<br />MM4.2-9 Project applicants shall require by contract specifications that
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Project
<br />alternative fuel construction equipment (i.e., compressed natural gas, liquid
<br />contractspecifications
<br />gradingPermits
<br />Applicant
<br />petroleum gas, and unleaded gasoline) be utilized to the extent that the
<br />In Review project -specific
<br />In During project
<br />In City of Santa
<br />equipment is readily available and cost effective in the South Coast Air Basin.
<br />construction documents
<br />construction
<br />Ana Planning
<br />Contract specifications shall be included in project construction documents,
<br />■ Monitor construction
<br />and Building
<br />which shall be reviewed by the City of Santa Ana prior to issuance of a grading
<br />activities
<br />Agency
<br />permit.
<br />MM4.2-10 Project applicants shall require by contract specifications that
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Project
<br />construction equipment engines be maintained in good condition and in proper
<br />contract specifications
<br />grading permits
<br />Applicant
<br />tune per manufacturer's specification for the duration of construction. Contract
<br />In Review project -specific
<br />In During project
<br />In City of Santa
<br />specifications shall be included in project construction documents, which shall
<br />construction documents
<br />construction
<br />Ana Planning
<br />be reviewed by the City of Santa Ana prior to issuance of a grading permit.
<br />In Monitor construction
<br />and Building
<br />activities
<br />Agency
<br />MM4.2-11 Project applicants shall require by contract specifications that
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Project
<br />construction operations rely on the electricity infrastructure surrounding the
<br />contract specifications
<br />grading permits
<br />Applicant
<br />construction site rather than electrical generators powered by internal
<br />In Review project -specific
<br />In Construction
<br />combustion engines to the extent feasible. Contract specifications shall be
<br />construction documents
<br />Contractor
<br />included in project construction documents, which shall be reviewed by the
<br />In Monitor construction
<br />InCity of Santa
<br />City of Santa Ana prior to issuance of a grading permit.
<br />activities
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-12 As required by South Coast Air Quality Management District Rule
<br />In Incorporate dust control
<br />In Prior to issuance of
<br />In Project
<br />403—Fugitive Dust, all construction activities that are capable of generating
<br />measures into project-
<br />grading permits
<br />Applicant
<br />fugitive dust are required to implement dust control measures during each
<br />specific contract
<br />In During project
<br />In Construction
<br />phase of project development to reduce the amount of particulate matter
<br />specifications
<br />construction
<br />Contractor
<br />entrained in the ambient air. These measures include the following:
<br />■ Review construction
<br />In City of Santa
<br />In Application of soil stabilizers to inactive construction areas
<br />documents
<br />Ana Planning
<br />In Quick replacement of ground cover in disturbed areas
<br />In Monitor construction
<br />and Building
<br />In Watering of exposed surfaces three times daily
<br />activities
<br />Agency
<br />In Watering of all unpaved haul roads three times daily
<br />■ Covering all stock piles with tarp
<br />■ Reduction of vehicle speed on unpaved roads
<br />■ Post signs on -site limiting traffic to 15 miles per hour or less
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-5
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure
<br />Action Required
<br />Monitoring Phase
<br />Agency/Party
<br />In Sweep streets adjacent to the project site at the end of the day if visible
<br />soil material is carried over to adjacent roads
<br />In Cover or have water applied to the exposed surface of all trucks hauling
<br />dirt, sand, soil, or other loose materials prior to leaving the site to prevent
<br />dust from impacting the surrounding areas
<br />In Install wheel washers where vehicles enter and exit unpaved roads onto
<br />paved roads to wash off trucks and any equipment leaving the site each
<br />trip
<br />MM4.2-13 The developer shall require by contract specifications that
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Project
<br />construction -related equipment, including heavy-duty equipment, motor
<br />contract specifications
<br />grading permits
<br />Applicant
<br />vehicles, and portable equipment, shall be turned off when not in use for more
<br />In Review and approve
<br />In During project
<br />In Construction
<br />than 30 minutes. Diesel -fueled commercial motor vehicles with gross vehicular
<br />project -specific
<br />construction
<br />Contractor
<br />weight ratings of greater than 10,000 pounds shall be turned off when not in
<br />construction documents
<br />In City of Santa
<br />use for more than 5 minutes. Contract specifications shall be included in the
<br />■ Monitor construction
<br />Ana Planning
<br />proposed project construction documents, which shall be approved by the City
<br />activities
<br />and Building
<br />of Santa Ana.
