My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIJTIER <br />Construction 11an19e1, Consulting Cnglnevs <br />Mark M. Butier. Jr. <br />Project Director <br />large custom homes. The purpose of the project is to upgrade the aged <br />infrastructure to ensure continued domestic water and fire water protection for <br />the region. The current fire flow protection will be increased from 700 GPM to <br />over 3,000 GPM. The scope of work includes the demolition and removal of the <br />existing rectangular buried concrete reservoir and replacing it with a 1.0 MG <br />circular prestressed concrete tank. Additional scope items include replacement <br />of existing pipelines; construction of Zone 3 piping, as well as 5 new fire <br />hydrants; construction of a new booster pump station at the reservoir site; 1- 500 <br />kW standby emergency generator with an automatic transfer switch; Zone 3 and <br />Zone 1 interconnection through a pressure regulating valve; replacement of <br />asphalt at Valhalla and Outlook; and grading and shoring operations. <br />Project Director, Trampas Recycled Water Pump Station; San Juan <br />Capistrano, CA; Santa Margarita Water District (Est. Completion: <br />October 2020; Value: $5.3 million)— The scope of work for construction of <br />the TRWPS included; earthwork, precise grading, site improvements, CMU <br />building, perimeter fencing and motorized swing gate, drainage facilities, <br />electrical and telemetry equipment, vertical turbine booster pumps and <br />motors, buried piping, above -ground piping, manual and automated valves, <br />flow meters, surge tanks with air compressors, pump building with electrical <br />room, HVAC system for pump building, paving, concrete, instrumentation and <br />control systems, sound attenuating features, and cathodic protection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.