Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue Improvements Project <br />Project No.: 14-6802; 18-6424; 20-6618 <br />Owner: City of Santa Ana <br />Report Flo.: 1p.� 3 IS— <br />PCOM <br />Revision, 6/26/2023 <br />Description of Work: Additional cost for installation waterservice V an <br />City requested b - changes on the drawing <br />Date: 612&2Z 5 <br />anae Armen. <br />LABOR <br />;,lame & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT` <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />$119.42 <br />$162,78 <br />$0.00 <br />Guillermo Saldana (Operator) <br />$ <br />$119.42 <br />162-78 <br />$955.36 <br />Ramon Guillen (Foreman Mason) <br />$99.94 <br />$135-07 <br />0.00 <br />Salvador Said ana (Labor IV) <br />0 <br />$92.57 <br />$125-81 <br />0.00 <br />Ricardo Guillen {Cement Mason} <br />$93-83 <br />$125-90 <br />$0.00 <br />Ramon Guillen Jr. (Mason) <br />3 <br />$93.83 <br />$125-90 <br />$281,49 <br />Cruz Benavente Chan (App) <br />$71.25 <br />$98.67 <br />$0.00 <br />Chris <br />8 <br />$71.25 <br />$98-67 <br />$570.00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (LaborApp IV) <br />8 <br />$71-25 <br />$98-67 <br />$570-00 <br />$0.00 <br />Explain Additional Benefit: <br />-- <br />SUBTOTAL <br />$2,376.$5 <br />$475.37 <br />$2,852.22 <br />�1IU 20°Io <br />TOTAL LA13OR <br />EQUIPMENT <br />Description <br />SHY <br />HRS- <br />OPP- <br />HRS- <br />SBY <br />COST <br />OPP, <br />COST <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187-52 <br />$0-00 <br />CAT 345CL Excavator <br />0 <br />$256-50 <br />$0-00 <br />CAT 415F Skip Loader <br />0 <br />$47-87 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83-95 <br />$0-00 <br />CAT 950H Loader <br />8 <br />$136.17 <br />$1,089.36 <br />CAT 972H Loader <br />$206-74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT CB246 Roller <br />$38-72 <br />$0.00 <br />Air Compressor 185 w1breaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />01 <br />$50-64 <br />$0.00 <br />Crew Truck 20000 LB <br />$37.19 <br />$0.00 <br />ater Truek 3150rnS <br />$45.04 <br />CAT 315E <br />8 <br />$61.38 <br />$491-04 <br />H100 Hammer <br />" Explain Other Casts: <br />$19.54 <br />SUBTOTAL <br />$0.00 <br />$1.580.40 <br />MU 15% <br />$237.06 <br />TOTAL <br />EQUIPMENT <br />$1,817.46 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS QTY- <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Pending <br />$0.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL. <br />$0.00 <br />$0.00 <br />�$0-00 <br />W-6 <br />OTHER WORK <br />Sawcut <br />UNITS <br />QTY. <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS' <br />0.04 <br />EXTENDED <br />AMOUNTS <br />0.00 <br />$0.00 <br />' Explain Other Costs: SUBTOTAL <br />MU 15%1 <br />TOTAL OTHER WORKI <br />$0-00 <br />$0.00 <br />$0.00 <br />If Above Record is�Complete and Correct <br />Contract is a entative <br />�/ Ownar'S Representative <br />TOTAL LABOR $2,852.22 <br />TQAL EQUIPMENT $1,817-46 <br />TOTAL MATERIAL $0,00 <br />BOND 9% $46.70 <br />TOTAL THIS PROPOSAL $4,716-38 <br />