<br />Agency
<br />MM4.2-14 The developer shall require by contract specifications that
<br />■ Include in project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />construction parking be configured to minimize traffic interference during the
<br />contract specifications
<br />grading permits
<br />Applicant
<br />construction period and, therefore, reduce idling of traffic. Contract
<br />In Review and approve
<br />In Construction
<br />specifications shall be included in the proposed project construction
<br />project -specific
<br />Contractor
<br />documents, which shall be approved by the City of Santa Ana.
<br />construction documents
<br />In City of Santa
<br />In Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />MM4.2-15 The developer shall require by contract specifications that
<br />■ Include in project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />temporary traffic controls are provided, such as a flag person, during all
<br />contract specifications
<br />grading permits
<br />Applicant
<br />phases of construction to maintain smooth traffic flow. Contract specifications
<br />In Review and approve of
<br />In During project
<br />In Construction
<br />shall be included in the proposed project construction documents, which shall
<br />project -specific
<br />construction
<br />Contractor
<br />be approved by the City of Santa Ana.
<br />construction documents
<br />In City of Santa
<br />In Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />11-6 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table I 1 -1 Mitigation Monitoring and Reporting Program
<br />Matrix
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure Action Required Monitoring Phase
<br />Agency/Party
<br />MM4.2-16 The developer shall require by contract specifications that
<br />In Include in project -specific
<br />■ Prior to issuance of
<br />In Project
<br />construction activities that affect traffic flow on the arterial system by
<br />contract specifications
<br />grading permits
<br />Applicant
<br />scheduled to off-peak hours (9:00 A.M. to 3:00 P.M.). Contract specifications
<br />In Review and approve of
<br />In During project
<br />In Construction
<br />shall be included in the proposed project construction documents, which shall
<br />project -specific
<br />construction
<br />Contractor
<br />be approved by the City of Santa Ana.
<br />construction documents
<br />In City of Santa
<br />In Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />MM4.2-17 Upon issuance of building or grading permits, whichever is issued
<br />In Notify owners and
<br />In Prior to issuance of
<br />In Project
<br />earliest, notification shall be mailed to owners and occupants of all developed
<br />occupants of construction
<br />grading permits
<br />Applicant
<br />land uses within % mile of any project within the Transit Zoning Code (SD 84A
<br />activities occurring through
<br />■ During project
<br />■ City of Santa
<br />and SD 84B) boundaries greater than four stories in height or 25,000 sf in area
<br />the duration of the
<br />construction
<br />Ana Planning
<br />providing a schedule for major construction activities that will occur through
<br />construction period.
<br />and Building
<br />the duration of the construction period. In addition, the notification will include
<br />In Assign a designated
<br />Agency
<br />the identification and contact number for a community liaison and designated
<br />construction manager
<br />construction manager that would be available on site to monitor construction
<br />■ Identify designated
<br />activities. The construction manager shall be responsible for complying with all
<br />community liaison
<br />project requirements related to PM,o generation. The construction manager
<br />will be located at the on -site construction office during construction hours for
<br />■ Monitor construction
<br />the duration of all construction activities. Contact information for the
<br />activities
<br />community liaison and construction manager will be located at the construction
<br />office, City Hall, the police department, and a sign on site.
<br />MM4.2-18 The developer shall require by contract specifications that the
<br />In Include in project -specific
<br />contract specifications
<br />■ Review and approve
<br />project -specific
<br />construction documents
<br />■ Prior to issuance of
<br />grading permits
<br />■ During project
<br />construction
<br />In Project
<br />Applicant
<br />■ Construction
<br />Contractor
<br />In City of Santa
<br />architectural' coating paint and primer products used would have a
<br />ratings 12 grams per eat r of es�a cations s a eh II b —included
<br />in the proposed project construction documents, which shall be reviewed and
<br />approved by the City of Santa Ana.
