Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Venrcation <br />Initial <br />Date <br />Comments <br />Mitigation Measure <br />Acton Required <br />Monitoring Phase <br />Agency/Party <br />Section 7050.5 of California's Health and Safety Code. The technical report or <br />memorandum shall be submitted to the City of Santa Ana for approval. As <br />determined necessary by the City, environmental documentation (e.g., CEQA <br />documentation) prepared for future development within the project site shall <br />reference or incorporate the findings and recommendations of the technical <br />report or memorandum. The project applicant shall be responsible for <br />implementing methods for eliminating or avoiding impacts on archaeological <br />resources identified in the technical report or memorandum. Projects that <br />would not encounter undisturbed soils and would therefore not be required to <br />retain an archaeologist shall demonstrate non -disturbance to the City through <br />the appropriate construction plans or geotechnical studies prior to any earth - <br />disturbing activities. Projects that would include any earth disturbance <br />(disturbed or undisturbed soils) shall comply with MM4.4-2(b). <br />MM4.4-1(b) If evidence of an archaeological site or other suspected historical <br />■ Retain qualified <br />■ During construction <br />■ Project <br />resource as defined by CEQA Guidelines Section 15064.5, including darkened <br />archeologist <br />period <br />Applicant <br />soil representing past human activity ("midden"), that could conceal material <br />■ In the event cultural <br />■ City of Santa <br />remains (e.g., worked stone, fired clay vessels, faunal bone, hearths, storage <br />resources are <br />Ana Planning <br />pits, or burials) are discovered during any project -related earth -disturbing <br />encountered, record with <br />and Building <br />activities (including projects that would not encounter undisturbed soils), all <br />the SCCIC <br />Agency <br />earth -disturbing activity within 100 feet of the find shall be halted and the City <br />of Santa Ana shall be notified. The project applicant shall retain an <br />archaeologist who meets the Secretary of the Interior's Professional <br />Qualifications Standards for Archaeology to assess the significance of the find. <br />Impacts to any significant resources shall be mitigated to a less -than - <br />significant level through data recovery or other methods determined adequate <br />by the archaeologist and that are consistent with the Secretary of the Interior's <br />Standards for Archaeological Documentation. Any identified cultural resources <br />shall be recorded on the appropriate DPR 523 (A-L) form and filed with the <br />SCCIC. <br />MM4.4-2(a) Prior to any earth -disturbing activities (e.g., excavation, trenching, <br />■ Retain professional <br />■ Prior to project <br />■ Project <br />grading) that could encounter undisturbed soils, the project applicant shall <br />paleontologist <br />approval <br />Applicant <br />retain a professional paleontologist to determine if the project could directly or <br />m Prepare and submit <br />■ City of Santa <br />indirectly destroy a unique paleontological resource or site or unique geologic <br />technical report or <br />Ana Planning <br />feature. The investigation shall include, as determined appropriate by the <br />memorandum for review <br />and Building <br />paleontologist and the City of Santa Ana, a paleontology records check and a <br />and approval by the City <br />Agency <br />pedestrian survey of the area proposed for development. The results of the <br />investigation shall be documented in a technical report or memorandum that <br />11-14 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table 11 -1 Mitigation <br />Monitoring and Reporting Program Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure <br />Action Required Monitoring Phase Agency/Party <br />identifies the paleontological sensitivity of the development area and includes <br />recommendations and methods for eliminating or avoiding impacts on <br />paleontological resources or unique geologic features. The technical report or <br />memorandum shall be submitted to the City for approval. As determined <br />necessary by the City, environmental documentation (e.g., CEQA <br />documentation) prepared for future development within the project site shall <br />reference or incorporate the findings and recommendations of the technical <br />report or memorandum. The project applicant shall be responsible for <br />implementing methods for eliminating or avoiding impacts on paleontological <br />resources or unique geologic features identified in the technical report or <br />memorandum. Projects that would not encounter undisturbed soils and would <br />therefore not be required to retain a paleontologist shall demonstrate non - <br />disturbance to the City through the appropriate construction plans or <br />geotechnical studies prior to any earth -disturbing activities. Projects that would <br />include any earth disturbance (disturbed or undisturbed soils) shall comply <br />with MM4.4-3(b). <br />MM4.4-2(b) Should