Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible
<br />Compliance Venrcation
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure
<br />Acton Required
<br />Monitoring Phase
<br />Agency/Party
<br />Section 7050.5 of California's Health and Safety Code. The technical report or
<br />memorandum shall be submitted to the City of Santa Ana for approval. As
<br />determined necessary by the City, environmental documentation (e.g., CEQA
<br />documentation) prepared for future development within the project site shall
<br />reference or incorporate the findings and recommendations of the technical
<br />report or memorandum. The project applicant shall be responsible for
<br />implementing methods for eliminating or avoiding impacts on archaeological
<br />resources identified in the technical report or memorandum. Projects that
<br />would not encounter undisturbed soils and would therefore not be required to
<br />retain an archaeologist shall demonstrate non -disturbance to the City through
<br />the appropriate construction plans or geotechnical studies prior to any earth -
<br />disturbing activities. Projects that would include any earth disturbance
<br />(disturbed or undisturbed soils) shall comply with MM4.4-2(b).
<br />MM4.4-1(b) If evidence of an archaeological site or other suspected historical
<br />■ Retain qualified
<br />■ During construction
<br />■ Project
<br />resource as defined by CEQA Guidelines Section 15064.5, including darkened
<br />archeologist
<br />period
<br />Applicant
<br />soil representing past human activity ("midden"), that could conceal material
<br />■ In the event cultural
<br />■ City of Santa
<br />remains (e.g., worked stone, fired clay vessels, faunal bone, hearths, storage
<br />resources are
<br />Ana Planning
<br />pits, or burials) are discovered during any project -related earth -disturbing
<br />encountered, record with
<br />and Building
<br />activities (including projects that would not encounter undisturbed soils), all
<br />the SCCIC
<br />Agency
<br />earth -disturbing activity within 100 feet of the find shall be halted and the City
<br />of Santa Ana shall be notified. The project applicant shall retain an
<br />archaeologist who meets the Secretary of the Interior's Professional
<br />Qualifications Standards for Archaeology to assess the significance of the find.
<br />Impacts to any significant resources shall be mitigated to a less -than -
<br />significant level through data recovery or other methods determined adequate
<br />by the archaeologist and that are consistent with the Secretary of the Interior's
<br />Standards for Archaeological Documentation. Any identified cultural resources
<br />shall be recorded on the appropriate DPR 523 (A-L) form and filed with the
<br />SCCIC.
<br />MM4.4-2(a) Prior to any earth -disturbing activities (e.g., excavation, trenching,
<br />■ Retain professional
<br />■ Prior to project
<br />■ Project
<br />grading) that could encounter undisturbed soils, the project applicant shall
<br />paleontologist
<br />approval
<br />Applicant
<br />retain a professional paleontologist to determine if the project could directly or
<br />m Prepare and submit
<br />■ City of Santa
<br />indirectly destroy a unique paleontological resource or site or unique geologic
<br />technical report or
<br />Ana Planning
<br />feature. The investigation shall include, as determined appropriate by the
<br />memorandum for review
<br />and Building
<br />paleontologist and the City of Santa Ana, a paleontology records check and a
<br />and approval by the City
<br />Agency
<br />pedestrian survey of the area proposed for development. The results of the
<br />investigation shall be documented in a technical report or memorandum that
<br />11-14 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table 11 -1 Mitigation
<br />Monitoring and Reporting Program Matrix
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure
<br />Action Required Monitoring Phase Agency/Party
<br />identifies the paleontological sensitivity of the development area and includes
<br />recommendations and methods for eliminating or avoiding impacts on
<br />paleontological resources or unique geologic features. The technical report or
<br />memorandum shall be submitted to the City for approval. As determined
<br />necessary by the City, environmental documentation (e.g., CEQA
<br />documentation) prepared for future development within the project site shall
<br />reference or incorporate the findings and recommendations of the technical
<br />report or memorandum. The project applicant shall be responsible for
<br />implementing methods for eliminating or avoiding impacts on paleontological
<br />resources or unique geologic features identified in the technical report or
<br />memorandum. Projects that would not encounter undisturbed soils and would
<br />therefore not be required to retain a paleontologist shall demonstrate non -
<br />disturbance to the City through the appropriate construction plans or
<br />geotechnical studies prior to any earth -disturbing activities. Projects that would
<br />include any earth disturbance (disturbed or undisturbed soils) shall comply
<br />with MM4.4-3(b).
