My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HEWLETT PACKARD ENTERPRISE COMPANY
Clerk
>
Contracts / Agreements
>
H
>
HEWLETT PACKARD ENTERPRISE COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 11:15:08 AM
Creation date
12/4/2023 11:14:47 AM
Metadata
Fields
Template:
Contracts
Company Name
HEWLETT PACKARD ENTERPRISE COMPANY
Contract #
A-2023-212
Agency
Information Technology
Council Approval Date
11/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Work — City of Santa Ana — High Touch Services <br />v1.4 <br />November 6, 2023 <br />2.2.2.2. Develop, apply, and test configurations for the datacenter and site level equipment for each <br />site type. <br />• ClearPass policies <br />• Mobility Controllers <br />• Switch configuration templates <br />2.2.2.3. Develop a design verification test plan and perform that test plan against the configured <br />equipment to ensure the datacenter and site level equipment meet the requirements <br />defined in the Requirements Document <br />2.2.2.4. Adjust the design document and equipment configurations to ensure the test plan meets or <br />exceeds the success criteria. <br />2.2.2.5. Configure Airwave maps <br />Add three (3) new maps to existing Airwave. <br />2.3. Phase III - Pilot <br />After the final design is approved, Aruba will provide local implementation services for up to five (5) <br />business days, not exceeding thirty-two (32) business hours. This will involve deploying and configuring <br />five (5) Aruba access switches, twenty (20) access points, and five (5) ClearPass policies as defined in <br />the design meetings. The new network setup will coexist with the existing wireless deployment, allowing <br />the City to migrate to the new setup over time. <br />2.3.1. Entrance Criteria <br />2.3.1.1. Completed Low Level Design Document <br />2.3.1.2. Completed Design Test Plan <br />2.3.2. Activities <br />Aruba will: <br />2.3.2.1. Develop the deployment and installation guides that will define the processes and <br />procedures used to place site level equipping into the production environment. <br />2.3.2.2. Develop a pilot verification test plan and perform that test plan against each site deployed <br />as part of the pilot to ensure the datacenter and site level equipment meet the requirements <br />defined in the Requirements Document. <br />2.3.2.3. Perform the pilot verification test plans for each site included in the pilot phase. <br />2.3.2.4. Collaboratively, with all stakeholders, develop a deployment and operational enablement <br />strategy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.