My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8: Review and Comment on Improvement Plans Regarding Traffic <br />Improvements <br />This task will include a review of the proposed vehicle circulation improvements and vehicle volumes <br />associated with the proposed project. IBI Group will review the improvement plans, analyzing the <br />impacts these improvements have on traffic, circulation, bicycles and pedestrians. IBI Group will <br />produce a technical memorandum summarizing the comments on the issues analyzed. <br />Task 9: Attendance at City Council and Commission Meetings <br />IBI Group recognizes the importance of attending City Council and Commission meetings for specific <br />traffic -related assignments, supplementing the City full-time as needed. Our project manager and <br />proposed staff have extensive experience with presentations at public meetings, Planning Commission <br />Meetings and City Council meetings. Our staff is fully capable of representing the City on traffic <br />engineering issues at these public meetings. <br />Sample Schedule <br />We anticipate that most projects assigned through this on -call would have a duration typically lasting <br />from one month to one year. The typical sequence of tasks would include: <br />1. Project Kick -Off and Data Gathering — 1 week to 1 month <br />2. Analysis, Design Development — 2 weeks to 2-3 months <br />3. City Review, Comment — 2 weeks to 1 month <br />4. Refinements and Updates to Work Products — 1 week to 1 month <br />5. Development of Final Report and/or Design Package — 2 weeks to 3 months <br />6. Final Review and Presentations — 2 weeks to 2 months <br />14 IBI GROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.