <br />will be located at the on -site construction office during construction hours for <br />■ Monitor construction <br />the duration of all construction activities. Contact information for the <br />activities <br />community liaison and construction manager will be located at the construction <br />office, City Hall, the police department, and a sign on site. <br />MM4.2-18 The developer shall require by contract specifications that the <br />In Include in project -specific <br />contract specifications <br />■ Review and approve <br />project -specific <br />construction documents <br />■ Prior to issuance of <br />grading permits <br />■ During project <br />construction <br />In Project <br />Applicant <br />■ Construction <br />Contractor <br />In City of Santa <br />architectural' coating paint and primer products used would have a <br />ratings 12 grams per eat r of es�a cations s a eh II b —included <br />in the proposed project construction documents, which shall be reviewed and <br />approved by the City of Santa Ana. <br />■ Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-7 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Aesthetics <br />MM4.1-1 Proposed new structures shall be designed to maximize the use of <br />■ Review building materials <br />■ Prior to issuance of <br />■ City of Santa <br />textured or other non -reflective exterior surfaces and non -reflective glass. <br />and design plans <br />building permits for <br />Ana Planning <br />Building materials shall be reviewed by the City of Santa Ana prior to issuance <br />each project <br />and Building <br />of building permits for each project. <br />Agency <br />MM4.1-2 All exterior lighting and advertising (including signage) shall be <br />In Review project -specific <br />In Prior to issuance of <br />In City of Santa <br />directed onto the specific location intended for illumination (e.g., parking lots, <br />lighting plan <br />occupancy permits <br />Ana Planning <br />driveways, and walkways) and shielded away from adjacent properties and <br />for each project <br />and Building <br />public rights -of -way to minimize light spillover onto adjacent areas. <br />Agency <br />MM4.1-3 Prior to issuance of a building permit for a specific development <br />In Submit project -specific <br />In Prior to issuance of <br />In Project <br />project, the applicant shall submit a lighting plan to the City for review and <br />lighting plan for review and <br />building permits for <br />Applicant <br />approval. The plan shall specify the lighting type and placement to ensure that <br />approval by the City <br />each project <br />In City of Santa <br />the effects of security and other outdoor lighting are minimized on adjacent <br />Ana Planning <br />uses and do not create spillover effects. The plan shall specifically incorporate <br />and Building <br />the following design features: <br />Agency <br />■ All projects shall incorporate project design features to shield light and/or <br />glare from vehicles entering or exiting parking lots and structures that face <br />sensitive uses (e.g., schools, hospitals, senior housing, or other residential <br />properties) by providing barriers so that light from vehicle headlights would <br />not illuminate off -site sensitive uses. <br />In All projects shall incorporate project design features to provide <br />landscaping, physical barriers, screening, or other buffers to minimize <br />project -generated illumination from entering off -site areas and to prevent <br />glare or interference with vehicular traffic, in accordance with the City's <br />Municipal Code. <br />MM4.1-4 For any proposed structure that would exceed four stories in height, <br />In Submit project -specific <br />In Prior to issuance of <br />In Project <br />applicants shall submit a site -specific shade/shadow report with renderings <br />shade/shadow report for <br />building permits for <br />Applicant <br />representing the level of shade/shadows associated with the proposed <br />review and approval by the <br />each project <br />In City of Santa <br />development at the following times: 9:00 A.M., 12:00 P.M., 3:00 P.M. PST for the <br />City <br />Ana Planning <br />both the winter and summer solstices. An additional rendering for the 5:00 P.M. <br />and Building <br />PST time period shall be prepared for the summer solstice period. Typically, a <br />Agency <br />variety of criteria are used to determine the significance of a shadow impact, <br />including the following: <br />In Affected land use (criticality of direct sunlight for the use) <br />11-2 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible Compliance Verification <br />MfTigation Measure Action Required Monitoring Phase Agency/Party Initial Date Comments <br />In Duration (hours per day in shadow) <br />■ Time of day (critical time period for direct sunlight) <br />In Season (time of year use would be shadowed) <br />In Extent (percentage of use that would be shadowed) <br />In Preexisting condition (shadow condition due to existing buildings, <br />landscaping, or other features) <br />■ Type (solid or dappled shadow) <br />The report shall include any feasible design considerations that would reduce <br />the extent of shadows cast by a proposed structure. The analysis and the <br />project design plans shall be forwarded to the Planning and Building Agency <br />for review and approval. <br />Air Quality <br />MM4.2-1 Trash receptacles within the Transit Zoning Code (SD 84A and <br />SD 84B) will be required to have lids that enable convenient collection and <br />loading and will be emptied on a regular basis, in compliance with City of <br />Santa Ana regulations for the collection of solid waste. <br />In Verify site design to ensure <br />lids will be used and there <br />is proper access for waste <br />disposal <br />In During project <br />design review <br />In City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-2 The construction contractor shall ensure that no more than 5 acres <br />In Include in project -specific <br />In Prior to issuance of <br />In Construction <br />per day are actively graded or developed. <br />contract specifications <br />grading permits <br />Contractor <br />In Monitor construction <br />In City of Santa <br />activities <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-3 The construction contractor shall ensure that all active disturbed <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Construction <br />surfaces should be watered three times per day throughout the construction <br />contract specifications <br />grading permits <br />Contractor <br />period. <br />■ Monitor construction <br />■ City of Santa <br />activities <br />Ana Planning <br />and Building <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-3 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting Program <br />Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required Monitoring Phase <br />Agency/Party <br />MM4.2-4 The construction contractor shall ensure that the mass grading, fine <br />In Include in project -specific <br />In Prior to issuance of <br />In Construction <br />grading, and structure construction are conducted at separate time periods <br />contract specifications <br />grading permits <br />Contractor <br />and do not overlap with one another. <br />In Review of project -specific <br />In During site grading <br />In City of Santa <br />construction documents <br />and construction <br />Ana Planning <br />In Monitor construction <br />and Building <br />activities <br />Agency <br />MM4.2-5 The construction contractor shall ensure that all haul roads are <br />■ Inclusion in project -specific <br />■ Prior to issuance of <br />■ Construction <br />watered three (3) times per day. <br />contract specifications <br />grading permits <br />Contractor <br />In Review of project -specific <br />In During site grading <br />■ City of Santa <br />construction documents <br />Ana Planning <br />In Monitor construction <br />and Building <br />activities <br />Agency <br />MM4.2-6 The construction contractor shall ensure that all traffic on unpaved <br />In Inclusion in project -specific <br />In Prior to issuance of <br />In Construction <br />roads is reduced to 15 mph or less. <br />contract specifications <br />grading permits <br />Contractor <br />In Review of project -specific <br />In During site grading <br />In City of Santa <br />construction documents <br />Ana Planning <br />In Monitor construction <br />and Building <br />activities <br />Agency <br />MM4.2-7 Project applicants shall require by contract specifications that all <br />In Inclusion in project -specific <br />In Prior to issuance of <br />■ Project <br />diesel -powered equipment used will be retrofitted with after -treatment products <br />contract specifications <br />grading permits <br />Applicant <br />(e.g., engine catalysts) to the extent that they are readily available in the South <br />In Review of project -specific <br />In During project <br />In City of Santa <br />Coast Air Basin. Contract specifications shall be included in project <br />construction documents <br />construction <br />Ana Planning <br />construction documents, which shall be reviewed by the City of Santa Ana <br />■ Monitor construction <br />and Building <br />prior to issuance of a grading permit.Agency <br />activities <br />MM4.2-8 Project applicants shall require by contract specifications that all <br />In Inclusion in project -specific <br />■ Prior to issuance of <br />■ Project <br />heavy-duty diesel -powered equipment operating and refueling at the project <br />contract specifications <br />grading permits <br />Applicant <br />site use low-NOx diesel fuel to the extent that it is readily available and cost <br />■ Review of project -specific <br />In During project <br />Is City of Santa <br />effective (up to 125 percent of the cost of California Air Resources Board <br />construction documents <br />construction <br />Ana Planning <br />diesel) in the South Coast Air Basin (this does not apply to diesel -powered <br />■ Monitor construction <br />and Building <br />trucks traveling to and from the project site). Contract specifications shall be <br />activities <br />Agency <br />included in project construction documents, which shall be reviewed by the <br />City of Santa Ana prior to issuance of a grading permit. <br />11-4 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Appendix K <br />Mitigation Monitoring Reporting Program <br />CHAPTER 11 Mitigation Monitoring and Reporting <br />Program <br />11.1 INTRODUCTION <br />This section reflects the Mitigation Monitoring and Reporting Program (MMRP) requirements of Public <br />Resources Code (PRC) Section 21081.6. The California Environmental Quality Act (CEQA) Guidelines <br />Section 15097 states: <br />... In order to ensure that the mitigation measures and project revisions identified in the EIR or <br />negative declaration are implemented, the public agency shall adopt a program for monitoring or <br />reporting on the revisions which it has required in the project and the measures it has imposed to <br />mitigate or avoid significant environmental effects. A public agency may delegate reporting or <br />monitoring responsibilities to another public agency or to a private entity which accepts the <br />delegation; however, until mitigation measures have been completed the lead agency remains <br />responsible for ensuring that implementation of the mitigation measures occurs in accordance with <br />the program. <br />11.2 ENFORCEMENT <br />In accordance with CEQA, the primary responsibility for making determinations with respect to <br />potential environmental effects rests with the lead agency rather than the monitor or preparer. As such, <br />the City of Santa Ana is identified as the enforcement agency for this MMRP. <br />11.3 PROGRAM MODIFICATION <br />After review and approval by the lead agency, minor changes to the MMRP are permitted but can only <br />be made by the City of Santa Ana. No deviations from this MMRP shall be permitted unless it continues <br />to satisfy the requirements of PRC Section 21081.6, as determined by the lead agency. <br />11.4 MITIGATION MONITORING AND REPORTING PROGRAM <br />The organization of the MMRP follows the subsection formatting style as presented within the Transit <br />Zoning Code Environmental Impact Report (EIR). Only those subsections of the environmental issues <br />presented in the EIR that have mitigation measures are provided below in Table 11-1 (Mitigation <br />Monitoring and Reporting Program Matrix). All other subsections in the EIR do not contain mitigation <br />measures. <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 114 <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />ED OAK <br />INVES'I'IMEN'I'S <br />4199 CAMPUS DRIVE <br />IRVINE, CA 92612 <br />PHONE NO. (714) 342-2502 <br />1 <br />TF <br />li• <br />0 <br />Z <br />Q <br />2 <br />H <br />T— <br />O <br />N <br />Q <br />U <br />Q <br />Z <br />Q <br />Q <br />Z <br />Q <br />U) <br />w <br />w <br />U) <br />FICT <br />— <br />W <br />LO <br />T— <br />L0 <br />015 <br />Nt <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />SED ARCyJl <br />* No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />OF C A�-� <br />License Stamp <br />CONDITIONS OF <br />APPROVAL <br />Z <br />Q <br />J <br />1r n <br />ILL <br />VM! <br />N <br />N <br />O <br />N <br />1 <br />Ir- <br />00 <br />0 <br />COPYRIGHT <br />AO-71 <br />