Laserfiche WebLink
BIJTIER <br />Construction 11an19e1, Consulting Cnglnevs <br />Mark M. Butier. Jr. <br />Project Director <br />large custom homes. The purpose of the project is to upgrade the aged <br />infrastructure to ensure continued domestic water and fire water protection for <br />the region. The current fire flow protection will be increased from 700 GPM to <br />over 3,000 GPM. The scope of work includes the demolition and removal of the <br />existing rectangular buried concrete reservoir and replacing it with a 1.0 MG <br />circular prestressed concrete tank. Additional scope items include replacement <br />of existing pipelines; construction of Zone 3 piping, as well as 5 new fire <br />hydrants; construction of a new booster pump station at the reservoir site; 1- 500 <br />kW standby emergency generator with an automatic transfer switch; Zone 3 and <br />Zone 1 interconnection through a pressure regulating valve; replacement of <br />asphalt at Valhalla and Outlook; and grading and shoring operations. <br />Project Director, Trampas Recycled Water Pump Station; San Juan <br />Capistrano, CA; Santa Margarita Water District (Est. Completion: <br />October 2020; Value: $5.3 million)— The scope of work for construction of <br />the TRWPS included; earthwork, precise grading, site improvements, CMU <br />building, perimeter fencing and motorized swing gate, drainage facilities, <br />electrical and telemetry equipment, vertical turbine booster pumps and <br />motors, buried piping, above -ground piping, manual and automated valves, <br />flow meters, surge tanks with air compressors, pump building with electrical <br />room, HVAC system for pump building, paving, concrete, instrumentation and <br />control systems, sound attenuating features, and cathodic protection. <br />