Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No-: -ga- 2 - q <br />Project: Warner Avenue Improvements Project PCO#: p TX5 7-- 6 <br />Project No.: 14-6802; 18.6424; 20-6618 Revision: 2/7/2023 <br />Owner: City of Santa Ana Date: 2107/1023 <br />Description of Work: Excavated trench for transitional structure, and installing shoring per <br />RFI 24 (Oak Road) - Support of the gas line and Sewer <br />LABOR <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />EXTENDED <br />Name & Classification <br />BENEFIT" <br />AMOUNTS <br />Regular I <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />119.42 <br />$162.78 <br />$955.36 <br />Guiilermo Saldana (Operator) <br />8 <br />$119.42 <br />$162.78 <br />$955.36 <br />Ramon Guillen (Foreman Masan) <br />8 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Masan) <br />8 <br />$93.83 <br />$125.90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />$93.83 <br />$125.90 <br />$750-64 <br />Cruz Benavente Chan (App) <br />0 <br />$71.25 <br />$98-67 <br />$0,00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />$71.25 <br />$98.67 <br />$570.00 <br />$0-00 <br />" Explain Additional Benefit' <br />SUBTOTAL <br />$4,781.52 <br />MU 20°l0 <br />$956.30 <br />_ <br />TOTAL LABOR <br />$5,737-82 <br />EQUIPMENT <br />SBY <br />OPP- <br />SBY <br />OPP. <br />OTHER <br />EXTENDED <br />Description <br />HRS. <br />HRS- <br />COST <br />COST <br />COSTS' <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052-00 <br />CAT 415E Skip Loader <br />$47-87 <br />CAT 45OF Backhoe Loader <br />❑ <br />$83.95 <br />CAT 450E Sackhoe Loader <br />$83-95 <br />$0,00 <br />CAT 950H Loader <br />$136,17 <br />$0.00 <br />CAT972H Loader <br />8 <br />$206-74 <br />$1,653.92 <br />CAT 262D Skid Steer Loader <br />$40.25 1 <br />$0-00 <br />CAT CB24B Roller <br />$38-72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36,28 <br />$0.00 <br />Dump Truck 2 axle <br />2 <br />$50,64 <br />$101.28 <br />Crew Truck 20000 LB <br />8 <br />$37.19 <br />$297.52 <br />Ater Truck 36i560-U8- <br />45. 04 <br />WOO <br />CAT 31 FF <br />0 <br />$61.38 <br />$0-00 <br />H 100 Hammer <br />0 <br />$19.84 <br />$0,00 <br />Explain Other Costs. SUBTOTAL <br />_ $4,104-72 <br />MU 15% <br />$615.71 <br />TOTAL EQUIPMENT <br />$4,72D.43 <br />MATERIAL <br />UNIT <br />EXTENDED <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />PRICE <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385-00 <br />$385.00 <br />314" Rock <br />ICY <br />20 <br />45-00 <br />$900.00 <br />6" pipe and fittings LS 1 570.00 <br />$670.01) <br />SUBTOTAL <br />$1,855,00 <br />MU 1596 <br />$278.F5 <br />TOTAL MATERIAL <br />$2,133-25 <br />OTHER WORK <br />UNIT <br />OTHER <br />EXTENDED <br />UNITS <br />OTY. <br />PRICE <br />COSTS* <br />AMOUNTS <br />$0.00 <br />$OAO <br />" Explain Other Costs. SUBTOTAL <br />_$0-00 <br />MU 15% <br />$0.00 <br />TOTAL OTHER WORK <br />$0.00 <br />If Above Record is Complete and Correct <br />Contractors Representative <br />7 2 <br />Owners Representative <br />IUTAL IAI:svrr ZD,13+.da� <br />TOAL EQUIPMENT $4,720-43 <br />TOTAL MATERIAL $2,133-25 <br />BOND 1% $0.00 <br />TOTAL THIS PROPOSAL $12,591.50 <br />114-'r? IF y <br />Novf?s <br />/44,TIFFa i 4 L <br />