Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />MitigationMeasures <br />Cabrillo Towers <br />MonitonngParty <br />Project <br />ImplementingParty <br />MitigationTiming <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Impact 4.4-3: Construction <br />Applicable Overlay Zone Mitigation Measures: <br />activities under the proposed <br />W-0Z4.4-5 If human remains are unearthed, State Health and Safety Code <br />Planning and <br />Project Applicant <br />During <br />project could result in the <br />Section 7050.5 require that no further disturbance shall occur until the County <br />Building <br />Construction <br />disturbance of human remains <br />coroner has made the necessary findings as to origin and disposition pursuant to <br />Agency/NAHC <br />interred outside of formal <br />Public Resources Code Section 5097.98. If the remains are determined to be of <br />cemeteries. <br />Native American descent, the coroner has 24 hours to notify the Native American <br />Heritage Commission (NAHC). The NAHC will then contact the most likely <br />descendant of the deceased Native American, who will then serve as consultant <br />on howto proceed with the remains. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Geology and Soils <br />Impact 4.5-1: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the proposed project could expose <br />MM-0Z4.5-1 A site -specific geotechnical study shall be conducted under the <br />Planning and <br />Project Applicant <br />Prior to Issuance of <br />People and/or structures to <br />direct supervision of a California. Registered Engineering Geologist or licensed <br />Building Agency <br />Grading <br />potentially substantial adverse <br />geotechnical engineer to assess detailed seismic, geological, soil, and <br />Permit/During <br />effects resulting from strong <br />groundwater conditions and develop recommendations to prevent or abate any <br />Project Design <br />seismic groundshaking. <br />identified hazards. The report shall specify foundation recommendations to ensure <br />issues associated with underlying soils are addressed. Construction of the project <br />shall comply with all recommendations in the geotechnical report. The study shall <br />follow applicable recommendations of CDMG Special Publication 117 where <br />applicable and shall include, but not necessarily be limited to the following: <br />■ Determination of the locations of any suspected fault traces and anticipated <br />ground acceleration at the building site <br />■ Potential for displacement caused by seismically induced shaking, liquefaction, <br />differential soil settlement, expansive and compressible soils, or other earth <br />movements or soil constraints <br />■ Evaluation ofdepth to groundwater <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />4-26 r'04 nf Santa Ana <br />City Council 18 — 425 10/3/2023 <br />