<br />■ Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-7
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Aesthetics
<br />MM4.1-1 Proposed new structures shall be designed to maximize the use of
<br />■ Review building materials
<br />■ Prior to issuance of
<br />■ City of Santa
<br />textured or other non -reflective exterior surfaces and non -reflective glass.
<br />and design plans
<br />building permits for
<br />Ana Planning
<br />Building materials shall be reviewed by the City of Santa Ana prior to issuance
<br />each project
<br />and Building
<br />of building permits for each project.
<br />Agency
<br />MM4.1-2 All exterior lighting and advertising (including signage) shall be
<br />In Review project -specific
<br />In Prior to issuance of
<br />In City of Santa
<br />directed onto the specific location intended for illumination (e.g., parking lots,
<br />lighting plan
<br />occupancy permits
<br />Ana Planning
<br />driveways, and walkways) and shielded away from adjacent properties and
<br />for each project
<br />and Building
<br />public rights -of -way to minimize light spillover onto adjacent areas.
<br />Agency
<br />MM4.1-3 Prior to issuance of a building permit for a specific development
<br />In Submit project -specific
<br />In Prior to issuance of
<br />In Project
<br />project, the applicant shall submit a lighting plan to the City for review and
<br />lighting plan for review and
<br />building permits for
<br />Applicant
<br />approval. The plan shall specify the lighting type and placement to ensure that
<br />approval by the City
<br />each project
<br />In City of Santa
<br />the effects of security and other outdoor lighting are minimized on adjacent
<br />Ana Planning
<br />uses and do not create spillover effects. The plan shall specifically incorporate
<br />and Building
<br />the following design features:
<br />Agency
<br />■ All projects shall incorporate project design features to shield light and/or
<br />glare from vehicles entering or exiting parking lots and structures that face
<br />sensitive uses (e.g., schools, hospitals, senior housing, or other residential
<br />properties) by providing barriers so that light from vehicle headlights would
<br />not illuminate off -site sensitive uses.
<br />In All projects shall incorporate project design features to provide
<br />landscaping, physical barriers, screening, or other buffers to minimize
<br />project -generated illumination from entering off -site areas and to prevent
<br />glare or interference with vehicular traffic, in accordance with the City's
<br />Municipal Code.
<br />MM4.1-4 For any proposed structure that would exceed four stories in height,
<br />In Submit project -specific
<br />In Prior to issuance of
<br />In Project
<br />applicants shall submit a site -specific shade/shadow report with renderings
<br />shade/shadow report for
<br />building permits for
<br />Applicant
<br />representing the level of shade/shadows associated with the proposed
<br />review and approval by the
<br />each project
<br />In City of Santa
<br />development at the following times: 9:00 A.M., 12:00 P.M., 3:00 P.M. PST for the
<br />City
<br />Ana Planning
<br />both the winter and summer solstices. An additional rendering for the 5:00 P.M.
<br />and Building
<br />PST time period shall be prepared for the summer solstice period. Typically, a
<br />Agency
<br />variety of criteria are used to determine the significance of a shadow impact,
<br />including the following:
<br />In Affected land use (criticality of direct sunlight for the use)
<br />11-2 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible Compliance Verification
<br />MfTigation Measure Action Required Monitoring Phase Agency/Party Initial Date Comments
<br />In Duration (hours per day in shadow)
<br />■ Time of day (critical time period for direct sunlight)
<br />In Season (time of year use would be shadowed)
<br />In Extent (percentage of use that would be shadowed)
<br />In Preexisting condition (shadow condition due to existing buildings,
<br />landscaping, or other features)
<br />■ Type (solid or dappled shadow)
<br />The report shall include any feasible design considerations that would reduce
<br />the extent of shadows cast by a proposed structure. The analysis and the
<br />project design plans shall be forwarded to the Planning and Building Agency
<br />for review and approval.
<br />Air Quality
<br />MM4.2-1 Trash receptacles within the Transit Zoning Code (SD 84A and
<br />SD 84B) will be required to have lids that enable convenient collection and
<br />loading and will be emptied on a regular basis, in compliance with City of
<br />Santa Ana regulations for the collection of solid waste.