<br />MM4.4-2(b) Should paleontological resources (i.e., fossil remains) be
<br />■ In the event that
<br />■ Prior to issuance of
<br />■ Project
<br />identified at a particular site during project construction, the construction
<br />paleontological resources
<br />grading permits
<br />Applicant
<br />foreman shall cease construction within 100 feet of the find until a qualified
<br />are encountered,
<br />■ City of Santa
<br />professional can provide an evaluation. Mitigation of resource impacts shall be
<br />Implement mitigation
<br />Ana Planning
<br />implemented and funded by the project applicant and shall be conducted as
<br />m Incorporate mitigation in
<br />and Building
<br />follows:
<br />contract specifications and
<br />Agency
<br />1. Identify and evaluate paleontological resources by intense field survey
<br />construction documents
<br />where impacts are considered high
<br />2. Assess effects on identified sites
<br />3. Consult with the institutional/academic paleontologists conducting
<br />research investigations within the geological formations that are slated to
<br />be impacted
<br />4. Obtain comments from the researchers
<br />5. Comply with researchers' recommendations to address any significant
<br />adverse effects where determined by the City to be feasible
<br />In considering any suggested mitigation proposed by the consulting
<br />paleontologist, the City of Santa Ana staff shall determine whether avoidance
<br />is necessary and feasible in light of factors such as the nature of the find,
<br />project design, costs, applicable policies and land use assumptions, and other
<br />considerations. If avoidance is unnecessary or infeasible, other appropriate
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-15
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table I 1 -1 Mitigation Monitoring and Reporting Program
<br />Matrix
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure Action Required Monitoring Phase
<br />Agency/Party
<br />measures (e.g., data recovery) shall be instituted. Work may proceed on other
<br />parts of the project site while mitigation for paleontological resources is carried
<br />out.
<br />MM4.4-3 Prior to development activities that would demolish or otherwise
<br />■ Submit technical report or
<br />■ Prior to issuance of
<br />■ Project
<br />physically affect buildings or structures 50 years old or older or affect their
<br />memorandum for approval
<br />demolition permits
<br />Applicant
<br />historic setting, the project applicant shall retain a cultural resource
<br />by the City
<br />■ City of Santa
<br />professional who meets the Secretary of the Interior's Professional
<br />■ Implement identified
<br />Ana Planning
<br />Qualifications Standards for Architectural History to determine if the project
<br />measures
<br />and Building
<br />would cause a substantial adverse change in the significance of a historical
<br />Agency
<br />resource as defined in Section 15064.5 of the CEQA Guidelines. The
<br />investigation shall include, as determined appropriate by the cultural resource
<br />professional and the City of Santa Ana, the appropriate archival research,
<br />including, if necessary, an updated records search of the South Central
<br />Coastal Information Center (SCCIC) of the California Historical Resources
<br />Information System (CHRIS) and a pedestrian survey of the proposed
<br />development area to determine if any significant historic -period resources
<br />would be adversely affected by the proposed development. The results of the
<br />investigation shall be documented in a technical report or memorandum that
<br />identifies and evaluates any historical resources within the development area
<br />and includes recommendations and methods for eliminating or reducing
<br />impacts on historical resources. The technical report or memorandum shall be
<br />submitted to the City Santa Ana for approval. As determined necessary by the
<br />City, environmental documentation (e.g., CEQA documentation) prepared for
<br />future development within the project site shall reference or incorporate the
<br />findings and recommendations of the technical report or memorandum. The
<br />project applicant shall be responsible for implementing methods for eliminating
<br />or reducing impacts on historical resources identified in the technical report or
<br />memorandum. Such methods could include, but not be limited to, written and
<br />photographic recordation of the resource in accordance with the level of
<br />Historic American Building Survey (HABS) documentation that is appropriate
<br />to the significance (local, state, national) of the resource.