paleontological resources (i.e., fossil remains) be <br />■ In the event that <br />■ Prior to issuance of <br />■ Project <br />identified at a particular site during project construction, the construction <br />paleontological resources <br />grading permits <br />Applicant <br />foreman shall cease construction within 100 feet of the find until a qualified <br />are encountered, <br />■ City of Santa <br />professional can provide an evaluation. Mitigation of resource impacts shall be <br />Implement mitigation <br />Ana Planning <br />implemented and funded by the project applicant and shall be conducted as <br />m Incorporate mitigation in <br />and Building <br />follows: <br />contract specifications and <br />Agency <br />1. Identify and evaluate paleontological resources by intense field survey <br />construction documents <br />where impacts are considered high <br />2. Assess effects on identified sites <br />3. Consult with the institutional/academic paleontologists conducting <br />research investigations within the geological formations that are slated to <br />be impacted <br />4. Obtain comments from the researchers <br />5. Comply with researchers' recommendations to address any significant <br />adverse effects where determined by the City to be feasible <br />In considering any suggested mitigation proposed by the consulting <br />paleontologist, the City of Santa Ana staff shall determine whether avoidance <br />is necessary and feasible in light of factors such as the nature of the find, <br />project design, costs, applicable policies and land use assumptions, and other <br />considerations. If avoidance is unnecessary or infeasible, other appropriate <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-15 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting Program <br />Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required Monitoring Phase <br />Agency/Party <br />measures (e.g., data recovery) shall be instituted. Work may proceed on other <br />parts of the project site while mitigation for paleontological resources is carried <br />out. <br />MM4.4-3 Prior to development activities that would demolish or otherwise <br />■ Submit technical report or <br />■ Prior to issuance of <br />■ Project <br />physically affect buildings or structures 50 years old or older or affect their <br />memorandum for approval <br />demolition permits <br />Applicant <br />historic setting, the project applicant shall retain a cultural resource <br />by the City <br />■ City of Santa <br />professional who meets the Secretary of the Interior's Professional <br />■ Implement identified <br />Ana Planning <br />Qualifications Standards for Architectural History to determine if the project <br />measures <br />and Building <br />would cause a substantial adverse change in the significance of a historical <br />Agency <br />resource as defined in Section 15064.5 of the CEQA Guidelines. The <br />investigation shall include, as determined appropriate by the cultural resource <br />professional and the City of Santa Ana, the appropriate archival research, <br />including, if necessary, an updated records search of the South Central <br />Coastal Information Center (SCCIC) of the California Historical Resources <br />Information System (CHRIS) and a pedestrian survey of the proposed <br />development area to determine if any significant historic -period resources <br />would be adversely affected by the proposed development. The results of the <br />investigation shall be documented in a technical report or memorandum that <br />identifies and evaluates any historical resources within the development area <br />and includes recommendations and methods for eliminating or reducing <br />impacts on historical resources. The technical report or memorandum shall be <br />submitted to the City Santa Ana for approval. As determined necessary by the <br />City, environmental documentation (e.g., CEQA documentation) prepared for <br />future development within the project site shall reference or incorporate the <br />findings and recommendations of the technical report or memorandum. The <br />project applicant shall be responsible for implementing methods for eliminating <br />or reducing impacts on historical resources identified in the technical report or <br />memorandum. Such methods could include, but not be limited to, written and <br />photographic recordation of the resource in accordance with the level of <br />Historic American Building Survey (HABS) documentation that is appropriate <br />to the significance (local, state, national) of the resource. <br />11-16 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Venrcation <br />Initial <br />Date <br />Comments <br />Mtigation Measure <br />Acton Required <br />Monitoring Phase <br />Agency/Party <br />mainline breaks, and eliminating over -watering and flooding due to pipe and/or <br />head breaks. <br />M111114.2-29 Landscape designers shall ensure that Project landscaping of <br />■ Include in landscaping plan <br />■ Prior to issuance of <br />■ Project <br />commercial/industrial/common areas uses drought -tolerant and smog -tolerant <br />and design plans <br />certificate of <br />Applicant <br />trees, shrubs, and groundcover to ensure long-term viability and conserve <br />m Verification at inspection <br />occupancy <br />■ City of Santa <br />water and energy. <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-30 Landscape designers shall ensure that the landscape plan includes <br />■ Include in landscaping plan <br />■ Prior to issuance of <br />■ Project <br />drought resistant trees, shrubs, and groundcover within the parking lot and <br />and design plans <br />certificate of <br />Applicant <br />perimeter. <br />■ Verification at inspection <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-31 Project designers shall ensure that design features incorporate <br />■ Include in design plans <br />■ Prior to approval of <br />■ Project <br />light-colored roofing materials that will deflect heat away from the building and <br />. Verification at inspection <br />each potential <br />Applicant <br />conserve energy. <br />future development <br />m City of Santa <br />project <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-32 The Project designers shall ensure that designs include all <br />■ Include in design plans <br />■ Prior to approval of <br />■ Project <br />illumination elements to have controls to allow selective use as an energy <br />each potential <br />Applicant <br />conservation measure. <br />future development <br />m City of Santa <br />project <br />Ana Planning <br />and Building <br />Agency <br />M111114.2-33 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />demonstrate that measures have been included to promote ride sharing <br />document for review and <br />building permit <br />Applicant <br />programs such as, but not necessarily including, publishing ride sharing <br />approval <br />■ Prior to issuance of <br />■ City of Santa <br />information for all of the tenants, designating a certain percentage of parking <br />0 Confirm installation of <br />occupancy permit <br />Ana Planning <br />spaces for ride sharing vehicles, designating adequate passenger loading and <br />design features and <br />and Building <br />unloading and waiting areas for ride sharing vehicles, and providing a website <br />equipment <br />Agency <br />or message board for coordinating rides. Documentation of compliance with <br />this measure shall be provided to the City Building Official for review and <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-11 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Miitigation Measure <br />Action Required <br />Monitoring Phase <br />Agency/Party <br />approval. Installation of the identified design features or equipment will be <br />confirmed by the City Building Official prior to issuance of certificate of <br />occupancy. <br />MM4.2-34 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />demonstrate that measures have been included to provide adequate bicycle <br />document for review and <br />building permit <br />Applicant <br />parking near building entrances to promote cyclist safety, security, and <br />approval <br />■ Prior to issuance of <br />■ City of Santa <br />convenience. Documentation of compliance with this measure shall be <br />o Confirm installation of <br />occupancy permit <br />Ana Planning <br />provided to the City Building Official for review and approval. Installation of the <br />design features and <br />and Building <br />identified design features or equipment will be confirmed by the City Building <br />equipment <br />Agency <br />Official prior to issuance of certificate of occupancy. <br />MM4.2-35 Prior to issuance of any certificate of occupancy, the applicant shall <br />■ Confirm installation of <br />■ Prior to issuance of <br />■ Project <br />demonstrate that all interior building lighting supports the use of compact <br />design features and <br />occupancy permit <br />Applicant <br />fluorescent light bulbs or equivalently efficient lighting to the satisfaction of the <br />equipment <br />■ City of Santa <br />City Building Official. <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-36 Tenants shall be responsible to ensure that preferential parking <br />■ Inform tenants of <br />■ Prior to issuance of <br />■ City of Santa <br />spaces are allocated to ultra -low emission vehicles and alternative fueled <br />preferential parking space <br />certificate of <br />Ana Planning <br />vehicles to encourage the use of alternative fuels and ultra -low emission <br />policy <br />occupancy and On- <br />and Building <br />vehicles. <br />going through <br />Agency <br />individual project <br />■ Project <br />operation <br />Applicant <br />Biological Resources <br />MM4.3-1 To ensure that avian species of concern, protected migratory species <br />■ Incorporate measures in <br />■ Prior to issuance of <br />■ Project <br />(e.g., MBTA), or raptors species are not injured or disturbed by construction in <br />contract specifications and <br />grading permit <br />Applicant <br />the vicinity of nesting habitat, the project applicant shall implement the <br />construction documents <br />■ During construction <br />■ City of Santa <br />following measures: <br />Ana