Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Report No.: <br />Contractor: Lanerock, Inc. Re p -De, -2 V ! <br />Project: Warner Avenue Improvements Project PCO#: RF 4 �? <br />Project No.: 14-6802; 18.6424; 20.6618 Revision: 218I2023 <br />Owner: City of Santa Ana Date: 2/08/1023 <br />Description of Work: Excavated trench far transitional structure, and installing sharing per <br />RF124 (Oak Road) - Placing 1' rack on bottom <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT" <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />Guillermo Saldana (Operator) <br />Ramon Guillen (Foreman Mason) <br />8 <br />5 <br />8 <br />119.42 <br />$119.42 <br />$99.94 <br />$162,78 <br />$162.79 <br />$135.07 <br />955.76 <br />$716.52 <br />$799.5 <br />Salvador Saldana (Labor IV) <br />0 <br />$92.57 <br />$126.81 <br />0.06 <br />Ricardo Guillen (Cement Mason) <br />8 <br />$93.83 <br />$125.90 <br />$750.64 <br />iiamon Guillen Jr. (Mason) <br />8 <br />$93.83 <br />$125.90 <br />$750.64 <br />Cruz Benavente Chan (App) <br />8 <br />$71.25 <br />$98•67 <br />$570. 0 <br />Jesus Gomez (Labor IV) <br />0 <br />$92.57 <br />$125-81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />$71.25 <br />$98.67 <br />$570,00 <br />0.00 <br />Explain Addltional Benefit: <br />SUBTOTAL <br />MU 2B% <br />TOTAL LABOR <br />$5,112.68 <br />$1,02_2.54 <br />$6,135.22 <br />EQUIPMENT <br />Description <br />SBY <br />HRS, <br />OPP_ <br />HRS, <br />SBY <br />COST <br />❑PP. <br />COST <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />$256.50 <br />1,539.00 <br />CAT 415F Skip Loader <br />$47.87 <br />$0.00 <br />CAT 450F Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />00 <br />CAT 950H Loader <br />$136-17 <br />$0.00 <br />CAT 972H Loader <br />6 <br />$205.74 <br />$1,240.44 <br />CAT 262D Skid Steer Loader <br />$40-25 <br />$0.00 <br />CAT CB24B Rosier <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36-28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$60.64 <br />0-00 <br />Crew Truck 20000 LB <br />8 <br />$37.19 <br />$297.52 <br />Water Truc <br />504 <br />CAT 315F <br />0 <br />1 $61-38 <br />$0.00 <br />H100 Hammer <br />0 <br />$19.84 <br />$0.00 <br />' Explain Other Costs' <br />TOTAL <br />SUBTOTAL <br />$3,07&96 <br />MU 15% <br />$461.54 <br />$3.538.50 <br />EQUIPMENT <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />OTY_ <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$3B5.00 <br />314" Rock <br />CY <br />22 <br />45.00 <br />$990-00 <br />L5 <br />0 <br />0.00 <br />$0-00 <br />SU_ BTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$1,375.00_ <br />$2I]6.25 <br />$1,581.25 <br />OTHER WORK <br />UNITS <br />OTY- <br />UNIT <br />PRICE <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />.00 <br />Explain Other Costs: SUBTOTALI <br />MU 15%1 <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$om <br />if Above Record is Complete and Correct <br />Cantractar's R resentative <br />er's Represerrtative <br />1V1ALL RCD VK .pV, Iovj]" <br />TOAL EQUIPMENT $3,538.50 <br />TOTAL MATERIAL $1,581-25 <br />BOND 1%n $0.00 <br />TOTAL THIS PROPOSAL 11, 54. 7 <br />L <br />U�;■Y1`►tJn <br />kA-\ <br />