My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 37 - Construction Management and Inspection Services for Well 32 Rehabilitation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:03:42 PM
Creation date
8/15/2023 8:57:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Construction Progress Reports <br />The PM will prepare monthly progress reports that <br />will include the following items: summary of the prior <br />month's main accomplishments and current <br />construction activities; reconciliation of contract time, <br />work progress, and manpower usage by the <br />Contractor; project costs to date; overall contractor's <br />conformance to quality requirements; identification <br />of major issues addressed or arising from the project <br />requiring resolution; summary of progress payments, <br />certified payrolls, change order disputes, submittals, <br />RFIs and responses, and notices of noncompliance; <br />and daily photographs of representative project <br />activities. <br />2. Weekly Development <br />Team/Construction Meetings <br />The PM will schedule and lead weekly meetings with <br />the Contractor, the City's assigned Construction <br />Manager, and other representatives to resolve all <br />project matters and assess responsibilities for <br />response to respective participants. The PM will <br />implement action monitoring to ensure compliance <br />and timely response. The Contractor Administrator <br />(CA) will distribute the minutes to the attendees <br />within two working days and include the minutes in <br />the monthly progress reports. <br />3. Shop Drawings and Submittals <br />The Butier Team will be responsible for processing <br />and monitoring the status of submittals. In meeting <br />the City's internal timeframes, submittals will be <br />processed on a one -week turnaround basis or <br />sooner. Submittal tracking will be introduced into <br />the electronic document control system and status <br />of submittals will be known at all times. This system <br />will be coordinated with the Contractor per contract <br />document requirements. The PM will review the <br />completeness and quantity of all required shop <br />drawings, product data, samples and other <br />submittals received during the construction phase <br />and transmit to City staffing for review and <br />approval. <br />4. Requests for Information <br />The PM will coordinate the RFI review process and <br />route all RFIs to the appropriate reviewer. The <br />documentation will be logged, tracked, maintained, <br />UL) I ILK <br />City of Santa Ana, Public Works Agency <br />Well 32 Rehabilitation Improvements <br />Construction Management and Inspection Services, RFP No. 22-051 <br />and organized in the electronic document control <br />system in PDF format. All responses will be <br />monitored with suspense action dates and follow- <br />up procedures implemented to ensure timely action <br />by all parties to project issues including input from <br />City staff. <br />5. Permits <br />The Butier Team will verify that the Contractor has <br />secured all building permits and special permits <br />required by the contact documents. <br />6. Change Order Requests <br />The City or Contractor may initiate a change or <br />request for changes, or modifications may arise <br />due to differing site conditions. The PM will track, <br />document, and negotiate all changes for added <br />costs or credits with the Contractor. The PM will <br />evaluate all schedule impacts in addition to <br />advising the City of equitable cost and time <br />adjustments for proposed or authorized changes <br />including credits that are due. <br />The PM will coordinate change order procedures <br />for preparation of documents to be executed by the <br />Contractor and the City. The PM and claims <br />support will evaluate Contractor claims seeking <br />additional costs or time for contract modifications. <br />The PM will assess if the claim has merit and make <br />recommendations. Unresolved claims will be <br />administered through the remedies clauses of the <br />construction contract under the direction of the City. <br />7. Contractor's Safety Program <br />The Contractor will be required to prepare and <br />submit a safety program to the City. The Contractor <br />is responsible for site safety. The CM team will <br />monitor the Contractor's safety program and take <br />necessary steps to ensure the jobsite conditions <br />comply with OSHA regulations. They will periodically <br />attend the Contractor's site safety meetings to <br />validate the submitted plan is being monitored and <br />complies with OSHA regulations. <br />8. Cost Accounting Records <br />The Butier Team will maintain cost accounting <br />records on authorized work performed under unit <br />costs and additional work performed based on <br />actual costs of labor and materials, or other work <br />required accounting records. <br />17 F. SCOPE OF SERVICES S SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.