<br />11-16 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible
<br />Compliance Venrcation
<br />Initial
<br />Date
<br />Comments
<br />Mtigation Measure
<br />Acton Required
<br />Monitoring Phase
<br />Agency/Party
<br />mainline breaks, and eliminating over -watering and flooding due to pipe and/or
<br />head breaks.
<br />M111114.2-29 Landscape designers shall ensure that Project landscaping of
<br />■ Include in landscaping plan
<br />■ Prior to issuance of
<br />■ Project
<br />commercial/industrial/common areas uses drought -tolerant and smog -tolerant
<br />and design plans
<br />certificate of
<br />Applicant
<br />trees, shrubs, and groundcover to ensure long-term viability and conserve
<br />m Verification at inspection
<br />occupancy
<br />■ City of Santa
<br />water and energy.
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-30 Landscape designers shall ensure that the landscape plan includes
<br />■ Include in landscaping plan
<br />■ Prior to issuance of
<br />■ Project
<br />drought resistant trees, shrubs, and groundcover within the parking lot and
<br />and design plans
<br />certificate of
<br />Applicant
<br />perimeter.
<br />■ Verification at inspection
<br />occupancy
<br />■ City of Santa
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-31 Project designers shall ensure that design features incorporate
<br />■ Include in design plans
<br />■ Prior to approval of
<br />■ Project
<br />light-colored roofing materials that will deflect heat away from the building and
<br />. Verification at inspection
<br />each potential
<br />Applicant
<br />conserve energy.
<br />future development
<br />m City of Santa
<br />project
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-32 The Project designers shall ensure that designs include all
<br />■ Include in design plans
<br />■ Prior to approval of
<br />■ Project
<br />illumination elements to have controls to allow selective use as an energy
<br />each potential
<br />Applicant
<br />conservation measure.
<br />future development
<br />m City of Santa
<br />project
<br />Ana Planning
<br />and Building
<br />Agency
<br />M111114.2-33 Prior to issuance of a building permit, the applicant shall
<br />■ Submit compliance
<br />■ Prior to issuance of
<br />■ Project
<br />demonstrate that measures have been included to promote ride sharing
<br />document for review and
<br />building permit
<br />Applicant
<br />programs such as, but not necessarily including, publishing ride sharing
<br />approval
<br />■ Prior to issuance of
<br />■ City of Santa
<br />information for all of the tenants, designating a certain percentage of parking
<br />0 Confirm installation of
<br />occupancy permit
<br />Ana Planning
<br />spaces for ride sharing vehicles, designating adequate passenger loading and
<br />design features and
<br />and Building
<br />unloading and waiting areas for ride sharing vehicles, and providing a website
<br />equipment
<br />Agency
<br />or message board for coordinating rides. Documentation of compliance with
<br />this measure shall be provided to the City Building Official for review and
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-11
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Miitigation Measure
<br />Action Required
<br />Monitoring Phase
<br />Agency/Party
<br />approval. Installation of the identified design features or equipment will be
<br />confirmed by the City Building Official prior to issuance of certificate of
<br />occupancy.
<br />MM4.2-34 Prior to issuance of a building permit, the applicant shall
<br />■ Submit compliance
<br />■ Prior to issuance of
<br />■ Project
<br />demonstrate that measures have been included to provide adequate bicycle
<br />document for review and
<br />building permit
<br />Applicant
<br />parking near building entrances to promote cyclist safety, security, and
<br />approval
<br />■ Prior to issuance of
<br />■ City of Santa
<br />convenience. Documentation of compliance with this measure shall be
<br />o Confirm installation of
<br />occupancy permit
<br />Ana Planning
<br />provided to the City Building Official for review and approval. Installation of the
<br />design features and
<br />and Building
<br />identified design features or equipment will be confirmed by the City Building
<br />equipment
<br />Agency
<br />Official prior to issuance of certificate of occupancy.
