Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock. Inc. Report No-, A- <br />Project: Warner Avenue Improvements Project PCOM <br />Project No.: 14-6802; i 8-6424; 20-6618 Revision: 2121 /2023 <br />Owner: City of Santa Ana bate: 2121123 <br />Description of Work: Remove form for fhe wall and and cleaning transitional structure <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT"' <br />EXTENDED <br />AMOUNTS <br />Regular <br />❑T <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119.42 <br />_ $162.78 <br />$955,36 <br />Guillermo Saldana (Operator) <br />0 <br />0 <br />$119. 2 <br />162.78 <br />0.03 <br />Ramon Guillen (Foreman Mason) <br />8 <br />0 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor IV) <br />0 <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125.90 <br />750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />- 0 <br />$93.83 <br />$125.9❑ <br />$750.64 <br />Cruz Benavente Chan (App) <br />8 <br />0 <br />$71.25 <br />$9&67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />0 <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />❑ <br />$71.25 <br />$98.67 <br />$570,00 <br />0.❑0 <br />Explain Additional Benefit <br />- - - - <br />SUBTOTAL <br />$4,396.16 <br />$879.23 <br />$5,275.39 <br />MU 20% <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$16T52 <br />$0.00 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052.00 <br />CAT 415F Skip Loader <br />$4T87 <br />0.00 <br />CAT 45❑F Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136,17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0•00 <br />CAT 262iD Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0,00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$❑.00 <br />Crew Truck 20000 LB <br />4 <br />$37.19 <br />$148,76 <br />Water Truck 00 La <br />D <br />5. 4 <br />CAT 315F <br />D <br />$61.38 <br />$0.00 <br />Generator <br />0 <br />$7.50 <br />1 <br />$0.00 <br />'Explain Other Costs. <br />TOTAL <br />SUBTOTAL <br />Mi115% <br />EQUIPMENT <br />$2,200.79 <br />$330.11 <br />$2,530.87 <br />MATERIAL <br />Description [Attach Invoice] <br />UNITS <br />QTY_ <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385.0Q <br />Material <br />LS <br />1 <br />4_❑O <br />$0.00 <br />Concrete <br />CY <br />01 <br />165.00 <br />$0-00 <br />SUBTOTAL <br />MU 15%_ <br />TOTAL MATERIAL <br />$385.00 <br />$57.75 <br />$442.75 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />QTY_ <br />0 <br />UNIT <br />PRICE <br />$0-00 <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed soil <br />Load <br />0 <br />$300.00 <br />$0.00 <br />• Explain Other Costs! SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$0.06 <br />$0.00 <br />$0.00 <br />If Above Record is Complete and Correct <br />Contractor's Representative <br />7 <br />f• Owner's Representative F <br />TOTAL LABOR $5,215_n <br />TOAL EQUIPMENT $2,630.87 <br />TOTAL MATERIAL $442-75 <br />ToalOter $0.00 <br />TOTAL THIS PROPOSAL $8,249. <br />