Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. Report No.: w 3/45- <br />Project: Warner Avenue Improvements Project PCO#. 3 S <br />Project No.: 14.6802- 18-6424; 20.6618 Revision: 6/27/2023 <br />Owner. City of Santa Ana Date: 6/27123 <br />Description of Work: Additional cost for installation water service 1" on Orange Aven. <br />City requested b - changes on the drawing <br />Install saddle 1211" removed as halt and digging trench and around existing water meter box <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />Guillermo Saldana (Operator) <br />Ramon Guilken (Foreman Mason) <br />0 <br />8 <br />$119.42 <br />$119.42 <br />$99.94 <br />$162-78 <br />$162,79 <br />$135.07 <br />$0.00 <br />$955.36 <br />$0-00 <br />Salvador Saldana {Labor IV) <br />0 <br />$92,57 <br />$125B1 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125-90 <br />$a.00 <br />Raman Guillen Jr. (Masan) <br />0 <br />$93.83 <br />$125-90 <br />Q-00 <br />Crux Benavente Chan (App) <br />$71,25 <br />$98,67 <br />$0.00 <br />Chris <br />8 <br />$71,25 <br />$98,67 <br />$570-00 <br />Jesus Gomez (Labor IV) <br />0 <br />$92.57 <br />P25-81 <br />$0,00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />$71.25 <br />$98,67 <br />$570.00 <br />$Q.Da <br />Explain Additional Benefit: <br />SUBTOTAL <br />$2,095.36 <br />W9.07 <br />$2,514,43 <br />MU 20% <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP, <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />Q <br />$187.52 <br />$0-O5 <br />CAT 345CL Excavator <br />0 <br />$25E50 <br />$0.00 <br />CAT 415F Skip Loader <br />p <br />$47.87 <br />$0.00 <br />CAT 45OF Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />8 <br />$136.17 <br />$1,089-36 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40-25 <br />$0.00 <br />CAT C624B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36,28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50,64 <br />$0.00 <br />Crew Truck 20000 LB <br />$3TI9 <br />$0.00 <br />ater Truck 36000 LB <br />$4 .04 <br />CAT 315F <br />8 <br />$61,38 <br />$491.04 <br />H100 Hammer $19.84 <br />" Explain Other Costs: <br />TOTAL <br />__SUBTOTAL <br />MU 15% <br />$a•40 <br />$1,580.40 <br />$237.06 <br />$1,817.46 <br />EQUIPMENT <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />carp stop <br />EA <br />1 <br />79.00 <br />$79.00 <br />Steel Plate 10X6, <br />EA <br />6 <br />10-OD <br />$60,00 <br />sadllle EA <br />1 <br />221.00 <br />SUBTOTAL <br />$221,00 <br />$360.00 <br />$54.00 <br />$414-00 <br />MU 15% <br />TOTAL MATERIAL <br />OTHER WORK <br />Sawcut <br />UNITS <br />QTY. <br />0 <br />UNIT <br />PRICE <br />$D.00 <br />OTHER <br />COSTS" <br />0.00 <br />EXTENDED <br />AMOUNTS <br />$0-00 <br />Explain Other Costs: SUBTOTAL <br />MU ia% <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Above e ord is Complete and Correct <br />r <br />� antra p Ftepsentative <br />Owner's Reoresentaiive <br />roFAL LABOR $2,5-i4.43 <br />TOAL EQUIPMENT $1,81T46 <br />TOTAL MATERIAL $414-00 <br />BOND 1% $47,46 <br />TOTAL THIS PROPOSAL 1 $4,79335 <br />