<br />MM4.2-35 Prior to issuance of any certificate of occupancy, the applicant shall
<br />■ Confirm installation of
<br />■ Prior to issuance of
<br />■ Project
<br />demonstrate that all interior building lighting supports the use of compact
<br />design features and
<br />occupancy permit
<br />Applicant
<br />fluorescent light bulbs or equivalently efficient lighting to the satisfaction of the
<br />equipment
<br />■ City of Santa
<br />City Building Official.
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-36 Tenants shall be responsible to ensure that preferential parking
<br />■ Inform tenants of
<br />■ Prior to issuance of
<br />■ City of Santa
<br />spaces are allocated to ultra -low emission vehicles and alternative fueled
<br />preferential parking space
<br />certificate of
<br />Ana Planning
<br />vehicles to encourage the use of alternative fuels and ultra -low emission
<br />policy
<br />occupancy and On-
<br />and Building
<br />vehicles.
<br />going through
<br />Agency
<br />individual project
<br />■ Project
<br />operation
<br />Applicant
<br />Biological Resources
<br />MM4.3-1 To ensure that avian species of concern, protected migratory species
<br />■ Incorporate measures in
<br />■ Prior to issuance of
<br />■ Project
<br />(e.g., MBTA), or raptors species are not injured or disturbed by construction in
<br />contract specifications and
<br />grading permit
<br />Applicant
<br />the vicinity of nesting habitat, the project applicant shall implement the
<br />construction documents
<br />■ During construction
<br />■ City of Santa
<br />following measures:
<br />Ana Planning
<br />1. Tree removal shall be restricted to the period between August 30 and
<br />and Building
<br />February 15, to the extent feasible, to avoid the breeding season of any
<br />Agency
<br />migratory species that could be using the area, and to discourage nesting
<br />in the vicinity of an upcoming construction area. If it is not feasible to
<br />remove trees outside this window then, prior to the beginning of mass
<br />grading, including grading for major infrastructure improvements, during
<br />the period between February 15 and August 30, all trees within 250 feet of
<br />any grading or earthmoving activity shall be surveyed for active nests by a
<br />11-12 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table 11 -1 Mitigation Monitoring and Reporting
<br />Mitigation Measure Action Required
<br />Program
<br />Monfforing Phase
<br />Matrix
<br />Responsible
<br />Agency/Party
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />qualified biologist no more than 30 days prior to disturbance. If active
<br />nests are found, and the site is within 250 feet of potential construction
<br />activity, a temporary fence shall be erected, where appropriate, around
<br />the tree(s) at a distance of up to 250 feet, depending on the species, from
<br />the edge of the canopy to prevent construction disturbance and intrusions
<br />on the nest area. The appropriate buffer shall be determined in
<br />consultation with the City of Santa Ana Park Naturalist or a designee.
<br />2. No construction vehicles shall be permitted within restricted areas (i.e.,
<br />protection zones), unless directly related to the management or protection
<br />of the legally protected species.
<br />3. If a legally protected species nest is located in a tree designated for
<br />removal, the removal shall be deferred until after August 30, or until the
<br />adults and young of the year are no longer dependent on the nest site as
<br />determined by a qualified biologist.
<br />Cultural Resources
<br />MM4.4-1(a) Prior to any earth -disturbing activities (e.g., excavation, trenching,
<br />■ Retain a qualified
<br />■ Prior to issuance of
<br />■ Project
<br />grading) that could encounter undisturbed soils, the project applicant shall
<br />archeologist to prepare
<br />grading permits
<br />Applicant
<br />retain an archaeologist who meets the Secretary of the Interior's Professional
<br />technical report or
<br />■ City of Santa
<br />Qualifications Standards for Archaeology to determine if the project could
<br />memorandum
<br />Ana Planning
<br />result in a substantial adverse change in the significance of an archaeological
<br />o Submit project -specific
<br />and Building
<br />resource pursuant to Section 15064.5 of the CEQA Guidelines or disturb
<br />environmental
<br />Agency
<br />human remains. The investigation shall include, as determined appropriate by
<br />documentation relating to
<br />the archaeologist and the City of Santa Ana, an updated records search of the
<br />archeological resources
<br />South Central Coastal Information Center (SCCIC) of the California Historical
<br />Or
<br />Resources Information System (CHRIS), updated Native American
<br />consultation, and a pedestrian survey of the area proposed for development.
