Laserfiche WebLink
)>)) <br />2. Scope of Services and Schedule <br />per the contract requirements. The specifications will address the systems <br />and subsystems for which manuals and training are required, the media for <br />these materials, quantity, schedule, formatting standards, and other detailed <br />requirements. Anser will document all closeout procedures, tests, training, <br />and documentation in the Project Management Plan and submit a finalized <br />Plan to the City. <br />Notice of Completion <br />We will provide a recommendation to the City on Notice of Completion (NOC) date, <br />prepare a NOC document, and record the NOC with the City at the end of the project. <br />Project Acceptance and Turnover <br />Finally, we will collect, prepare, and submit to the City all Project documentation, <br />electronic files, brochures, material records, final as -built plans from Contractor, <br />warranties, operations and maintenance manuals, final punch -list, and all other <br />closeout documents to turn -over a successful Project to the City. <br />15. Community Outreach <br />Our proactive approach to communication and community engagement assists <br />and supplements the City's efforts to best provide transparency and enable <br />holistic support for your the project. Our members of our CM team will be <br />able to attend and co -lead a pre -construction meeting with the community <br />to discuss the major anticipated construction impacts. Our PM and PIC will <br />coordinate with the city's community liaison and communicate with the <br />community regarding impacts related to the construction project. <br />Anser will also be working with Mel Media to assist with our marketing and <br />outreach needs within the community. With more than 34 years of expertise, <br />MBI has taken part in some of California's most high -profile projects, facilitating <br />community dialogue about complex and sensitive issues throughout the region. <br />Our team of professionals is made up of individuals with diverse various cultural <br />backgrounds, allowing MBI to provide a wide range of services I <br />that are strategic, innovative, and effective. <br />UPI <br />These services range from public outreach, community and <br />stakeholder engagement, Virtual Meeting Rooms (VMRs), <br />media relations, campaign development, and branding that <br />are supported by our industry -leading, in-house design <br />studios, which specialize in graphic design, digital photography, <br />web design, video production, and 3-D animation, along <br />with technical writing, copy editing and copywriting. We bridge the gap <br />in communications for our clients and engage with Southern California <br />communities that are large and small, contentious and exuberant, multicultural <br />and multilingual. <br />16. Federal Requirements <br />The Anser team is familiar with preparing all the financial and bid documents <br />in accordance with LAPM Chapter 15 "Advertise and Award Project". We <br />will utilize the checklists (15-A; 15-13; and 15-C) from the chapter to verify <br />that critical contract items, such as Prevailing Wage Rates, FHWA-1273, <br />DBE commitment/goals, permits, rightof-way acquisition, and Caltrans <br />Authorizations to Advertise (E-76) are completed. Our team will also prepare a <br />Quality Control Management Plan (QMP) that outlines our testing frequencies <br />and processes to ensure material and construction quality as well as a Source <br />Inspection Quality Management Plan (SIQMP) that will outline inspection <br />and release procedures for specialty fabricated items such as post tension <br />assemblies, light poles, and bearing pads. The LAPM submittals, QMP, and <br />SIQMP will be given to the Caltrans Local Assistance Engineer to review and <br />concur with the advertisement of the project. <br />Contract Administration <br />Administering the contract includes managing and meeting all contractual <br />Commitments while allowing the contractor to focus on completing the project <br />without unnecessary delay or cost. Parties to these related commitments <br />include Caltrans Local Assistance, Cities, various permitting agencies, affected <br />utilities, the design team, and associated funding agreements. We adhere <br />to the Caltrans Local Assistance Procedures Manual (LAPM). All materials <br />and work performed will be documented through daily diaries, logs, reports, <br />certificates, and all required forms to ensure all cooperative agreement, <br />permit, and funding requirements are met. <br />Document Control and Filing <br />The Anser team understands that for the City to receive full funding <br />reimbursement for any federally funded projects, our team will have <br />to create and maintain hundreds of documents throughout each <br />project duration to provide proof that the project was administered <br />in accordance with State and Federal guidelines. The requirements <br />of the Caltrans LAPM provide the minimum filing system that we <br />must adhere to,but most of the proposed City projects are large and <br />complex in nature and the full 63-category fling system established <br />CITY OF SANTA ANA I RFP NO: 23-122 17 1 Anser Advisory <br />