My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: IVT-- <br />Project: Warner Avenue improvements Project PCO#: tom` I <br />Project No.: 14-6802; 18.6424; 20.6618 Revision: 212212023 <br />Owner: City of Santa Ana Date. 2/22/23 <br />Description of Work: Remove form for the wall and and cleaning transitional structure <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name 8 Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119.42 <br />162.78 <br />$955.36 <br />Guillermo Saldana (Operator) <br />0 <br />0 <br />$119-42 <br />$162,78 <br />$0-00 <br />Ramon Guillen (Foreman Mason) <br />8 <br />0 <br />$99A4 <br />$135.07 <br />$799,52 <br />Salvador Saldana (Labor IV) <br />0 <br />0 <br />$92-57 <br />$125,81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />8 <br />0 <br />$93.83 <br />$125.90 <br />$750.64 <br />Ramon Guillen Jr. (Mason) <br />8 <br />0 <br />$93-83 <br />$125-90 <br />$750-fi4 <br />Cruz Benavente Chan {App} <br />8 <br />0 <br />$71.25 <br />$98.67 <br />$570.00 <br />Jesus Gomez ILabor IV) <br />0 <br />0 <br />$92-57 <br />1 $125.81 <br />$0A0 <br />Jorge Alejandres (Labor App IV) <br />7 <br />0 <br />$71.25 <br />$98.67 <br />$498.75 <br />$o.00 <br />Expiain Additional Benefit: <br />SUBTOTAL <br />$4,324.91 <br />MU 20% <br />$864.98 <br />TOTAL LABOR <br />$6,189.89 <br />EQUIPMENT <br />Description <br />SBY <br />HRS- <br />OPP, <br />HRS, <br />SBY <br />COST <br />OPP- <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />8 <br />$256.50 <br />$2,052,00 <br />CAT 415F Skip Loader <br />$47.87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />0 <br />$83.96 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0,00 <br />CAT 950H Loader <br />$136A7 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50-64 <br />v.00 <br />Crew Truck 20000 LB <br />4 <br />$37-19 <br />$148-76 <br />Water Truck 36000 LB <br />0 <br />4 . <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />Generator <br />0 <br />$7.50 <br />$0.00 <br />Explain Other Costs: SUBTOTAL <br />MU 15% <br />TOTAL EQUIPMENT <br />$2,200.76 <br />$330.11 <br />$2,530.87 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Shoring <br />day <br />1 <br />385.00 <br />$385.00 <br />Material <br />LS <br />1 <br />0.00 <br />$0.00 <br />Concrete <br />ICY <br />1 <br />01 <br />165.00 <br />$0.00 <br />SUBTOTAL <br />MU 15°Ia <br />TOTAL MATERIAL <br />$385,00 <br />$57-75 <br />$442,75 <br />OTHER WORK <br />Concrete Pump <br />UNITS <br />LS <br />QTY- <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed soil <br />Load <br />0 <br />$300,00 <br />$0.00 <br />* Explain Other Costs' SUBTOTAL <br />MU 15% <br />TOTAL OTHER WORK <br />$0.00 <br />$0-00 <br />$0.00 <br />If Above Record is Complete and Correct <br />Cant Cs Rap ntativa � <br />f ner's FZ resentative <br />TOTAL LABOR <br />$5,189.89 <br />TOAL EQUIPMENT <br />$2,530.87 <br />TOTAL MATERIAL <br />$442-75 <br />ToalOter <br />$0.00 <br />TOTAL THIS PROPOSAL 1 $8.163.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.