<br />In Verify site design to ensure
<br />lids will be used and there
<br />is proper access for waste
<br />disposal
<br />In During project
<br />design review
<br />In City of Santa
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-2 The construction contractor shall ensure that no more than 5 acres
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Construction
<br />per day are actively graded or developed.
<br />contract specifications
<br />grading permits
<br />Contractor
<br />In Monitor construction
<br />In City of Santa
<br />activities
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-3 The construction contractor shall ensure that all active disturbed
<br />■ Include in project -specific
<br />■ Prior to issuance of
<br />■ Construction
<br />surfaces should be watered three times per day throughout the construction
<br />contract specifications
<br />grading permits
<br />Contractor
<br />period.
<br />■ Monitor construction
<br />■ City of Santa
<br />activities
<br />Ana Planning
<br />and Building
<br />Agency
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-3
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table I 1 -1 Mitigation Monitoring and Reporting Program
<br />Matrix
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure Action Required Monitoring Phase
<br />Agency/Party
<br />MM4.2-4 The construction contractor shall ensure that the mass grading, fine
<br />In Include in project -specific
<br />In Prior to issuance of
<br />In Construction
<br />grading, and structure construction are conducted at separate time periods
<br />contract specifications
<br />grading permits
<br />Contractor
<br />and do not overlap with one another.
<br />In Review of project -specific
<br />In During site grading
<br />In City of Santa
<br />construction documents
<br />and construction
<br />Ana Planning
<br />In Monitor construction
<br />and Building
<br />activities
<br />Agency
<br />MM4.2-5 The construction contractor shall ensure that all haul roads are
<br />■ Inclusion in project -specific
<br />■ Prior to issuance of
<br />■ Construction
<br />watered three (3) times per day.
<br />contract specifications
<br />grading permits
<br />Contractor
<br />In Review of project -specific
<br />In During site grading
<br />■ City of Santa
<br />construction documents
<br />Ana Planning
<br />In Monitor construction
<br />and Building
<br />activities
<br />Agency
<br />MM4.2-6 The construction contractor shall ensure that all traffic on unpaved
<br />In Inclusion in project -specific
<br />In Prior to issuance of
<br />In Construction
<br />roads is reduced to 15 mph or less.
<br />contract specifications
<br />grading permits
<br />Contractor
<br />In Review of project -specific
<br />In During site grading
<br />In City of Santa
<br />construction documents
<br />Ana Planning
<br />In Monitor construction
<br />and Building
<br />activities
<br />Agency
<br />MM4.2-7 Project applicants shall require by contract specifications that all
<br />In Inclusion in project -specific
<br />In Prior to issuance of
<br />■ Project
<br />diesel -powered equipment used will be retrofitted with after -treatment products
<br />contract specifications
<br />grading permits
<br />Applicant
<br />(e.g., engine catalysts) to the extent that they are readily available in the South
<br />In Review of project -specific
<br />In During project
<br />In City of Santa
<br />Coast Air Basin. Contract specifications shall be included in project
<br />construction documents
<br />construction
<br />Ana Planning
<br />construction documents, which shall be reviewed by the City of Santa Ana
<br />■ Monitor construction
<br />and Building
<br />prior to issuance of a grading permit.Agency
<br />activities
<br />MM4.2-8 Project applicants shall require by contract specifications that all
<br />In Inclusion in project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />heavy-duty diesel -powered equipment operating and refueling at the project
<br />contract specifications
<br />grading permits
<br />Applicant
<br />site use low-NOx diesel fuel to the extent that it is readily available and cost
<br />■ Review of project -specific
<br />In During project
<br />Is City of Santa
<br />effective (up to 125 percent of the cost of California Air Resources Board
<br />construction documents
<br />construction
<br />Ana Planning
<br />diesel) in the South Coast Air Basin (this does not apply to diesel -powered
<br />■ Monitor construction
<br />and Building
<br />trucks traveling to and from the project site). Contract specifications shall be
<br />activities
<br />Agency
<br />included in project construction documents, which shall be reviewed by the
<br />City of Santa Ana prior to issuance of a grading permit.
