My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 10 - Agreements for On-Call Construction Management and Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:50:22 AM
Creation date
10/3/2023 11:28:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
10
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)>)) <br />2. Scope of Services and Schedule <br />Special Meetings <br />Special meetings may be required to address significant events or findings <br />during construction that warrant special attention or pose potential problems or <br />hazards to the completion of the project, particularly those which may result in <br />significant change orders or claims. Special issues will be discussed as they arise <br />and will also be addressed during the weekly construction progress meetings. <br />Anser will promptly investigate each special issue and make recommendations <br />as to a possible resolution. When and if a particular matter is in dispute, early <br />identification and settlement of conflicting issues will be sought by conferring <br />with the A&E firm and Contractor and, if necessary, resolution meetings will be <br />scheduled. Detailed documentation will be maintained. Each special issue will <br />be flagged, carefully tracked, and logged. Periodic summaries of special issues, <br />including the disposition of each, will be generated and used for discussion with <br />the City and during weekly progress meetings. <br />• Previous Meeting <br />• Overall Project Schedule <br />Special meetings may be <br />Comments <br />Status <br />required to address significant <br />• Health and safety <br />overall Project Budget <br />events or findings that <br />• Weather <br />Status <br />warrant special attention or <br />• SWPPP <br />• Contract Time Summary <br />pose potential problems or <br />• AQMD <br />Progress Payment of <br />hazards to the completion of <br />• Contract Finan[ialStatus <br />applicable), <br />theprojecl,particularlythose <br />• Progress <br />Change Order Requests <br />which may result insubstantial <br />• Schedule review <br />and Associated Costs <br />change orders orclaims. <br />• Submittal and RFI review <br />■ Summary Report of <br />Detailed documentation will <br />• Schedule QAIQC <br />Previous Month <br />be maintained. Each special <br />activities, QAJQC results <br />issue will be flagged, carefully <br />• Any task -specific issues <br />tracked, and logged. <br />Progress Reports <br />Anser will submit monthly progress reports to the City for review. This report <br />will give a comprehensive overview of the project financials, schedule, change <br />orders, and project risks. Additionally, this report will detail major milestone <br />activities achieved for the past month, as well as planned activities for the <br />following month. <br />Project Administration and Document Control <br />The Anser team understands that for the City to receive full funding <br />reimbursement for any federally funded projects, our team will have to create <br />and maintain hundreds of documents throughout the life of each project <br />duration to provide proof that the project was administered in accordance with <br />State and Federal guidelines. <br />There are several reports that the construction management team will prepare <br />for both the overall project team as well as the contractor. The reports below <br />are some of the necessary reports to keep a record of the project as well as <br />notify the contractor, City, and third -party personnel of project information, <br />issues, and concerns. <br />As -built Documents and Project Records <br />Throughout the project, we will keep and maintain redlined (as -built) project <br />plans and specifications documenting all changes during construction. At <br />project closeout phase, we will review Contractor's redlined as -built plans and <br />specifications submittal in comparison with our as -built plans and specifications <br />prior to sending Contractor's submittals to the Design Consultant. After <br />receiving record documents from Design Consultant, we will verify all record <br />documents and record these documents to City project records. We will obtain <br />and turn over all other project closeout documents, O&M manuals and all <br />closeout deliverables as required in Construction Contract Documents. We will <br />coordinate with the Design Consultant to review and accept project closeout <br />documents. <br />Schedule Control and Risk Mitigation <br />Anser practices a style of construction contract administration called active <br />risk mitigation management that emphasizes implementing best practices, <br />recognizing change, actively managing risk mitigation (i.e., averting claims), and <br />maintaining comprehensive progress documentation. Anser has a proven track <br />record of proactively helping public agencies mitigate and resolve disputes <br />during the construction period. Anser strongly advocates the use of the project <br />critical path method (CPM) schedule as the primary tool for collaborative <br />planning and coordination with the general contractor, documenting and <br />reporting progress, scenario -testing, decision -making, and measuring delays. <br />Throughout the project, Anser will review, analyze, and comment on the <br />CITY OF SANTA ANA I RFP NO: 23-122 11 1 Anser Advisory <br />
The URL can be used to link to this page
Your browser does not support the video tag.