Laserfiche WebLink
Typical transportation planning studies conducted by Iteris include the following key tasks: <br />• Project scoping and coordination with City, identification of issues, identification of study <br />area, affected roadway and facilities, agreement on methodology <br />• Data collection including field review of existing transportation facilities near the project, <br />traffic data collection, collection and review of recent documents <br />• Analysis of the project including trip generation potential, mode split (auto, transit, truck, non - <br />motorized), capacity analysis of links and/or intersections, analysis of transit system impacts <br />• Deficiency identification — identify deficiencies in the transportation system caused either by <br />the project, by cumulative conditions, or both, in terms of level of service, traffic volumes, <br />future speeds <br />• Recommendations including physical improvements to intersections, lanes, bridges, freeway <br />facilities, transit facilities, bicycle facilities, other infrastructure, plus operational <br />improvements or changes <br />• Documentation that is clear and understandable to not only the technical professional, but <br />also to the public since transportation planning is often a key element of local projects <br />Traffic Engineering Design <br />Iteris will prepare traffic engineering plans, specifications and estimates (PS&E) conforming to the <br />latest City's and Caltrans' Standard, including: <br />• New traffic signal installation <br />• Traffic signal modifications <br />• Signing and striping <br />• Street lighting <br />• Work area traffic control <br />Traffic signal interconnect (twisted -pair copper, fiber- <br />optic and/or wireless) <br />• Intelligent Transportation System (ITS), e.g. CCTV <br />cameras, video detection <br />• Traffic Management Center (TMC) enhancements <br />In general, for developing the PS&E package for design plans, Iteris will complete the tasks as <br />identified by the City. These tasks in general will include, but not be limited to the following activities: <br />• Research of existing utility company and City records to coordinate proposed improvements <br />with existing field conditions. This activity is of prime importance to assure the accuracy of <br />the field conditions, early identification of utility conflicts and avoiding contract change orders <br />during the construction. <br />• Completion of design projects including plans, specifications, and engineer's construction <br />cost estimate. Specifications shall be written in Microsoft Word and both physical and <br />electronic copies shall be furnished to the City. The City will provide the specification <br />boilerplate to Iteris. <br />• All plans will be drawn using the MicroStation and be be completed per City Standards. <br />• All original plan sheets, the title sheet of the specifications, calculations, and reports shall be <br />signed and stamped by the Iteris' licensed professional engineer supervising the project. <br />These signed originals will then become property of the City. <br />Design parameters will conform to the latest guidelines of the California Vehicle Code; Caltrans <br />Standard Plans and Specifications; Highway Design Manuals. the Federal and California Manual on <br />Uniform Traffic Control Devices (MUTCD); and all other applicable local, county, state, and federal <br />policies, guidelines, codes, and regulations. <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) Iteris, Inc. 124 <br />