Laserfiche WebLink
Schedule & Cost Management: Developing a detailed fee estimate and schedule for the assignment <br />and the continuous monitoring of both throughout the task's duration are essential to meeting the <br />City's schedule and budget needs. <br />Responsiveness and Flexibility: The ability of the consultant's Project Manager to act quickly in <br />mobilizing the appropriate members of the consultant team is critical to meet the City's schedule <br />requirements. A consultant Project Manager must also be able to react and adapt quickly to project <br />and schedule changes once the technical work has begun. <br />Staff Continuity: Retaining the same key staff throughout the life of an on -call contract helps expedite <br />assignments and provide quality service. Our current and previous experience working on an on -call <br />basis has allowed the IBI team to polish these key skills, and we are eager and excited to utilize them <br />once again by offering our continued services to the City. <br />Knowledge <br />The City of Santa Ana is soliciting proposals to provide transportation and traffic engineering consulting <br />services on an as -needed basis for a variety of different services from design, project management, project <br />development, and traffic analysis services. IBI Group highlights our capabilities in the following areas: <br />Systems Engineering <br />IBI Group brings a rightsized Systems Engineering approach to technology solution projects to guide <br />development of our implementation plan and manage design and requirements development. "Right - <br />sized" to us means we scale the application of Systems Engineering principles to meet the needs of <br />the project. For example, because of the size and complexity of the project, for MTC we developed <br />and continue to update a Systems Engineering Management Plan to govern the technical work on <br />the project from initial concepts through system acceptance. We also create leaner applications of <br />the systems engineering approach where we focus on the critical aspects of building logically from a <br />needs assessment and prioritization through to technical requirements (what rather than how). We <br />have worked with clients at all stages of projects ensuring that this approach is followed, not just as a <br />standard, but because we have consistently found great success with it. This not only ensures that our <br />clients meet all Federal requirements tied to Federal funding, but also that their projects receive the <br />benefits of a well -managed implementation. <br />Traffic Feasibility and Striping Plans <br />IBI Group understands the importance of traffic feasibility studies to solid intersection design, including <br />intersection and arterial network analyses. IBI is an expert at using Synchro, SimTraffic, Traffix, and <br />HCS to prepare trip generation forecasts, identify trends from data, and perform HCM and/or ICU LOS <br />and/or VMT analysis as required. Final plans will be produced in AutoCAD and in accordance with the <br />2012 California Manual of Traffic Control Devices, 2010 Caltrans Standard Specifications and Plans, <br />the City of Irvine Standard Plans and Details. Our transportation engineers and planners have deep <br />experience working within Caltrans and City of Irvine guidelines to prepare feasibility and striping <br />plans. The IBI concept is to create a feedback loop that takes potential engineering and environmental <br />considerations as input and returns traffic operations outcomes. Through an iterative process of <br />alternatives screening and refinement we can work with the City of Irvine to select the most viable <br />preferred alternative. <br />On -Call Traffic Studies <br />The provision of on -call traffic studies requires firms to be available and responsive to assignments <br />issued by the City. IBI Group offers a full complement of locally -based and experienced staff capable <br />of providing services to the City. IBI Group is familiar with the City of Santa Ana guidelines and <br />requirements related to traffic impact and parking studies, having prepared several studies either <br />ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 <br />