My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SYRUSA ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
S
>
SYRUSA ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:41:48 PM
Creation date
10/9/2023 10:09:54 AM
Metadata
Fields
Template:
Contracts
Company Name
SYRUSA ENGINEERING, INC.
Contract #
A-2023-126
Agency
Public Works
Council Approval Date
7/18/2023
Expiration Date
7/17/2026
Insurance Exp Date
3/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
responsible for the failure of the Contractor to <br />carry out work in accordance with the contract <br />documents. However, any errors, omissions, <br />or discrepancies found in the Contract <br />Documents shall be called to the attention of <br />the City's Construction Manager and clarified <br />prior to construction starts. <br />Review contract documents and create a list <br />of errors, omissions, or discrepancies in the <br />contract documents prior to construction start. <br />15. Task/Deliverable: <br />Communication with City <br />Consult with the City when the contractor <br />requests interpretations of the meaning and <br />intent of the drawings and specifications, and <br />assist in achieving the resolution of problems, <br />which may arise. <br />Understand the contract documents to <br />respond to the contractor's requests for <br />interpretations, prior to construction. <br />Engage the city as needed. <br />16.Task/Deliverable: Project <br />Records <br />• Record the progress of the project. Submit <br />written daily and progress reports to the City. <br />• Keep daily logs containing a record of weather, <br />contractor's work on the site, number of <br />workers and equipment, work accomplished, <br />problems encountered, and other relevant <br />data. <br />• Make the log available to the City. Prepare and <br />send Weekly Statement of Working Days to <br />the contractor. <br />• Monitor contractor's compliance with labor <br />code requirements. <br />• Project Records will be completed in a timely <br />manner and independently reviewed for <br />accuracy. Facts and data, not opinions will be <br />included in documents. <br />17.Task/Deliverable: As Built Plans <br />• Maintain, in Procore, records of contract <br />documents including drawings, addenda, <br />change orders, and other modifications of <br />plans and specifications marked to show all <br />changes made during construction. <br />• Ensure contractor maintain as -built drawings <br />and upload onto Procore on a monthly basis. <br />• At the completion of the project, Consultant <br />shall deliver to the City all contract documents <br />in a folder filing system provided by the City. <br />• Ensure that the City's as-builts include <br />RFIs, shop drawing revisions, change order <br />modifications, etc. and are updated weekly. <br />• The as-builts will be submitted to the City and <br />the Design Engineer at the completion of the <br />project. <br />18.Task/Deliverable: City's Final <br />Inspection <br />• Evaluate the completion of the work of the <br />contractor and make recommendations to the <br />City when work is ready for final inspection. <br />Assist the City in conducting final inspections. <br />• Ensure work is completed in accordance with <br />the contract documents. Prepare a punch list <br />and clear list before City's final inspection. <br />19.Task/Deliverable: Agencies Final <br />Inspection <br />• Facilitate and coordinate inspection by <br />representatives of other agencies. <br />• Ensure work is completed in accordance with <br />the contract documents. <br />• Prepare a punch list and clear list before <br />City's final inspection. <br />20.Task/Deliverable: Testing <br />• Consultant shall hire subconsultant, or shall <br />perform the work in-house, to provide special <br />inspection and testing services. <br />• The Consultant shall determine the Materials <br />Testing & Special Inspection services as <br />required by the applicable guidelines. <br />• Special inspection services may be subject to <br />CWA. <br />• All material test results will be in accordance <br />with the Contractual Documents and test <br />methods. Failing test will be immediately <br />reported to the Resident Engineer. <br />21.Task/Deliverable: Budget <br />Assist the City with project budget tracking by <br />funding source to ensure progress payment <br />applications are applied appropriately to <br />correct funding sources. <br />Update the progress of the project monthly <br />and submit to the City with daily logs of <br />weather, contractor's work on site, number <br />of workers, equipment, work accomplished, <br />PAGE136A <br />An <br />SYRUS1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.