<br />■ Demonstration of non -
<br />The results of the investigation shall be documented in a technical report or
<br />disturbance
<br />memorandum that identifies and evaluates any archaeological resources
<br />within the development area and includes recommendations and methods for
<br />eliminating or avoiding impacts on archaeological resources or human
<br />remains. The measures shall include, as appropriate, subsurface testing of
<br />archaeological resources and/or construction monitoring by a qualified
<br />Native American Monitor selected from a locally affiliated Tribe identified by
<br />professional and i� necessary appropriate Native American monitors
<br />identified by -the -applicable tribe-( the-Gabrielino Tengva Nation) and/or
<br />the Native American Heritage Commission. The methods shall also include
<br />procedures for the unanticipated discovery of human remains, which shall be
<br />in accordance with Section 5097.98 of the State Public Resources Code and
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-13
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Responsible
<br />Compliance Venrcation
<br />Initial
<br />Date
<br />Comments
<br />Mtigation Measure
<br />Acton Required
<br />Monitoring Phase
<br />Agency/Party
<br />MM4.2-19 The developer shall require by contract specifications that materials
<br />■ Include in project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />that do not require painting be used during construction to the extent feasible.
<br />q P 9 9
<br />contracts specifications
<br />P
<br />grading permits
<br />9 9 P
<br />Applicant
<br />PP
<br />Contract specifications shall be included in the proposed project construction
<br />m Review and approve
<br />■ Construction
<br />documents, which shall be reviewed and approved by the City of Santa Ana.
<br />project -specific
<br />Contractor
<br />construction documents
<br />■ City of Santa
<br />■ Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />MM4.2-20 The developer shall require by contract specifications that pre-
<br />■ Include in project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />painted construction materials be used to the extent feasible. Contract
<br />contract specifications
<br />grading permits
<br />Applicant
<br />specifications shall be included in the proposed project construction
<br />m Review and approve
<br />■ Construction
<br />documents, which shall be reviewed and approved by the City of Santa Ana.
<br />project -specific
<br />Contractor
<br />construction documents
<br />■ City of Santa
<br />■ Monitor construction
<br />Ana Planning
<br />activities
<br />and Building
<br />Agency
<br />MM4.2-21 As individual components of the Transit Zoning Code (SD 84A and
<br />■ Prepare project -specific air
<br />■ Prior to approval of
<br />■ City of Santa
<br />SD 84B) are implemented, an air quality impact analysis will be completed to
<br />quality impact analysis
<br />each potential
<br />Ana Planning
<br />determine their independent significance levels. Mitigation is to be
<br />m Review of air quality impact
<br />future development
<br />and Building
<br />incorporated at the individual component level to bring the individual
<br />analysis
<br />project
<br />Agency
<br />components to less than significant on a site -by -site basis.
