My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 Mitigation Monitoring and Reporting Program <br />Table <br />Impacts <br />4-2 Mitigation Monitoring Program for the First and <br />I MitigationMeasures <br />Cabrillo Towers <br />MonitonngParry <br />Project <br />ImplementingParty <br />MitigationTiming <br />Impact 4.5-5: The proposed <br />Applicable Overlay Zone Mitigation Measures: <br />development could be located on <br />MM-0Z4.5-2 The developer shall conduct expansion index tests in accordance <br />Planning and <br />Project Applicant <br />Prior to Project <br />expansive soil. <br />with UBC Standard 18-2 prior to project construction. The design of structural <br />Building Agency <br />Construction <br />elements shall include recommendations set fords bythe expansion indextests. <br />Project -Specific Mitigation Measures: <br />1Vo additional mitigation is required. <br />Hazards and Hazardous Materials <br />Impact 4.6-2: Implementation of <br />Applicable Overlay Zone Mitigation Measures: <br />the proposed project would not <br />MM-0Z4.6-1 A health risk assessment (HRA) for diesel exhaust shall be <br />Planning and <br />Project Applicant <br />Prior to Issuance of <br />result in the exposure of firture <br />prepared. Recommendations contained within the HRA shall be implemented in <br />Building Agency <br />Pemni&During <br />residents to diesel exhaust <br />project design. <br />Project Design <br />emissions, which could pose a <br />Project -Specific Mitigation Measures: <br />significant hazard. <br />No additional mitigation is required. <br />Impact 4.6-3: Construction and <br />Applicable Overlay Zone Mitigation Measures: <br />operation of the proposed project <br />W-0Z4.6-3 In the event that previously unknown or unidentified soil and/or <br />Planning and <br />Project Applicant <br />During <br />could expose construction workers <br />groundwater contamination that could present a threat to human health or the <br />Building Agency <br />Construction <br />or the public to significant health <br />environment is encountered during construction of the proposed project, <br />and safety hazards through <br />construction activities in the immediate vicinity of the contamination shall cease <br />reasonably foreseeable upset and <br />immediately. If contamination is encountered, a Risk Management Plan shall be <br />accident conditions involving the <br />prepared and implemented that (1) identifies the contaminants of concern and the <br />release of hazardous materials <br />potential risk each contaminant would pose to human health and the environment <br />into the environment. <br />during construction and post -development and (2) describes measures to be taken <br />to protect workers, and the public from exposure to potential site hazards. Such <br />measures could include a range of options, including, but not limited to, physical <br />site controls during construction, remediation, long-term monitoring, post - <br />development maintenance or access limitations, or some combination thereof. <br />Depending on the nature of contamination, if any, appropriate agencies shall be <br />notified (e.g., City of Santa Ana Fire Department). Ifneeded, a Site Health and <br />Safety Plan that meets Occupational Safety and Health Administration <br />requirements shall be prepared and in place prior to commencement of work in <br />any contaminated area. <br />Project -Specific Mitigation Measures: <br />No additional mitigation is required. <br />Metro East Mivarl I Ica Ovprla�i 7nna (\/nIi imp 111) 4-27 <br />City Council 18 — 426 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.