E. Relevant Project Experience
<br />1. Statement of Qualifications
<br />Arterials.
<br />Of San Bernardino: Traffic Signal Hardware Upgrade I Project
<br />i Cost: NTE $3.79M 1 2022 - 2023
<br />LAnser was recently selected by the City of San Bernardino to
<br />provide construction management, inspection, and source
<br />inspection services for the upgrades to various traffic signal
<br />hardware at 224 signalized intersections, in partnership with
<br />the City's Public Works/Engineering Division. Through HSIP
<br />Cycle 9 funding, the City received grants to upgrade Various
<br />Signal Hardware at 224 Signalized Intersections on Various
<br />This project will enhance traffic safety Citywide. Environmental
<br />clearance was completed in early 2021, and the construction contract was
<br />awarded in December 2021.
<br />• City of Murrieta: Jackson Avenue
<br />Widening, Extension, and Bridge Project
<br />($8M) I Prime, Construction Management
<br />Construction of the structural concrete support
<br />components of this 195' cast -in -place arch -culvert
<br />structure, consisting of six 24' wide arch cells that
<br />extend over Warm Springs Creek at the City of
<br />Murrieta's border with Temecula. This 12-month project connected Murrieta's
<br />Jackson Avenue with Temecula's Ynez Road and replaced the existing "Arizona
<br />Crossing." Responsibilities included daily observation, documentation, and
<br />digital recording of the erection of the concrete falsework and formwork, steel
<br />rebar installation, structural concrete placement, scheduling of concrete
<br />material sampling and testing, quality control monitoring and logging of
<br />concrete materials, pour dates, and laboratory test break results, organization
<br />of applicable RFI's, and submittals, concrete pour schedule review, and
<br />coordination with the design engineer, City Project Manager, and City Engineer.
<br />• San Diego Association Of Governments (SANDAG), 1-805/SR-94
<br />Transit Only Lane Project Cost: $311M I Timeline: 2020 - 2021
<br />• Coachella Valley: CV Link Multi -Modal Transportation Facility
<br />Project Cost: $100M 1 2020 - 2024
<br />• City of Irvine: Irvine Boulevard Improvements ($12M) I Prime,
<br />Inspection Services
<br />• Riverside County: Avenue 66 Grade Separation ($35M) 2019 - 20221
<br />Prime, Construction Management/Inspection Services
<br />• City of Irvine: Five Points Development ($150M) I Prime, Inspection
<br />Services
<br />• SBCTA: North First Avenue Bridge I Prime Construction Management
<br />CITY OF SANTA ANA I RFP NO: 23-122
<br />rences
<br />Client
<br />Project
<br />Contact
<br />City of Corona, CA
<br />On -Call Project
<br />(951) 817-5741
<br />Jeff Nelson,
<br />Management,Construction
<br />Jeff.nelson@
<br />Public Works
<br />Management, and
<br />Superintendent
<br />Inspection
<br />coronaca.gov
<br />City of Oceanside,
<br />CA
<br />(760) 435-5030
<br />Paul Pham, City
<br />Land Development
<br />ppham@oceansideca.
<br />Development
<br />org
<br />Engineer
<br />City of Murrieta, CA
<br />On -Call Project
<br />(951) 461-6076
<br />Jeffrey Hitch, PE,
<br />Management,Construction
<br />J hitch@muriettaca.
<br />Principal Engineer
<br />Management, Inspection,
<br />gov
<br />and Labor Compliance
<br />City of Temecula,
<br />As -Needed Construction
<br />(951) 693-3917
<br />CA
<br />Nick Minicilli, Senior
<br />Management and
<br />Nick.minicilli@
<br />Traffic Engineer
<br />Inspection Services
<br />temecula.gov
<br />As -Needed Project
<br />City of Irvine, CA
<br />Management,
<br />(949) 724-6442
<br />Alex Salazar, PE, CIP,
<br />Construction,
<br />asalazar@cityofirvine.
<br />Administrator
<br />Management, Inspection,
<br />org
<br />and Administrative
<br />Services
<br />County of Riverside
<br />Transportation
<br />On -Call Construction
<br />(951) 850-6068
<br />Department (RCTD)
<br />Management Services
<br />edatuin@rivco.org
<br />Elmer Datuin,
<br />Materials Manager
<br />City of Menifee, CA
<br />On -Call Project
<br />(951) 672-6777
<br />Carlos Geronimo,
<br />Management,
<br />cgeronimo@
<br />PE, Principal
<br />Construction
<br />cityofinenifee.us
<br />Engineer
<br />Management, Inspection,
<br />and Labor Compliance
<br />9 1 Anser Advisory
<br />
|