<br />MM4.2-22 Prior to issuance of a building permit, the applicant shall
<br />■ Submit compliance
<br />■ Prior to issuance of
<br />■ Project
<br />demonstrate that the design of the proposed buildings or structures exceeds
<br />documentation for review
<br />building permit
<br />Applicant
<br />current Title 24 requirements (Title 24, Part 6 of the California Code of
<br />and approval
<br />■ City of Santa
<br />Regulations; The Energy Commission adopted the 2008 ;Standards on April
<br />Ana Planning
<br />23, 2008, and the Building Standards Commission approved them for
<br />Out Of date
<br />and Building
<br />publication on September 11, 2008. The 2008 Residential Compliance Manual
<br />Code references
<br />Agency
<br />was adopted by the Commission on December 17, 2008, and the 2008 Non-
<br />residential Compliance Manual was adopted January 14, 2009.Energy
<br />Efficiency Standards for Residential and Non Residential Buildings, as
<br />amended November 1, 2005; Cool Roof Coatings performance standards as
<br />amended September 11, 2006) by a minimum of 20 percent, subject to review
<br />by the County Building Official. Documentation of compliance with this
<br />measure shall be provided to the Planning Department and Building Official for
<br />review and approval prior to issuance of the permit. Installation of the identified
<br />11-8 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table I 1 -1 Mitigation Monitoring and Reporting
<br />Program Matrix
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure Action Required
<br />Monitoring Phase Agency/Party
<br />design features or equipment will be confirmed by the County Building Official
<br />prior to certificate of occupancy. Any combination of the following design
<br />features may be used to fulfill this mitigation provided that the total -increase in
<br />efficiency meets or exceeds 20 percen :
<br />■ Increase in insulation such that heat transfer and thermal bridging is
<br />minimized
<br />■ Limit air leakage through the structure or within the heating and cooling
<br />distribution system to minimize energy consumption
<br />■ Incorporate dual -paned or other energy efficient windows
<br />■ Incorporate energy efficient space heating and cooling equipment
<br />■ Incorporate energy efficient light fixtures
<br />Is Incorporate energy efficient appliances
<br />Is Incorporate energy efficient domestic hot water systems
<br />■ Incorporate solar panels into the electrical system
<br />■ Incorporate cool roofs/light-colored roofing
<br />■ Or other measures that will increase the energy efficiency of building
<br />envelope in a manner that when combined with the other options listed
<br />P P
<br />above exceeds current Title 24 Standards (Title 24, Part 6 of the California
<br />Code of Regulations; Energy Efficiency Standards for Residential and Non
<br />Residential Buildings, as amended November 1, 2005; Cool Roof
<br />Coatings performance standards as amended September 11, 2006) by a
<br />minimum of 20 percent
<br />MM4.2-23 Prior to issuance of a building permit, the applicant shall provide a
<br />■ Prepare project -specific
<br />■ Prior to issuance of
<br />■ Project
<br />landscape plan for the Project that includes shade trees around main
<br />landscape plans
<br />building permit
<br />Applicant
<br />buildings, particularly along southern elevations where practical, and will not
<br />. Submit compliance
<br />■ City of Santa
<br />interfere with loading dock locations or other operational constraints.
<br />documentation for review
<br />Ana Planning
<br />Documentation of compliance with this measure shall be provided to the City
<br />and approval
<br />and Building
<br />Building Official for review and approval.
<br />Agency
<br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 11-9
<br />Chapter 11 Mitigation Monitoring and Reporting Program
<br />Table 11 -1 Mitigation Monitoring and Reporting Program
<br />Matrix
<br />I
<br />Responsible
<br />Compliance Verification
<br />Initial
<br />Date
<br />Comments
<br />Mitigation Measure Action Required Monitoring Phase
<br />Agency/Party
<br />MM4.2-24 Prior to issuance of a building permit, the applicant shall
<br />■ Submit compliance
<br />■ Prior to issuance of
<br />■ Project
<br />demonstrate that the proposed building or structure designs incorporate
<br />document for review and
<br />building permit
<br />Applicant
<br />exterior storage areas for recyclables and green waste and adequate recycling
<br />approval
<br />■ Prior to issuance of
<br />■ City of Santa
<br />containers located in public areas. Documentation of compliance with this
<br />m Confirm incorporation of
<br />certificate of
<br />Ana Planning
<br />measure shall be provided to the City Building Official for review and approval.
<br />design features and
<br />occupancy
<br />and Building
<br />Installation of the identified design features or equipment will be confirmed by
<br />equipment in design plans
<br />Agency
<br />the City Building Official prior to issuance of certificate of occupancy.
