Laserfiche WebLink
➢ Add signage to the northbound direction along with lane line extensions to direct the motorist <br />in the left turn lane that they can enter the inner right -turn lane for access to the I-5 NB <br />Ramp. The northbound left/thru lane should have signage and lane extensions to direct the <br />motorist to use the outer right -turn lane for access to the I-5 NB Ramp. These improvements <br />are subject to the review and approval of the City of Santa Ana. <br />With the implementation of improvements, the queues are generally adequate under Year 2040 <br />Buildout Plus Project traffic conditions during both the AM and PM peak hours. However, the <br />southbound right -turn lane at Cabrillo Park Drive/4th Street may exceed the storage provided. As <br />an alternative, subject to review and approval of City staff, an option southbound through/right <br />lane in addition to the proposed southbound right -turn lane can be striped to provide additional <br />queuing storage. The implementation of the recommended improvements also helps to improve <br />congestion and limit unnecessary weaving/merging of vehicles that need to enter the I-5 NB <br />Ramp. <br />However, in the event that Fourth Street experiences "spikes" in congestion during the weekday <br />AM and PM peak hours, residents will very likely re-route themselves (self -monitor) and utilize <br />the northern Driveway on Park Court Place instead of the driveway on Fourth Street. The <br />intersections of Cabrillo Park Drive/Park Court Place and Cabrillo Park Drive/Fourth Street have <br />enough capacity to accommodate the additional trips. <br />■ Existing Plus Project Recommended Improvements — The following intersection improvements <br />are recommended to mitigate the impacts of the proposed Project under these conditions. <br />➢ No. 13 — SR-55 SB Ramps at Fourth Street: Modify the eastbound shared through/right- <br />turn lane to construct a free -right turn lane. Modify the existing traffic signal as necessary. <br />This improvement is subject to the review and approval of the City of Santa Ana and <br />Caltrans. Per City requirements, the Project may be expected to pay a fair-share/local fee to <br />cover the Project's fair share of the full construction costs needed to implement these <br />mitigation measures. <br />■ Year 2025 Cumulative Plus Project Recommended Improvements — The following intersection <br />improvements are recommended to mitigate the impacts of the proposed Project under these <br />conditions. <br />➢ No. 8 — I-5 NB Ramps at Fourth Street: Construct an additional westbound right -turn lane. <br />Modify the existing traffic signal as necessary inclusive any modifications to the traffic <br />signal phasing. This improvement is consistent with the Traffic Impact Study for the Metro <br />East Overlay Zone in the City of Santa Ana. This improvement is subject to the review and <br />approval of the City of Santa Ana and Caltrans. The proposed Project is expected to pay the <br />full construction cost needed to implement these mitigation measures. <br />➢ No. 13 — SR-55 SB Ramps at Fourth Street: Modify the eastbound shared through/right- <br />turn lane to construct a free -right turn lane. Modify the existing traffic signal as necessary. <br />