Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lone►ock, Inc. <br />Report No.: -2 <br />Project: Warner Avenue Improvements Project PCO#: R T- 2 <br />Project No.: 14-6802; 18-6424; 20-6618 Revision: 2/1712023 <br />Owner: City of Santa Ana Date: 2117123 <br />Description of Work: Install form for the wall and pout 14 cy of concrete <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />Ramon Guillen (Foremai <br />Salvador Saldana (Labor <br />Ricardo Guillen {Cement <br />Ramon Guillen Jr. (Masc <br />Cruz Benavente Chan (f <br />Jesus Gomez (Labor;V) <br />CAT 345CL Excavat <br />CAT 415F Skip Loac <br />CAT 45OF Backhoe <br />CAT 450E Backhoe <br />CAT 950H Loader <br />CAT 972H Loader <br />CAT 2621) Skid SteE <br />CAT CB24B Roller <br />Air Compressor 185 <br />Dump Truck 2 axle <br />Crew Truck 20000 L <br />Ater ruck 3 <br />CAT 315F <br />Generator <br />" Explain Other Cos <br />iTERIAL <br />Description (Attach Invoice) <br />Concrete <br />oncrete Pump <br />xposed soil <br />Explain Other Costs: <br />HOURS <br />lar OT <br />3 0.5 <br />$ 1.5 <br />0 <br />8� 0 <br />8 0.5 <br />5r <br />0 <br />8 ' 0.5 <br />HOURLY RATE ADDITIONAL I EXTENDED <br />,auiar I OT I BENEFIT" AMOUNTS <br />$135. <br />--$93.83 <br />$125.90 <br />$71-25 <br />$98.67 <br />$92.57 <br />$125.81 <br />-S71.25 <br />$98.67 <br />SBY OPP. SBY ❑PP. <br />HRS. HRS. COST COST <br />$187.72 <br />4 $256.50 <br />$47.87 <br />If Above Record is Complete and Correct <br />Gantraotor's Represe�tati�e <br />ner's Representalive / � <br />8 <br />UNITS <br />UNITS QTY <br />LS 0 <br />Load o <br />$136.17 <br />$206-74 <br />SUBTOTAL $4,936.95 <br />MU 20% ON 39 <br />iAL -LABOR $5,924.34 <br />OTHER EXTENDED <br />COSTS' AMOUNTS <br />$50.64 <br />iu.uu <br />$37.19 <br />$148.76 <br />45. 4 <br />$61.38 <br />$0.00 <br />$7-50 <br />$60.00 <br />SUBTOTAL <br />$1.234.7E <br />MU 15% <br />$185.21 <br />TOTAL EQUIPMENT <br />$1,419-97 <br />UNIT <br />EXTENDED <br />QTY- <br />PRICE <br />AMOUNTS <br />1 <br />385.00 <br />$385.00 <br />1 <br />0.00 <br />$0.00 <br />14 <br />165.00 <br />$2,310.00 <br />SUBTOTAL <br />$2,695.00 <br />- iulU 15° <br />$404.25 <br />TOTAL MATERIAL <br />$3,099.25 <br />UNIT <br />OTHER <br />EXTENDED <br />PRICE I <br />COSTS` I <br />AMOUNTS <br />so -Go ! 1 $0.00 <br />Bl`OTAL $0.00 <br />MU 15%1 $0.00 <br />TOAL EQUIPMENT $1,419-97 <br />TOTAL MATERIAL $3,099.25 <br />Taal Oter $0.00 <br />TOTAL THIS PROPOSAL $10,443.56 <br />