<br />and construction
<br />documents
<br />MM4.2-25 The applicant shall provide education and publicity about reducing
<br />■ Provide education and
<br />■ Prior to issuance of
<br />■ Project
<br />waste and available recycling services to future tenants. The education and
<br />publicity materials for
<br />certificate of
<br />Applicant
<br />publicity materials shall be provided to the City for review and approval by the
<br />review and approval
<br />occupancy
<br />■ City of Santa
<br />Planning Department.
<br />■ Provide education and
<br />Ana Planning
<br />publicity materials to future
<br />and Building
<br />tenants
<br />Agency
<br />MM4.2-26 All showerheads, lavatory faucets, and sink faucets within the
<br />■ Include in design plans
<br />■ Prior to issuance of
<br />■ Project
<br />residential units shall comply with the California Energy Conservation flow rate
<br />certificate of
<br />Applicant
<br />standards.
<br />occupancy
<br />■ City of Santa
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-27 Low -flush toilets shall be installed within all commercial and
<br />■ Include in design plans
<br />■ Prior to issuance of
<br />■ Project
<br />residential (including Congregate Care) units as specified in California State
<br />certificate of
<br />Applicant
<br />Health and Safety Code Section 17921.3.
<br />occupancy
<br />■ City of Santa
<br />Ana Planning
<br />and Building
<br />Agency
<br />MM4.2-28 All commercial/industrial/common area irrigation areas shall be
<br />■ Include in design plans
<br />■ Prior to approval of
<br />■ Project
<br />capable of being operated by a computerized irrigation system which includes
<br />each potential
<br />Applicant
<br />an on -site weather station/ET gage capable of reading current weather data
<br />future development
<br />m City of Santa
<br />and making automatic adjustments to independent run times for each irrigation
<br />project
<br />Ana Planning
<br />valve based on changes in temperature, solar radiation, relative humidity, rain,
<br />■ Prior to issuance of
<br />and Building
<br />and wind. In addition, the computerized irrigation system shall be equipped
<br />certificate of
<br />Agency
<br />with flow -sensing capabilities, thus automatically shutting down the irrigation
<br />occupancy
<br />system in the event of a mainline break or broken head. These features will
<br />assist in conserving water, eliminating the potential of slope failure due to
<br />11-10 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR
<br />Architecture + Planning
<br />17911 Von Karman Ave.
<br />Suite 200
<br />Irvine, CA 92614
<br />ktgy.com
<br />949.851.2133
<br />KTGY Project No: 2017-0934
<br />Project Contact: Debbie Holland
<br />Email: dholland@ktgy.com
<br />Principal: Wil Wong
<br />Project Designer: D. Schoolmeester
<br />Project Director: Debbie Holland
<br />Developer
<br />EI7 OAK
<br />4199 CAMPUS DRIVE
<br />IRVINE, CA 92612
<br />PHONE NO. (714) 342-2502
<br />1
<br />TF
<br />0
<br />Z
<br />Q
<br />2
<br />H
<br />LO
<br />T_
<br />L0
<br />015
<br />T_
<br />Nt
<br />No. Date Description
<br />It is the clients responsibility prior to or during construction to notify the architect in writing
<br />of any perceived errors or omissions in the plans and specifications of which a contractor
<br />thoroughly knowledgeable with the building codes and methods of construction should
<br />reasonably be aware. Written instructions addressing such perceived errors or omissions
<br />shall be received from the architect prior to the client or clients subcontractors proceeding
<br />with the work. The client will be responsible for any defects in construction if these
<br />procedures are not followed.
<br />c&D ARC, ,,
<br />�G R 0
<br />* No. C29795
<br />RENEWAL DATE
<br />AUGUST 31, 2023
<br />OF CAS\
<br />License Stamp
<br />CONDITIONS OF
<br />APPROVAL
<br />Z
<br />Q
<br />J
<br />W
<br />1
<br />0.
<br />ILL
<br />N
<br />O
<br />N
<br />1
<br />Ir-
<br />00
<br />0
<br />COPYRIGHT
<br />AO-72
<br />
|