Planning <br />1. Tree removal shall be restricted to the period between August 30 and <br />and Building <br />February 15, to the extent feasible, to avoid the breeding season of any <br />Agency <br />migratory species that could be using the area, and to discourage nesting <br />in the vicinity of an upcoming construction area. If it is not feasible to <br />remove trees outside this window then, prior to the beginning of mass <br />grading, including grading for major infrastructure improvements, during <br />the period between February 15 and August 30, all trees within 250 feet of <br />any grading or earthmoving activity shall be surveyed for active nests by a <br />11-12 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table 11 -1 Mitigation Monitoring and Reporting <br />Mitigation Measure Action Required <br />Program <br />Monfforing Phase <br />Matrix <br />Responsible <br />Agency/Party <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />qualified biologist no more than 30 days prior to disturbance. If active <br />nests are found, and the site is within 250 feet of potential construction <br />activity, a temporary fence shall be erected, where appropriate, around <br />the tree(s) at a distance of up to 250 feet, depending on the species, from <br />the edge of the canopy to prevent construction disturbance and intrusions <br />on the nest area. The appropriate buffer shall be determined in <br />consultation with the City of Santa Ana Park Naturalist or a designee. <br />2. No construction vehicles shall be permitted within restricted areas (i.e., <br />protection zones), unless directly related to the management or protection <br />of the legally protected species. <br />3. If a legally protected species nest is located in a tree designated for <br />removal, the removal shall be deferred until after August 30, or until the <br />adults and young of the year are no longer dependent on the nest site as <br />determined by a qualified biologist. <br />Cultural Resources <br />MM4.4-1(a) Prior to any earth -disturbing activities (e.g., excavation, trenching, <br />■ Retain a qualified <br />■ Prior to issuance of <br />■ Project <br />grading) that could encounter undisturbed soils, the project applicant shall <br />archeologist to prepare <br />grading permits <br />Applicant <br />retain an archaeologist who meets the Secretary of the Interior's Professional <br />technical report or <br />■ City of Santa <br />Qualifications Standards for Archaeology to determine if the project could <br />memorandum <br />Ana Planning <br />result in a substantial adverse change in the significance of an archaeological <br />o Submit project -specific <br />and Building <br />resource pursuant to Section 15064.5 of the CEQA Guidelines or disturb <br />environmental <br />Agency <br />human remains. The investigation shall include, as determined appropriate by <br />documentation relating to <br />the archaeologist and the City of Santa Ana, an updated records search of the <br />archeological resources <br />South Central Coastal Information Center (SCCIC) of the California Historical <br />Or <br />Resources Information System (CHRIS), updated Native American <br />consultation, and a pedestrian survey of the area proposed for development. <br />■ Demonstration of non - <br />The results of the investigation shall be documented in a technical report or <br />disturbance <br />memorandum that identifies and evaluates any archaeological resources <br />within the development area and includes recommendations and methods for <br />eliminating or avoiding impacts on archaeological resources or human <br />remains. The measures shall include, as appropriate, subsurface testing of <br />archaeological resources and/or construction monitoring by a qualified <br />Native American Monitor selected from a locally affiliated Tribe identified by <br />professional and i� necessary appropriate Native American monitors <br />identified by -the -applicable tribe-( the-Gabrielino Tengva Nation) and/or <br />the Native American Heritage Commission. The methods shall also include <br />procedures for the unanticipated discovery of human remains, which shall be <br />in accordance with Section 5097.98 of the State Public Resources Code and <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84113) EIR 11-13 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Responsible <br />Compliance Venrcation <br />Initial <br />Date <br />Comments <br />Mtigation Measure <br />Acton Required <br />Monitoring Phase <br />Agency/Party <br />MM4.2-19 The developer shall require by contract specifications that materials <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Project <br />that do not require painting be used during construction to the extent feasible. <br />q P 9 9 <br />contracts specifications <br />P <br />grading permits <br />9 9 P <br />Applicant <br />PP <br />Contract specifications shall be included in the proposed project construction <br />m Review and approve <br />■ Construction <br />documents, which shall be reviewed and approved by the City of Santa Ana. <br />project -specific <br />Contractor <br />construction documents <br />■ City