<br />11-4 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Appendix K
<br />Mitigation Monitoring Reporting Program
<br />CHAPTER 11 Mitigation Monitoring and Reporting
<br />Program
<br />11.1 INTRODUCTION
<br />This section reflects the Mitigation Monitoring and Reporting Program (MMRP) requirements of Public
<br />Resources Code (PRC) Section 21081.6. The California Environmental Quality Act (CEQA) Guidelines
<br />Section 15097 states:
<br />... In order to ensure that the mitigation measures and project revisions identified in the EIR or
<br />negative declaration are implemented, the public agency shall adopt a program for monitoring or
<br />reporting on the revisions which it has required in the project and the measures it has imposed to
<br />mitigate or avoid significant environmental effects. A public agency may delegate reporting or
<br />monitoring responsibilities to another public agency or to a private entity which accepts the
<br />delegation; however, until mitigation measures have been completed the lead agency remains
<br />responsible for ensuring that implementation of the mitigation measures occurs in accordance with
<br />the program.
<br />11.2 ENFORCEMENT
<br />In accordance with CEQA, the primary responsibility for making determinations with respect to
<br />potential environmental effects rests with the lead agency rather than the monitor or preparer. As such,
<br />the City of Santa Ana is identified as the enforcement agency for this MMRP.
<br />11.3 PROGRAM MODIFICATION
<br />After review and approval by the lead agency, minor changes to the MMRP are permitted but can only
<br />be made by the City of Santa Ana. No deviations from this MMRP shall be permitted unless it continues
<br />to satisfy the requirements of PRC Section 21081.6, as determined by the lead agency.
<br />11.4 MITIGATION MONITORING AND REPORTING PROGRAM
<br />The organization of the MMRP follows the subsection formatting style as presented within the Transit
<br />Zoning Code Environmental Impact Report (EIR). Only those subsections of the environmental issues
<br />presented in the EIR that have mitigation measures are provided below in Table 11-1 (Mitigation
<br />Monitoring and Reporting Program Matrix). All other subsections in the EIR do not contain mitigation
<br />measures.
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 114
<br />Architecture + Planning
<br />17911 Von Karman Ave.
<br />Suite 200
<br />Irvine, CA 92614
<br />ktgy.com
<br />949.851.2133
<br />KTGY Project No: 2017-0934
<br />Project Contact: Debbie Holland
<br />Email: dholland@ktgy.com
<br />Principal: Wil Wong
<br />Project Designer: D. Schoolmeester
<br />Project Director: Debbie Holland
<br />Developer
<br />ED OAK
<br />INVES'I'IMEN'I'S
<br />4199 CAMPUS DRIVE
<br />IRVINE, CA 92612
<br />PHONE NO. (714) 342-2502
<br />1
<br />TF
<br />li•
<br />0
<br />Z
<br />Q
<br />2
<br />H
<br />T—
<br />O
<br />N
<br />Q
<br />U
<br />Q
<br />Z
<br />Q
<br />Q
<br />Z
<br />Q
<br />U)
<br />w
<br />w
<br />U)
<br />FICT
<br />—
<br />W
<br />LO
<br />T—
<br />L0
<br />015
<br />Nt
<br />No. Date Description
<br />It is the clients responsibility prior to or during construction to notify the architect in writing
<br />of any perceived errors or omissions in the plans and specifications of which a contractor
<br />thoroughly knowledgeable with the building codes and methods of construction should
<br />reasonably be aware. Written instructions addressing such perceived errors or omissions
<br />shall be received from the architect prior to the client or clients subcontractors proceeding
<br />with the work. The client will be responsible for any defects in construction if these
<br />procedures are not followed.
<br />SED ARCyJl
<br />* No. C29795
<br />RENEWAL DATE
<br />AUGUST 31, 2023
<br />OF C A�-�
<br />License Stamp
<br />CONDITIONS OF
<br />APPROVAL
<br />Z
<br />Q
<br />J
<br />1r n
<br />ILL
<br />VM!
<br />N
<br />N
<br />O
<br />N
<br />1
<br />Ir-
<br />00
<br />0
<br />COPYRIGHT
<br />AO-71
<br />
|