My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
➢ Add signage to the northbound direction along with lane line extensions to direct the motorist <br />in the left turn lane that they can enter the inner right -turn lane for access to the I-5 NB <br />Ramp. The northbound left/thru lane should have signage and lane extensions to direct the <br />motorist to use the outer right -turn lane for access to the I-5 NB Ramp. These improvements <br />are subject to the review and approval of the City of Santa Ana. <br />With the implementation of improvements, the queues are generally adequate under Year 2040 <br />Buildout Plus Project traffic conditions during both the AM and PM peak hours. However, the <br />southbound right -turn lane at Cabrillo Park Drive/4th Street may exceed the storage provided. As <br />an alternative, subject to review and approval of City staff, an option southbound through/right <br />lane in addition to the proposed southbound right -turn lane can be striped to provide additional <br />queuing storage. The implementation of the recommended improvements also helps to improve <br />congestion and limit unnecessary weaving/merging of vehicles that need to enter the I-5 NB <br />Ramp. <br />However, in the event that Fourth Street experiences "spikes" in congestion during the weekday <br />AM and PM peak hours, residents will very likely re-route themselves (self -monitor) and utilize <br />the northern Driveway on Park Court Place instead of the driveway on Fourth Street. The <br />intersections of Cabrillo Park Drive/Park Court Place and Cabrillo Park Drive/Fourth Street have <br />enough capacity to accommodate the additional trips. <br />■ Existing Plus Project Recommended Improvements — The following intersection improvements <br />are recommended to mitigate the impacts of the proposed Project under these conditions. <br />➢ No. 13 — SR-55 SB Ramps at Fourth Street: Modify the eastbound shared through/right- <br />turn lane to construct a free -right turn lane. Modify the existing traffic signal as necessary. <br />This improvement is subject to the review and approval of the City of Santa Ana and <br />Caltrans. Per City requirements, the Project may be expected to pay a fair-share/local fee to <br />cover the Project's fair share of the full construction costs needed to implement these <br />mitigation measures. <br />■ Year 2025 Cumulative Plus Project Recommended Improvements — The following intersection <br />improvements are recommended to mitigate the impacts of the proposed Project under these <br />conditions. <br />➢ No. 8 — I-5 NB Ramps at Fourth Street: Construct an additional westbound right -turn lane. <br />Modify the existing traffic signal as necessary inclusive any modifications to the traffic <br />signal phasing. This improvement is consistent with the Traffic Impact Study for the Metro <br />East Overlay Zone in the City of Santa Ana. This improvement is subject to the review and <br />approval of the City of Santa Ana and Caltrans. The proposed Project is expected to pay the <br />full construction cost needed to implement these mitigation measures. <br />➢ No. 13 — SR-55 SB Ramps at Fourth Street: Modify the eastbound shared through/right- <br />turn lane to construct a free -right turn lane. Modify the existing traffic signal as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.