of Santa <br />■ Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.2-20 The developer shall require by contract specifications that pre- <br />■ Include in project -specific <br />■ Prior to issuance of <br />■ Project <br />painted construction materials be used to the extent feasible. Contract <br />contract specifications <br />grading permits <br />Applicant <br />specifications shall be included in the proposed project construction <br />m Review and approve <br />■ Construction <br />documents, which shall be reviewed and approved by the City of Santa Ana. <br />project -specific <br />Contractor <br />construction documents <br />■ City of Santa <br />■ Monitor construction <br />Ana Planning <br />activities <br />and Building <br />Agency <br />MM4.2-21 As individual components of the Transit Zoning Code (SD 84A and <br />■ Prepare project -specific air <br />■ Prior to approval of <br />■ City of Santa <br />SD 84B) are implemented, an air quality impact analysis will be completed to <br />quality impact analysis <br />each potential <br />Ana Planning <br />determine their independent significance levels. Mitigation is to be <br />m Review of air quality impact <br />future development <br />and Building <br />incorporated at the individual component level to bring the individual <br />analysis <br />project <br />Agency <br />components to less than significant on a site -by -site basis. <br />MM4.2-22 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />demonstrate that the design of the proposed buildings or structures exceeds <br />documentation for review <br />building permit <br />Applicant <br />current Title 24 requirements (Title 24, Part 6 of the California Code of <br />and approval <br />■ City of Santa <br />Regulations; The Energy Commission adopted the 2008 ;Standards on April <br />Ana Planning <br />23, 2008, and the Building Standards Commission approved them for <br />Out Of date <br />and Building <br />publication on September 11, 2008. The 2008 Residential Compliance Manual <br />Code references <br />Agency <br />was adopted by the Commission on December 17, 2008, and the 2008 Non- <br />residential Compliance Manual was adopted January 14, 2009.Energy <br />Efficiency Standards for Residential and Non Residential Buildings, as <br />amended November 1, 2005; Cool Roof Coatings performance standards as <br />amended September 11, 2006) by a minimum of 20 percent, subject to review <br />by the County Building Official. Documentation of compliance with this <br />measure shall be provided to the Planning Department and Building Official for <br />review and approval prior to issuance of the permit. Installation of the identified <br />11-8 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table I 1 -1 Mitigation Monitoring and Reporting <br />Program Matrix <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required <br />Monitoring Phase Agency/Party <br />design features or equipment will be confirmed by the County Building Official <br />prior to certificate of occupancy. Any combination of the following design <br />features may be used to fulfill this mitigation provided that the total -increase in <br />efficiency meets or exceeds 20 percen : <br />■ Increase in insulation such that heat transfer and thermal bridging is <br />minimized <br />■ Limit air leakage through the structure or within the heating and cooling <br />distribution system to minimize energy consumption <br />■ Incorporate dual -paned or other energy efficient windows <br />■ Incorporate energy efficient space heating and cooling equipment <br />■ Incorporate energy efficient light fixtures <br />Is Incorporate energy efficient appliances <br />Is Incorporate energy efficient domestic hot water systems <br />■ Incorporate solar panels into the electrical system <br />■ Incorporate cool roofs/light-colored roofing <br />■ Or other measures that will increase the energy efficiency of building <br />envelope in a manner that when combined with the other options listed <br />P P <br />above exceeds current Title 24 Standards (Title 24, Part 6 of the California <br />Code of Regulations; Energy Efficiency Standards for Residential and Non <br />Residential Buildings, as amended November 1, 2005; Cool Roof <br />Coatings performance standards as amended September 11, 2006) by a <br />minimum of 20 percent <br />MM4.2-23 Prior to issuance of a building permit, the applicant shall provide a <br />■ Prepare project -specific <br />■ Prior to issuance of <br />■ Project <br />landscape plan for the Project that includes shade trees around main <br />landscape plans <br />building permit <br />Applicant <br />buildings, particularly along southern elevations where practical, and will not <br />. Submit compliance <br />■ City of Santa <br />interfere with loading dock locations or other operational constraints. <br />documentation for review <br />Ana Planning <br />Documentation of compliance with this measure shall be provided to the City <br />and approval <br />and Building <br />Building Official for review and approval. <br />Agency <br />City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR 11-9 <br />Chapter 11 Mitigation