My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and stakeholders, and will work collaboratively with these parties to ensure smooth execution of the <br />complete project plan. We understand that these projects may require clear communication with local <br />stakeholders and regional transportation agencies. <br />iasK s - uata uainering ana meview <br />IBI Group will prepare a detailed data needs memo following the initial meeting. IBI planners and engineers <br />have years of experience in working with municipal transportation departments. The project manager <br />understands that City staff has multiple demands on their time, therefore IBI Group correspondence will <br />be clear, concise, and well organized. Data requirements will be clearly detailed in order to save time. IBI <br />staff will research City records for prior approvals, including resolutions and conditions of approval, as <br />necessary. In addition, IBI Group has experience contracting traffic counts and performing field reviews. IBI <br />Group will review data gathered from other sources for accuracy and relevance. <br />Task 4 — Traffic Analysis Specific Tasks <br />In the category of traffic engineering, IBI Group will approach projects from a comprehensive <br />perspective. IBI Group understands that traditional traffic engineering and traffic modeling approaches <br />do not always support multi -modal planning. Further the transition to VMT-based analysis will require <br />adjustments to the approach in how traffic studies are completed and in the identification of project <br />mitigation measures. <br />IBI Group understands the importance of providing rigorous traffic engineering. As shown in our firm <br />qualifications, IBI has extensive experience in developing traffic generation and parking demand <br />estimates for innovative projects that include Transportation Demand Management (TDM) components. <br />We will apply our expertise in these areas on any projects to satisfactorily complete these assignments <br />for the City. <br />Task 5: Prepare Preliminary Design Plans <br />IBI Group will prepare plan, profile, typical sections and construction details including intersection <br />contour plans for street widening or areas of overlay and rehabilitation. Alternatives will be prepared <br />to evaluate various impacts, constraints, costs, and geometric solutions to achieve the proposed <br />street cross section and right-of-way. The traffic study will define the groundwork for identification <br />of the proposed improvements including number of lanes, location and length of turning pockets, <br />need for signals, etc. Development of project alternatives will involve coordination with the traffic <br />engineers to determine the geometric needs. Design will commence using an iterative process with the <br />traffic information to determine conceptual geometrics and determine if more than one alternative is <br />warranted. The team will assess the data along with project goals and objectives to develop alternatives <br />for further evaluation. <br />Task 6: Preliminary Cost Estimate <br />For each alternative, IBI will prepare a conceptual project cost estimate that details estimated quantities <br />and unit costs for major work items, including right-of-way acquisition, drainage improvements and <br />utility impacts. Project cost estimates will show quantities and unit prices with back-up calculations for <br />all quantities. Preliminary cost estimates will be provided at each draft submittal and a final estimate will <br />be provided with the final Project Design Report. <br />Task 7: Prepare Project Final Report <br />After the completion of the tasks above, IBI Group will prepare a Project Final Report in accordance <br />with the City of Santa Ana's requirements. <br />ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.