Laserfiche WebLink
BUTTER <br />C—N,.rmr, Manager's, Consulting Engineers <br />Mark M. Butier, Jr. <br />Project Director <br />ducting; electrical and instrumentation; site grading and improvements; 560 <br />(LF) of 15" gravity sewer pipe; 190 (LF) of 12" gravity sewer pipe; 545 (LF) of <br />10" force main; sewer manholes and appurtenances; and abandonment of <br />existing Segerstrom Lift Station. <br />Project Director, EW-1 Well Equipping Project; Fullerton, CA; Orange <br />County Water District (Estimated Completion: September 2017; Value: <br />$1,092,074)—Mr. Butier is overseeing the construction management and <br />inspection services team for the well equipping project, which is located on <br />private property in Fullerton Industrial Park. EW-1 was one of six extraction <br />wells that was part of a 2008 project to contain groundwater with elevated <br />concentrations of volatile organic compounds (VOCs). However, the project <br />was put on hold and the wellhead was not constructed, a pump was not <br />installed, and considerable biological growth formed inside EW-1 as it sat idle <br />for over eight years. The current project includes rehabilitation and <br />redevelopment of the well, completing construction of the wellhead, installing <br />a submersible pump and shroud, and constructing piping and a connection to <br />a nearby OCSD sewer trunk line in State College Blvd. for discharge of the <br />pumped groundwater. The Butier Team coordinated with OCWD, the <br />Contractor, and the property owner's association to select an acceptable <br />temporary piping route to the nearest storm drain. In addition, a grade <br />separation project is being constructed concurrently in State College Blvd. <br />adjacent to Fullerton Industrial Park. The Butier Team is the main point of <br />contact between the Contractor and the City of Fullerton„ OCTA and OCSD, <br />to assist in coordinating project construction activities. <br />Project Director, Chino II Well Field Equipping of Raw Water Wells Nos. <br />II-10 and II-11; Eastvale and Ontario, CA; (Chino Basin Desalter <br />Authority Completion: 2017; Value: $3.8 million)— The scope of work <br />included equipping of two water wells including, but not limited to, the <br />following: construction of 16'8" W x 41'4"L x 16"H reinforced masonry block <br />building; installation of 3,300 gpm vertical turbine stainless steel pumping unit <br />and 600 hp premium efficiency motor, 16-inch diameter epoxy lined steel <br />discharge header pipe, 12-inch diameter pump to waste piping, 16-inch <br />diameter flow meter, site pressure piping and tubing, valves, taps and Corp <br />stops, pressure gages, 16-inch diameter C905 PVC underground discharge <br />pipeline, and connection to existing 24-inch diameter discharge pipeline; and <br />on- and off -site electrical, including power, control, lighting, underground <br />electrical duct, instrumentation equipment and panels, switchgear, VFD and <br />motor control center equipment, and installation of SCADA equipment. The <br />project included close coordination with the City of Ontario, City of Eastvale, <br />County of San Bernardino County Flood Control District, Southern California <br />Edison, and local businesses and residents. <br />Project Director, Simon Ranch Reservoir, Booster Pump Station, and <br />Pipeline Replacement Project; North Tustin, CA; City of Tustin <br />(Duration: 0312020 — 08/2021; Value: $14.5 million) —Simon Ranch <br />Reservoir is located in North Tustin surrounded by a residential neighborhood of <br />