Monitoring and Reporting Program <br />Table 11 -1 Mitigation Monitoring and Reporting Program <br />Matrix <br />I <br />Responsible <br />Compliance Verification <br />Initial <br />Date <br />Comments <br />Mitigation Measure Action Required Monitoring Phase <br />Agency/Party <br />MM4.2-24 Prior to issuance of a building permit, the applicant shall <br />■ Submit compliance <br />■ Prior to issuance of <br />■ Project <br />demonstrate that the proposed building or structure designs incorporate <br />document for review and <br />building permit <br />Applicant <br />exterior storage areas for recyclables and green waste and adequate recycling <br />approval <br />■ Prior to issuance of <br />■ City of Santa <br />containers located in public areas. Documentation of compliance with this <br />m Confirm incorporation of <br />certificate of <br />Ana Planning <br />measure shall be provided to the City Building Official for review and approval. <br />design features and <br />occupancy <br />and Building <br />Installation of the identified design features or equipment will be confirmed by <br />equipment in design plans <br />Agency <br />the City Building Official prior to issuance of certificate of occupancy. <br />and construction <br />documents <br />MM4.2-25 The applicant shall provide education and publicity about reducing <br />■ Provide education and <br />■ Prior to issuance of <br />■ Project <br />waste and available recycling services to future tenants. The education and <br />publicity materials for <br />certificate of <br />Applicant <br />publicity materials shall be provided to the City for review and approval by the <br />review and approval <br />occupancy <br />■ City of Santa <br />Planning Department. <br />■ Provide education and <br />Ana Planning <br />publicity materials to future <br />and Building <br />tenants <br />Agency <br />MM4.2-26 All showerheads, lavatory faucets, and sink faucets within the <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />residential units shall comply with the California Energy Conservation flow rate <br />certificate of <br />Applicant <br />standards. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-27 Low -flush toilets shall be installed within all commercial and <br />■ Include in design plans <br />■ Prior to issuance of <br />■ Project <br />residential (including Congregate Care) units as specified in California State <br />certificate of <br />Applicant <br />Health and Safety Code Section 17921.3. <br />occupancy <br />■ City of Santa <br />Ana Planning <br />and Building <br />Agency <br />MM4.2-28 All commercial/industrial/common area irrigation areas shall be <br />■ Include in design plans <br />■ Prior to approval of <br />■ Project <br />capable of being operated by a computerized irrigation system which includes <br />each potential <br />Applicant <br />an on -site weather station/ET gage capable of reading current weather data <br />future development <br />m City of Santa <br />and making automatic adjustments to independent run times for each irrigation <br />project <br />Ana Planning <br />valve based on changes in temperature, solar radiation, relative humidity, rain, <br />■ Prior to issuance of <br />and Building <br />and wind. In addition, the computerized irrigation system shall be equipped <br />certificate of <br />Agency <br />with flow -sensing capabilities, thus automatically shutting down the irrigation <br />occupancy <br />system in the event of a mainline break or broken head. These features will <br />assist in conserving water, eliminating the potential of slope failure due to <br />11-10 City of Santa Ana Transit Zoning Code (SD 84A and SD 8413) EIR <br />Architecture + Planning <br />17911 Von Karman Ave. <br />Suite 200 <br />Irvine, CA 92614 <br />ktgy.com <br />949.851.2133 <br />KTGY Project No: 2017-0934 <br />Project Contact: Debbie Holland <br />Email: dholland@ktgy.com <br />Principal: Wil Wong <br />Project Designer: D. Schoolmeester <br />Project Director: Debbie Holland <br />Developer <br />EI7 OAK <br />4199 CAMPUS DRIVE <br />IRVINE, CA 92612 <br />PHONE NO. (714) 342-2502 <br />1 <br />TF <br />0 <br />Z <br />Q <br />2 <br />H <br />LO <br />T_ <br />L0 <br />015 <br />T_ <br />Nt <br />No. Date Description <br />It is the clients responsibility prior to or during construction to notify the architect in writing <br />of any perceived errors or omissions in the plans and specifications of which a contractor <br />thoroughly knowledgeable with the building codes and methods of construction should <br />reasonably be aware. Written instructions addressing such perceived errors or omissions <br />shall be received from the architect prior to the client or clients subcontractors proceeding <br />with the work. The client will be responsible for any defects in construction if these <br />procedures are not followed. <br />c&D ARC, ,, <br />�G R 0 <br />* No. C29795 <br />RENEWAL DATE <br />AUGUST 31, 2023 <br />OF CAS\ <br />License Stamp <br />CONDITIONS OF <br />APPROVAL <br />Z <br />Q <br />J <br />W <br />1 <br />0. <br />ILL <br />N <br />O <br />N <br />1 <br />Ir- <br />00 <br />0 <br />COPYRIGHT <br />AO-72 <br />